Monday, June 8, 2026
ADVT 
India

Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Darpan News Desk IANS, 17 Apr, 2025 12:03 PM
  • Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Mumbai, April 17 (IANS) The breakthrough of the 1.65-kilometre underground tunnel on Mumbai Metro Line 7A, from Chhatrapati Shivaji Maharaj International Airport (T2) to Andheri East, was successfully completed on Thursday in the presence of Chief Minister Devendra Fadnavis.

The tunnel is being constructed by the Mumbai Metropolitan Region Development Authority (MMRDA).

The Chief Minister reviewed detailed information about the project from officials and initiated the breakthrough by pressing the button. He later inspected the work on-site. This particular tunnel is located on the downline of Metro Line 7A, between the Chhatrapati Shivaji Maharaj International Airport station and the Airport Colony station.

This metro link is a crucial segment of the Mumbai metropolitan area's expanding metro network. With this line, Mira-Bhayander and further up to Vasai-Virar will be connected to the international airport. Eventually, the Thane and Navi Mumbai International Airports will also be linked via metro. Currently, 59 per cent of the total work on Metro Line 7A has been completed.

According to the MMRDA, Metro Line 7A stretches over 3.4 kilometres, 0.94 km is elevated, and 2.5 km is underground. The line will have two stations: one elevated at Airport Colony and the other underground at the Chhatrapati Shivaji Maharaj International Airport. Out of the total length, 0.57 km is elevated, while the twin tunnels are 2.035 km long.

The first tunnel drive for the downline began on September 1, 2023. The 1.65-km tunnel includes 1,180 pre-cast rings used for lining, each ring specially designed and divided into six parts, with a tunnel diameter of 6.35 meters.

In September 2023, the Tunnel Boring Machine (TBM) was lowered 30 meters underground.

Despite multiple engineering challenges, passing under Metro Line 3, the Sahar Elevated Road, major sewer and water pipelines, the breakthrough was completed successfully. This new line will allow passengers to travel comfortably from Colaba to Vasai-Virar and Mira-Bhayander. It will also provide seamless integration with other metro lines in the city, including Metro Line 3 (Colaba-Bandra-SEEPZ), which connects to the underground airport station.

The blend of elevated and underground alignments ensures minimal land usage in densely populated airport zones, enabling a smoother metro construction process.

MORE India ARTICLES

Proclaimed offender of Punjab sacrilege cases held in Bengaluru

Proclaimed offender of Punjab sacrilege cases held in Bengaluru
Proclaimed offender of the highly sensitive 2015 Bargari sacrilege cases in Punjab, Sandeep Bareta, was arrested from the Bengaluru airport on Tuesday, police said.  A lookout notice issued against him by Punjab Police.

Proclaimed offender of Punjab sacrilege cases held in Bengaluru

As Punjab increases river water supply to Rajasthan, Akali Dal to stage protest

As Punjab increases river water supply to Rajasthan, Akali Dal to stage protest
With Punjab increasing river water supply to Rajasthan by 500 cusecs, the Shiromani Akali Dal said it would stage a protest in Abohar on Wednesday against Chief Minister Bhagwant Mann's "surrender on river waters".  Party President Sukhbir Badal will lead the protest that will begin at 11 a.m.

As Punjab increases river water supply to Rajasthan, Akali Dal to stage protest

One held at Madurai Airport with gold valued at Rs 96.18 lakh

One held at Madurai Airport with gold valued at Rs 96.18 lakh
The Customs officials have arrested a passenger at Madurai Airport and recovered 1,565 grams gold valued at Rs 96.18 lakh from him, officials said on Tuesday.  A senior Customs official said that the passenger was arrested following specific intelligence. The accused arrived at Madurai from Dubai.

One held at Madurai Airport with gold valued at Rs 96.18 lakh

Long queues, confusion in banks across Delhi as exchange of Rs 2,000 notes begins

Long queues, confusion in banks across Delhi as exchange of Rs 2,000 notes begins
Amar Singh, standing in a long queue at ICICI Bank branch in Green Park, said that there has been length of the line was there since the morning and chaos and confusion rules as bank staff are refusing to exchange the note and asking to deposit them.

Long queues, confusion in banks across Delhi as exchange of Rs 2,000 notes begins

Sisodia's letter from Tihar jail calls for education as key to equality, empowerment

Sisodia's letter from Tihar jail calls for education as key to equality, empowerment
Sisodia, through his letter which is written in Hindi, draws attention to the consequences of neglecting the education of the less fortunate, asserting that denying education to the impoverished not only perpetuates inequality but also fuels a vicious cycle of hatred and violence.

Sisodia's letter from Tihar jail calls for education as key to equality, empowerment

Aryan Khan case: SET report says NCB officials stole valuables of accused

Aryan Khan case: SET report says NCB officials stole valuables of accused
Sameer Wankhede, the former Mumabai zonal director of NCB, finds himself in a precarious position as allegations have emerged that he attempted to extort Rs 25 crore from Bollywood superstar Shah Rukh Khan in exchange of releasing his son Aryan Khan, who was accused in the Cordelia Cruise drugs case.

Aryan Khan case: SET report says NCB officials stole valuables of accused