Saturday, June 6, 2026
ADVT 
India

Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Darpan News Desk IANS, 17 Apr, 2025 12:03 PM
  • Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Mumbai, April 17 (IANS) The breakthrough of the 1.65-kilometre underground tunnel on Mumbai Metro Line 7A, from Chhatrapati Shivaji Maharaj International Airport (T2) to Andheri East, was successfully completed on Thursday in the presence of Chief Minister Devendra Fadnavis.

The tunnel is being constructed by the Mumbai Metropolitan Region Development Authority (MMRDA).

The Chief Minister reviewed detailed information about the project from officials and initiated the breakthrough by pressing the button. He later inspected the work on-site. This particular tunnel is located on the downline of Metro Line 7A, between the Chhatrapati Shivaji Maharaj International Airport station and the Airport Colony station.

This metro link is a crucial segment of the Mumbai metropolitan area's expanding metro network. With this line, Mira-Bhayander and further up to Vasai-Virar will be connected to the international airport. Eventually, the Thane and Navi Mumbai International Airports will also be linked via metro. Currently, 59 per cent of the total work on Metro Line 7A has been completed.

According to the MMRDA, Metro Line 7A stretches over 3.4 kilometres, 0.94 km is elevated, and 2.5 km is underground. The line will have two stations: one elevated at Airport Colony and the other underground at the Chhatrapati Shivaji Maharaj International Airport. Out of the total length, 0.57 km is elevated, while the twin tunnels are 2.035 km long.

The first tunnel drive for the downline began on September 1, 2023. The 1.65-km tunnel includes 1,180 pre-cast rings used for lining, each ring specially designed and divided into six parts, with a tunnel diameter of 6.35 meters.

In September 2023, the Tunnel Boring Machine (TBM) was lowered 30 meters underground.

Despite multiple engineering challenges, passing under Metro Line 3, the Sahar Elevated Road, major sewer and water pipelines, the breakthrough was completed successfully. This new line will allow passengers to travel comfortably from Colaba to Vasai-Virar and Mira-Bhayander. It will also provide seamless integration with other metro lines in the city, including Metro Line 3 (Colaba-Bandra-SEEPZ), which connects to the underground airport station.

The blend of elevated and underground alignments ensures minimal land usage in densely populated airport zones, enabling a smoother metro construction process.

MORE India ARTICLES

Assembly digitisation will enhance efficiency of MLAs: Punjab CM

Assembly digitisation will enhance efficiency of MLAs: Punjab CM
Punjab Chief Minister Bhagwant Mann on Thursday said digitisation of the Vidhan Sabha will act as a cornerstone for enhancing the efficiency of the MLAs to raise issues of public concern and for people to judge their performance. The Chief Minister while addressing the assembly after the launch of the National e-Vidhan Application said it is a revolutionary step aimed at making the legislatures more effective and responsive.

Assembly digitisation will enhance efficiency of MLAs: Punjab CM

From Canada to Turkey, Lawrence Bishnoi's networks spread across the world

From Canada to Turkey, Lawrence Bishnoi's networks spread across the world
The incarcerated Lawrence Bishnoi's gang's nexuses operate in northern India, drawing their operations as far as Rajasthan, Haryana, Punjab, and even abroad in countries like Italy, Armenia, Canada, America, Dubai, the Philippines, Pakistan, Azerbaijan, and Turkey. In the age of social media, these gangs flaunt their dominance and attract followers through various social media handles, especially youngsters to join their gang.

From Canada to Turkey, Lawrence Bishnoi's networks spread across the world

Take steps to ensure resolution of dispute with Canada soon: Sukhbir Badal

Take steps to ensure resolution of dispute with Canada soon: Sukhbir Badal
Briefing the Home Minister in his office during a meeting in Parliament, the SAD president informed Shah that he was receiving distress calls from Punjabis in Canada who were worried about safe and smooth travel facilities to their homeland. He said similarly students were apprehensive about their future.

Take steps to ensure resolution of dispute with Canada soon: Sukhbir Badal

India suspends visa services for citizens of Canada, tells it to cut its diplomats

India suspends visa services for citizens of Canada, tells it to cut its diplomats
"Important notice from Indian Mission: Due to operational reasons, with effect from 21 Sept. Indian visa services have been suspended till further notice,” the BLS Indian Visa Application Center in Canada said. It gave no further details. BLS is the agency that processes visa requests for India.

India suspends visa services for citizens of Canada, tells it to cut its diplomats

Jaishankar briefs PM Modi on Canada issue: Sources

Jaishankar briefs PM Modi on Canada issue: Sources
Amid diplomatic standoff between India and Canada over the killing of Khalistani terrorist Hardeep Singh Nijjar, External Affairs Minister S. Jaishankar is learnt to have briefed Prime Minister Narendra Modi on the developments. According to sources, Jaishankar met the Prime Minister in Parliament and is learnt to have briefed him over the developments related to Canada, sources said.

Jaishankar briefs PM Modi on Canada issue: Sources

Tikait warns of agitation if demands are not met

Tikait warns of agitation if demands are not met
Bhartiya Kisan Union (BKU) leader Rakesh Tikait has said that the farmers will be forced to step up their agitation against the government if their demands, including free electricity for irrigation and higher SAP for sugarcane, were not met. Tikait told reporters that the recent agitation of farmers in Lucknow was not driven by any political agenda in view of the Lok Sabha elections due next year.

Tikait warns of agitation if demands are not met