Sunday, June 7, 2026
ADVT 
India

Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Darpan News Desk IANS, 17 Apr, 2025 12:03 PM
  • Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Mumbai, April 17 (IANS) The breakthrough of the 1.65-kilometre underground tunnel on Mumbai Metro Line 7A, from Chhatrapati Shivaji Maharaj International Airport (T2) to Andheri East, was successfully completed on Thursday in the presence of Chief Minister Devendra Fadnavis.

The tunnel is being constructed by the Mumbai Metropolitan Region Development Authority (MMRDA).

The Chief Minister reviewed detailed information about the project from officials and initiated the breakthrough by pressing the button. He later inspected the work on-site. This particular tunnel is located on the downline of Metro Line 7A, between the Chhatrapati Shivaji Maharaj International Airport station and the Airport Colony station.

This metro link is a crucial segment of the Mumbai metropolitan area's expanding metro network. With this line, Mira-Bhayander and further up to Vasai-Virar will be connected to the international airport. Eventually, the Thane and Navi Mumbai International Airports will also be linked via metro. Currently, 59 per cent of the total work on Metro Line 7A has been completed.

According to the MMRDA, Metro Line 7A stretches over 3.4 kilometres, 0.94 km is elevated, and 2.5 km is underground. The line will have two stations: one elevated at Airport Colony and the other underground at the Chhatrapati Shivaji Maharaj International Airport. Out of the total length, 0.57 km is elevated, while the twin tunnels are 2.035 km long.

The first tunnel drive for the downline began on September 1, 2023. The 1.65-km tunnel includes 1,180 pre-cast rings used for lining, each ring specially designed and divided into six parts, with a tunnel diameter of 6.35 meters.

In September 2023, the Tunnel Boring Machine (TBM) was lowered 30 meters underground.

Despite multiple engineering challenges, passing under Metro Line 3, the Sahar Elevated Road, major sewer and water pipelines, the breakthrough was completed successfully. This new line will allow passengers to travel comfortably from Colaba to Vasai-Virar and Mira-Bhayander. It will also provide seamless integration with other metro lines in the city, including Metro Line 3 (Colaba-Bandra-SEEPZ), which connects to the underground airport station.

The blend of elevated and underground alignments ensures minimal land usage in densely populated airport zones, enabling a smoother metro construction process.

MORE India ARTICLES

Delhi govt to provide free sugar to underprivileged families

Delhi govt to provide free sugar to underprivileged families
Delhi Chief Minister Arvind Kejriwal on Monday approved the Delhi Cabinet's proposal of July 20, to provide free sugar to the underprivileged families living in Delhi. This significant move aims to alleviate the hardships faced by underprivileged families and ensure food security for all.  

Delhi govt to provide free sugar to underprivileged families

Farmers clash with police in Noida

Farmers clash with police in Noida
The farmers have been demonstrating at the Noida Authority for the last one month. On Monday, the farmers gathered at the Authority's office located in Sector-6. Later, they marched to the MLA's house in Noida Sector-26 in the afternoon. 

Farmers clash with police in Noida

Unanimously elected panchayats to get Rs 5 lakh: Punjab CM

Unanimously elected panchayats to get Rs 5 lakh: Punjab CM
Stressing on to maintain brotherhood and bonhomie in panchayat elections, the Chief Minister said these elections are critically important for the development of the villages, thereby the state government has announced to extedn the special grant to the villages which will elect sarpanch and panches unanimoulsy. 

Unanimously elected panchayats to get Rs 5 lakh: Punjab CM

SC agrees to early hearing of CBI's pleas seeking cancellation of Lalu's bail

SC agrees to early hearing of CBI's pleas seeking cancellation of Lalu's bail
The Supreme Court has agreed to an early hearing on pleas filed by CBI seeking the cancellation of bail granted to RJD President Lalu Prasad by the Jharkhand High Court in connection with the multi-crore fodder scam. As per the details available on the website of the apex court, the matter is likely to be taken up on next Friday, August 25.

SC agrees to early hearing of CBI's pleas seeking cancellation of Lalu's bail

PM Modi dials Iranian President, discusses greater cooperation over Chabahar Port

PM Modi dials Iranian President, discusses greater cooperation over Chabahar Port
The two leaders reiterated their commitment to further strengthen bilateral cooperation including full potential of Chabahar Port as a connectivity hub. Modi highlighted that India-Iran relationship is underpinned by close historic and civilisational connections, including strong people to people contacts.

PM Modi dials Iranian President, discusses greater cooperation over Chabahar Port

Punjab Police to break supply chain of drugs with BSF

Punjab Police to break supply chain of drugs with BSF
Rs 10 crore are being spent to strengthen the police infrastructure, including police stations, he said, while adding additional police force and vehicles are also being provided to the border police. 

Punjab Police to break supply chain of drugs with BSF