Sunday, December 7, 2025
ADVT 
India

Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Darpan News Desk IANS, 17 Apr, 2025 12:03 PM
  • Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Mumbai, April 17 (IANS) The breakthrough of the 1.65-kilometre underground tunnel on Mumbai Metro Line 7A, from Chhatrapati Shivaji Maharaj International Airport (T2) to Andheri East, was successfully completed on Thursday in the presence of Chief Minister Devendra Fadnavis.

The tunnel is being constructed by the Mumbai Metropolitan Region Development Authority (MMRDA).

The Chief Minister reviewed detailed information about the project from officials and initiated the breakthrough by pressing the button. He later inspected the work on-site. This particular tunnel is located on the downline of Metro Line 7A, between the Chhatrapati Shivaji Maharaj International Airport station and the Airport Colony station.

This metro link is a crucial segment of the Mumbai metropolitan area's expanding metro network. With this line, Mira-Bhayander and further up to Vasai-Virar will be connected to the international airport. Eventually, the Thane and Navi Mumbai International Airports will also be linked via metro. Currently, 59 per cent of the total work on Metro Line 7A has been completed.

According to the MMRDA, Metro Line 7A stretches over 3.4 kilometres, 0.94 km is elevated, and 2.5 km is underground. The line will have two stations: one elevated at Airport Colony and the other underground at the Chhatrapati Shivaji Maharaj International Airport. Out of the total length, 0.57 km is elevated, while the twin tunnels are 2.035 km long.

The first tunnel drive for the downline began on September 1, 2023. The 1.65-km tunnel includes 1,180 pre-cast rings used for lining, each ring specially designed and divided into six parts, with a tunnel diameter of 6.35 meters.

In September 2023, the Tunnel Boring Machine (TBM) was lowered 30 meters underground.

Despite multiple engineering challenges, passing under Metro Line 3, the Sahar Elevated Road, major sewer and water pipelines, the breakthrough was completed successfully. This new line will allow passengers to travel comfortably from Colaba to Vasai-Virar and Mira-Bhayander. It will also provide seamless integration with other metro lines in the city, including Metro Line 3 (Colaba-Bandra-SEEPZ), which connects to the underground airport station.

The blend of elevated and underground alignments ensures minimal land usage in densely populated airport zones, enabling a smoother metro construction process.

MORE India ARTICLES

PM Modi reiterates govt's commitment to strengthen Ayush sector during high-level meeting

PM Modi reiterates govt's commitment to strengthen Ayush sector during high-level meeting
Prime Minister Narendra Modi chaired a high-level meeting here at the 7 Lok Kalyan Marg to review the Ayush sector, underscoring its vital role in holistic well-being and healthcare, preserving traditional knowledge, and contributing to the nation’s wellness ecosystem, an official said on Thursday.

PM Modi reiterates govt's commitment to strengthen Ayush sector during high-level meeting

President Murmu to visit Kutch on Feb 28

President Murmu to visit Kutch on Feb 28
President Droupadi Murmu will visit Kutch on February 28. As part of her itinerary, she will visit the Smritivan Museum and Memorial at 3 PM on February 28, followed by a visit to Dhordo. During her stay in Dhordo, the President will engage with local artisans at the Rann Utsav Tent City. To ensure security, the venue has been declared a "No Drone Fly Zone."

President Murmu to visit Kutch on Feb 28

ED conducts searches at multiple locations in money laundering case

ED conducts searches at multiple locations in money laundering case
The ED initiated investigation on the basis of an FIR registered by the Haryana Police clubbed with a complaint received from a victim of the said illegal cryptocurrency investment scam. The ED investigation revealed that multiple cryptocurrency wallets were operated by mastermind Mahesh Kumar in active association with other co-accomplices.

ED conducts searches at multiple locations in money laundering case

Punjabis will never allow Kejriwal to become RS member: Delhi minister

Punjabis will never allow Kejriwal to become RS member: Delhi minister
Delhi’s Food Supply and Industry Minister Manjinder Singh Sirsa on Wednesday said Punjabis will never allow AAP convenor Arvind Kejriwal to become a Rajya Sabha member from Punjab. He urged the people of Ludhiana (West) to ensure the defeat of Sanjiv Arora in the by-election so as to crush the dream of Kejriwal.

Punjabis will never allow Kejriwal to become RS member: Delhi minister

66.21 crore devotees in Maha Kumbh set global record, CM Yogi thanks contributors

66.21 crore devotees in Maha Kumbh set global record, CM Yogi thanks contributors
On the final day of the Maha Kumbh, Uttar Pradesh Chief Minister Yogi Adityanath shared on social media that over 66.21 crore devotees had participated in the sacred bath at the confluence of the Ganga, Yamuna, and Saraswati rivers in Prayagraj during the festival.

66.21 crore devotees in Maha Kumbh set global record, CM Yogi thanks contributors

Punjabi was not removed from list of regional language subjects for Class 10: CBSE

Punjabi was not removed from list of regional language subjects for Class 10: CBSE
Earlier in the day, allegations of removal of Punjabi from Class 10 subjects list by CBSE triggered an uproar in Punjab, prompting parties such as the Aam Aadmi Party (AAP), Congress and the Shiromani Akali Dal (SAD) to condemn the move

Punjabi was not removed from list of regional language subjects for Class 10: CBSE