Friday, April 10, 2026
ADVT 
India

Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Darpan News Desk IANS, 17 Apr, 2025 12:03 PM
  • Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Mumbai, April 17 (IANS) The breakthrough of the 1.65-kilometre underground tunnel on Mumbai Metro Line 7A, from Chhatrapati Shivaji Maharaj International Airport (T2) to Andheri East, was successfully completed on Thursday in the presence of Chief Minister Devendra Fadnavis.

The tunnel is being constructed by the Mumbai Metropolitan Region Development Authority (MMRDA).

The Chief Minister reviewed detailed information about the project from officials and initiated the breakthrough by pressing the button. He later inspected the work on-site. This particular tunnel is located on the downline of Metro Line 7A, between the Chhatrapati Shivaji Maharaj International Airport station and the Airport Colony station.

This metro link is a crucial segment of the Mumbai metropolitan area's expanding metro network. With this line, Mira-Bhayander and further up to Vasai-Virar will be connected to the international airport. Eventually, the Thane and Navi Mumbai International Airports will also be linked via metro. Currently, 59 per cent of the total work on Metro Line 7A has been completed.

According to the MMRDA, Metro Line 7A stretches over 3.4 kilometres, 0.94 km is elevated, and 2.5 km is underground. The line will have two stations: one elevated at Airport Colony and the other underground at the Chhatrapati Shivaji Maharaj International Airport. Out of the total length, 0.57 km is elevated, while the twin tunnels are 2.035 km long.

The first tunnel drive for the downline began on September 1, 2023. The 1.65-km tunnel includes 1,180 pre-cast rings used for lining, each ring specially designed and divided into six parts, with a tunnel diameter of 6.35 meters.

In September 2023, the Tunnel Boring Machine (TBM) was lowered 30 meters underground.

Despite multiple engineering challenges, passing under Metro Line 3, the Sahar Elevated Road, major sewer and water pipelines, the breakthrough was completed successfully. This new line will allow passengers to travel comfortably from Colaba to Vasai-Virar and Mira-Bhayander. It will also provide seamless integration with other metro lines in the city, including Metro Line 3 (Colaba-Bandra-SEEPZ), which connects to the underground airport station.

The blend of elevated and underground alignments ensures minimal land usage in densely populated airport zones, enabling a smoother metro construction process.

MORE India ARTICLES

33 pc quota announced for women in Rajasthan Police Subordinate Services

33 pc quota announced for women in Rajasthan Police Subordinate Services
Rajasthan Cabinet on Wednesday decided to give 33 per cent reservation to women in Rajasthan Police subordinate services. An official said that Rajasthan Police Subordinate Service Rules 1989 has been amended to pave the way for the induction of the reservation.

33 pc quota announced for women in Rajasthan Police Subordinate Services

AAP govt will ensure exemplary punishment of those involved in 2015 sacrileges: Punjab CM

AAP govt will ensure exemplary punishment of those involved in 2015 sacrileges: Punjab CM
Facing criticism from his own AAP legislator for "going slow" on the issue of sacrilege and subsequent police firing in 2015, Punjab Chief Minister Bhagwant Singh Mann on Wednesday informed the Assembly that his government is firmly committed to ensuring exemplary punishment to the perpetrators of the incidents.

AAP govt will ensure exemplary punishment of those involved in 2015 sacrileges: Punjab CM

Landslides kill 6, wash away large portion of NH-29 in Nagaland

Landslides kill 6, wash away large portion of NH-29 in Nagaland
At least six persons, including a woman, were killed as landslides damaged many houses besides washing away a large portion of the vital National Highway-29 in Nagaland’s Chumoukedima district, officials said on Wednesday. Disaster management officials said that six persons were killed when their houses collapsed due to landslides triggered by heavy rain in Pherima village late on Tuesday night

Landslides kill 6, wash away large portion of NH-29 in Nagaland

Cash, drugs worth Rs 5.71 crore seized in J&K since MCC imposition

Cash, drugs worth Rs 5.71 crore seized in J&K since MCC imposition
The police made seizures worth Rs 5.02 crore while NCB recovered items worth Rs 11 lakh, among the articles held back. The statement said that to monitor various election-related activities and also check Model Code of Conduct compliance, a Command and Control Room has been established at the CEO office in Jammu and Srinagar.

Cash, drugs worth Rs 5.71 crore seized in J&K since MCC imposition

Yogi Adityanath hands out appointment letters to 5,000 youths; launches projects worth Rs 705cr

Yogi Adityanath hands out appointment letters to 5,000 youths; launches projects worth Rs 705cr
Uttar Pradesh Chief Minister Yogi Adityanath distributed appointment letters to more than 5,000 youth under the mega employment and loan fair in Aligarh on Wednesday. He also inaugurated and laid the foundation of 305 development projects, worth Rs 705 crore, aimed at the overall development of Aligarh district. Listing out development as the top priority of his government, the Chief Minister said that prior to 2017, the state grappled with an identity crisis that no longer was the case.

Yogi Adityanath hands out appointment letters to 5,000 youths; launches projects worth Rs 705cr

Setback to Akali Dal as veteran Dimpy Dhillon switches to AAP

Setback to Akali Dal as veteran Dimpy Dhillon switches to AAP
The Shiromani Akali Dal (SAD) on Wednesday suffered a setback as veteran leader Hardeep Singh Dimpy Dhillon, considered close to party chief Sukhbir Badal, joined the Aam Aadmi Party (AAP). Dhillon’s move is expected to give a significant boost to the AAP in the upcoming Gidderbaha Assembly by-election.

Setback to Akali Dal as veteran Dimpy Dhillon switches to AAP