Monday, June 8, 2026
ADVT 
National

Engine failure, bucket led to deadly helicopter crash during Alberta wildfire: TSB

Darpan News Desk The Canadian Press, 27 Feb, 2025 12:51 PM
  • Engine failure, bucket led to deadly helicopter crash during Alberta wildfire: TSB

The Transportation Safety Board of Canada says engine failure less than a minute into a flight contributed to a deadly helicopter crash during a 2023 wildfire in northern Alberta.

It says the helicopter's pilot had been tapped to help with firefighting efforts in the Peace River region and took off with an empty water bucket suspended from a 45-metre line.

Soon after, the pilot reported a mechanical issue, prompting him to turn around and return to base.

The board's investigation found the bucket hanging from the helicopter got caught in trees during its descent.

Although the pilot was able to disconnect the line, it caused him to lose full control of the aircraft and it went nose-down into the ground.

The pilot for Valhalla Helicopters Inc, identified as 41-year-old Ryan Gould of Whitecourt, Alta., survived the impact but later died of his injuries.

The board says investigators found a defect in the engine had worn on it over time and led to its failure.

Eight wildfire fighters died in the summer of 2023, a year in which the total area burned in Canada eclipsed the previous record by more than 2 1/2 times.

MORE National ARTICLES

Phone lines not meant for refund complaints: Coquitlam RCMP

Phone lines not meant for refund complaints: Coquitlam RCMP
Mounties in Coquitlam are reminding the public that its emergency and non-emergency lines are not meant for complaints about things like a cold fast-food burger. Police say that was one of many calls they had to 9-1-1 that take away staff time from helping someone with a life-threatening situation.   

Phone lines not meant for refund complaints: Coquitlam RCMP

Snow and cold in Metro Vancouver wreaks havoc on the roads

Snow and cold in Metro Vancouver wreaks havoc on the roads
An abrupt snowfall in Metro Vancouver resulted in snarled traffic and set off numerous crashes on major routes. Environment Canada says the area received about 3 centimetres of snow Thursday, which combined with freezing temperatures to create icy roads throughout the region.

Snow and cold in Metro Vancouver wreaks havoc on the roads

Canadians helped plan U.S., U.K. attacks on Houthis in Yemen: Defence Department

Canadians helped plan U.S., U.K. attacks on Houthis in Yemen: Defence Department
The Defence Department says Canadian Armed Forces members provided planning support for the U.S.-led attack on Houthi positions in Yemen Thursday but no Canadian equipment was involved. Three staff officers were deployed in December to the multinational operation in the Red Sea aimed at deterring Houthi blockades of the key shipping route. 

Canadians helped plan U.S., U.K. attacks on Houthis in Yemen: Defence Department

Housing crunch prompts efforts to stabilize immigration levels, say federal ministers

Housing crunch prompts efforts to stabilize immigration levels, say federal ministers
Housing Minister Sean Fraser and Immigration Minister Marc Miller say the federal government is working to stabilize the number of people entering the country every year as housing pressures mount. The federal government ultimately decided to increase the number of permanent residents Canada welcomes each year to 500,000 in 2025 — nearly double the amount from 2015.  

Housing crunch prompts efforts to stabilize immigration levels, say federal ministers

Truck hits roof of Massey Tunnel

Truck hits roof of Massey Tunnel
Mounties in Richmond are investigating after a witness said she saw a truck hit the roof of the Massey Tunnel Wednesday night. Police say the witness told them she was driving behind the truck when it hit and came to a stop inside of the tunnel before continuing through.

Truck hits roof of Massey Tunnel

Canada embarks on preclearance pilot project on U.S. side of Quebec/N.Y. land border

Canada embarks on preclearance pilot project on U.S. side of Quebec/N.Y. land border
The Canada Border Services Agency hopes to launch the two-year project later this year to determine whether similar setups could replace smaller, aging facilities on the Canadian side of the border.  The project carries a price tag of $7.4 million, money that was allocated in the 2021 federal budget. 

Canada embarks on preclearance pilot project on U.S. side of Quebec/N.Y. land border