Thursday, June 11, 2026
ADVT 
India

Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Darpan News Desk IANS, 17 Apr, 2025 12:03 PM
  • Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Mumbai, April 17 (IANS) The breakthrough of the 1.65-kilometre underground tunnel on Mumbai Metro Line 7A, from Chhatrapati Shivaji Maharaj International Airport (T2) to Andheri East, was successfully completed on Thursday in the presence of Chief Minister Devendra Fadnavis.

The tunnel is being constructed by the Mumbai Metropolitan Region Development Authority (MMRDA).

The Chief Minister reviewed detailed information about the project from officials and initiated the breakthrough by pressing the button. He later inspected the work on-site. This particular tunnel is located on the downline of Metro Line 7A, between the Chhatrapati Shivaji Maharaj International Airport station and the Airport Colony station.

This metro link is a crucial segment of the Mumbai metropolitan area's expanding metro network. With this line, Mira-Bhayander and further up to Vasai-Virar will be connected to the international airport. Eventually, the Thane and Navi Mumbai International Airports will also be linked via metro. Currently, 59 per cent of the total work on Metro Line 7A has been completed.

According to the MMRDA, Metro Line 7A stretches over 3.4 kilometres, 0.94 km is elevated, and 2.5 km is underground. The line will have two stations: one elevated at Airport Colony and the other underground at the Chhatrapati Shivaji Maharaj International Airport. Out of the total length, 0.57 km is elevated, while the twin tunnels are 2.035 km long.

The first tunnel drive for the downline began on September 1, 2023. The 1.65-km tunnel includes 1,180 pre-cast rings used for lining, each ring specially designed and divided into six parts, with a tunnel diameter of 6.35 meters.

In September 2023, the Tunnel Boring Machine (TBM) was lowered 30 meters underground.

Despite multiple engineering challenges, passing under Metro Line 3, the Sahar Elevated Road, major sewer and water pipelines, the breakthrough was completed successfully. This new line will allow passengers to travel comfortably from Colaba to Vasai-Virar and Mira-Bhayander. It will also provide seamless integration with other metro lines in the city, including Metro Line 3 (Colaba-Bandra-SEEPZ), which connects to the underground airport station.

The blend of elevated and underground alignments ensures minimal land usage in densely populated airport zones, enabling a smoother metro construction process.

MORE India ARTICLES

Two food and civil supplies controllers held in tender scam in Punjab

Two food and civil supplies controllers held in tender scam in Punjab
Besides, the VB has also initiated proceedings in the court against three accused -- R.K. Singla, Deputy Director with the food and civil supplies, and Pankaj Kumar and Inderjit Singh, both personal assistants of former food and civil supplies minister Ashu -- to declare them as proclaimed offenders.

Two food and civil supplies controllers held in tender scam in Punjab

Nearly 15,000 Indian students taking online classes in Ukrainian universities: Centre to SC

Nearly 15,000 Indian students taking online classes in Ukrainian universities: Centre to SC
On November 11, the Supreme Court had asked the Centre to file an affidavit to inform it about the number of medical students who were pursuing their studies in Ukraine who have been accommodated in other countries. On Tuesday, a bench of Justices Surya Kant and Vikram Nath scheduled the petition filed by Archita and others for further hearing on November 29.

Nearly 15,000 Indian students taking online classes in Ukrainian universities: Centre to SC

Akali Dal opposes Haryana's proposal to establish Assembly in Chandigarh

Akali Dal opposes Haryana's proposal to establish Assembly in Chandigarh
Reacting to a submission made to the UT Administrator by the Haryana Assembly Speaker, the Shiromani Akali Dal (SAD) leader in a letter to the Administrator said Chandigarh was an inalienable part of Punjab and the Haryana government could not apply for a land swap without taking the consent of the parent state.

Akali Dal opposes Haryana's proposal to establish Assembly in Chandigarh

Punjab Police arrest sixth shooter in targeted killing case

Punjab Police arrest sixth shooter in targeted killing case
Director General of Police Punjab Gaurav Yadav identified the arrested accused as Ramjan Khan, alias Raj Hooda. He said police teams have also arrested his two accomplices -- Happy Mehla (19) and Sahil Mehla (18), both resident of Hanumangarh in Rajasthan.

Punjab Police arrest sixth shooter in targeted killing case

Drugs worth Rs 50 cr seized in Assam, 5 held

Drugs worth Rs 50 cr seized in Assam, 5 held
In Cachar, three people were arrested with 1.80 lakh tablets used for intoxication on Sunday in the Lakhipur area in the district. Police informed that the international market value of seized tablets is around Rs 50 crore. The accused were identified as Abdul Saeed, Ibazur Rahman and Sameer Alam, all residents of the Cachar district.

Drugs worth Rs 50 cr seized in Assam, 5 held

Shraddha murder case: Aftab to be taken for medical check-up, Narco test likely today

Shraddha murder case: Aftab to be taken for medical check-up, Narco test likely today
Further, police teams have been sent to Tosh in Himachal Pradesh after it was revealed that he, along with his live-in partner, had stayed there for quite a long time. Aftab had strangled his live-in partner Shraddha Walkar on May 18 and then chopped her body into many pieces.

Shraddha murder case: Aftab to be taken for medical check-up, Narco test likely today