Tuesday, June 2, 2026
ADVT 
India

Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Darpan News Desk IANS, 17 Apr, 2025 12:03 PM
  • Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Mumbai, April 17 (IANS) The breakthrough of the 1.65-kilometre underground tunnel on Mumbai Metro Line 7A, from Chhatrapati Shivaji Maharaj International Airport (T2) to Andheri East, was successfully completed on Thursday in the presence of Chief Minister Devendra Fadnavis.

The tunnel is being constructed by the Mumbai Metropolitan Region Development Authority (MMRDA).

The Chief Minister reviewed detailed information about the project from officials and initiated the breakthrough by pressing the button. He later inspected the work on-site. This particular tunnel is located on the downline of Metro Line 7A, between the Chhatrapati Shivaji Maharaj International Airport station and the Airport Colony station.

This metro link is a crucial segment of the Mumbai metropolitan area's expanding metro network. With this line, Mira-Bhayander and further up to Vasai-Virar will be connected to the international airport. Eventually, the Thane and Navi Mumbai International Airports will also be linked via metro. Currently, 59 per cent of the total work on Metro Line 7A has been completed.

According to the MMRDA, Metro Line 7A stretches over 3.4 kilometres, 0.94 km is elevated, and 2.5 km is underground. The line will have two stations: one elevated at Airport Colony and the other underground at the Chhatrapati Shivaji Maharaj International Airport. Out of the total length, 0.57 km is elevated, while the twin tunnels are 2.035 km long.

The first tunnel drive for the downline began on September 1, 2023. The 1.65-km tunnel includes 1,180 pre-cast rings used for lining, each ring specially designed and divided into six parts, with a tunnel diameter of 6.35 meters.

In September 2023, the Tunnel Boring Machine (TBM) was lowered 30 meters underground.

Despite multiple engineering challenges, passing under Metro Line 3, the Sahar Elevated Road, major sewer and water pipelines, the breakthrough was completed successfully. This new line will allow passengers to travel comfortably from Colaba to Vasai-Virar and Mira-Bhayander. It will also provide seamless integration with other metro lines in the city, including Metro Line 3 (Colaba-Bandra-SEEPZ), which connects to the underground airport station.

The blend of elevated and underground alignments ensures minimal land usage in densely populated airport zones, enabling a smoother metro construction process.

MORE India ARTICLES

Indian economy transformed from 'fragile five' to 'top five': White Paper

Indian economy transformed from 'fragile five' to 'top five': White Paper
Comparing the performance of the 10-year rule of the Narendra Modi government with that of the erstwhile UPA regime, the White Paper on Indian Economy tabled in the Lok Sabha by Finance Minister Nirmala Sitharaman highlights the fact that in 2014, India was among the 'fragile five' economies, but now figures among the 'top five' economies, making the third highest contribution to global growth every year.  

Indian economy transformed from 'fragile five' to 'top five': White Paper

Probe launched in Chennai after 5 popular schools receive hoax bomb threat

Probe launched in Chennai after 5 popular schools receive hoax bomb threat
The cybercrime wing of the Greater Chennai Police has launched a probe after five popular schools in the city received hoax bomb threat. An anonymous person sent e-mails to five popular schools under the Greater Chennai Police limits on Thursday, claiming that bombs would detonate in their premises.  

Probe launched in Chennai after 5 popular schools receive hoax bomb threat

Centre, protesting farmers arrive on consensus, claims Punjab CM

Centre, protesting farmers arrive on consensus, claims Punjab CM
On the personal intervention of Punjab Chief Minister Bhagwant Mann, the Union government and farmers reached a consensus on Thursday evening over various issues during the first round of deliberations, the state government said. The meeting was held here and was attended by Union Ministers Piyush Goyal, Arjun Munda and Nityanand Rai besides the Chief Minister and representatives of various farmers unions.

Centre, protesting farmers arrive on consensus, claims Punjab CM

Sextortion: Man duped of Rs 6 lakh; accused arrested

Sextortion: Man duped of Rs 6 lakh; accused arrested
A 45-year-old man was arrested for allegedly duping a man of Rs 6 lakh by threatening him to upload his fake nude video on Facebook, YouTube, and Instagram, the police said on Thursday. Based on a complaint, a case was registered under relevant sections of the IPC at the Cyber Crime Police Station.

Sextortion: Man duped of Rs 6 lakh; accused arrested

Three associates of terrorists Landa, Rinda held in Punjab

Three associates of terrorists Landa, Rinda held in Punjab
In a major breakthrough, Punjab Police’s Anti-Gangster Task Force (AGTF) has arrested three associates of terrorists Lakbir Landa and Harwinder Rinda, both based in Canada and Pakistan, respectively, Director General of Police Gaurav Yadav said on Wednesday. The accused have been identified as Jobanjit Singh, Bikramjit Singh and Kulwinder Singh.

Three associates of terrorists Landa, Rinda held in Punjab

Kejriwal's non-compliance with ED summons: Delhi court to pronounce order at 4 pm

Kejriwal's non-compliance with ED summons: Delhi court to pronounce order at 4 pm
A Delhi court on Wednesday said it will pronounce its order at 4 p.m. on ED's complaint against Delhi Chief Minister Arvind Kejriwal for not complying with the financial probe agency's summons sent to him in connection with its probe into the money laundering case related to the now-scrapped excise policy matter. The Enforcement Directorate (ED) submitted that it has concluded the arguments in the matter.

Kejriwal's non-compliance with ED summons: Delhi court to pronounce order at 4 pm