Tuesday, December 16, 2025
ADVT 
India

Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Darpan News Desk IANS, 17 Apr, 2025 12:03 PM
  • Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Mumbai, April 17 (IANS) The breakthrough of the 1.65-kilometre underground tunnel on Mumbai Metro Line 7A, from Chhatrapati Shivaji Maharaj International Airport (T2) to Andheri East, was successfully completed on Thursday in the presence of Chief Minister Devendra Fadnavis.

The tunnel is being constructed by the Mumbai Metropolitan Region Development Authority (MMRDA).

The Chief Minister reviewed detailed information about the project from officials and initiated the breakthrough by pressing the button. He later inspected the work on-site. This particular tunnel is located on the downline of Metro Line 7A, between the Chhatrapati Shivaji Maharaj International Airport station and the Airport Colony station.

This metro link is a crucial segment of the Mumbai metropolitan area's expanding metro network. With this line, Mira-Bhayander and further up to Vasai-Virar will be connected to the international airport. Eventually, the Thane and Navi Mumbai International Airports will also be linked via metro. Currently, 59 per cent of the total work on Metro Line 7A has been completed.

According to the MMRDA, Metro Line 7A stretches over 3.4 kilometres, 0.94 km is elevated, and 2.5 km is underground. The line will have two stations: one elevated at Airport Colony and the other underground at the Chhatrapati Shivaji Maharaj International Airport. Out of the total length, 0.57 km is elevated, while the twin tunnels are 2.035 km long.

The first tunnel drive for the downline began on September 1, 2023. The 1.65-km tunnel includes 1,180 pre-cast rings used for lining, each ring specially designed and divided into six parts, with a tunnel diameter of 6.35 meters.

In September 2023, the Tunnel Boring Machine (TBM) was lowered 30 meters underground.

Despite multiple engineering challenges, passing under Metro Line 3, the Sahar Elevated Road, major sewer and water pipelines, the breakthrough was completed successfully. This new line will allow passengers to travel comfortably from Colaba to Vasai-Virar and Mira-Bhayander. It will also provide seamless integration with other metro lines in the city, including Metro Line 3 (Colaba-Bandra-SEEPZ), which connects to the underground airport station.

The blend of elevated and underground alignments ensures minimal land usage in densely populated airport zones, enabling a smoother metro construction process.

MORE India ARTICLES

Punjab: Police officer injured in clash with protesters seeking release of prisoners

Punjab: Police officer injured in clash with protesters seeking release of prisoners
A Chandigarh Police Inspector was injured on Tuesday in a clash with Quami Insaaf Morcha members here after the police fired teargas shells and resorted to cane-charge to prevent them from marching towards Punjab Chief Minister Bhagwant Mann's residence. The Quami Insaaf Morcha has been demanding the release of Sikh prisoners languishing in jails.

Punjab: Police officer injured in clash with protesters seeking release of prisoners

India prepared to respond promptly to any emerging health challenges: J.P. Nadda on HMPV

India prepared to respond promptly to any emerging health challenges: J.P. Nadda on HMPV
Five children tested positive for the virus in Karnataka (2), Gujarat (1), and Tamil Nadu (2). The affected children are recovering well, while one has been discharged, the health authorities said. In a video message, Nadda said that the HMPV virus is not a new virus.

India prepared to respond promptly to any emerging health challenges: J.P. Nadda on HMPV

Protesting farmers have agreed to hold talks with court-appointed panel: Punjab govt tells SC

Protesting farmers have agreed to hold talks with court-appointed panel: Punjab govt tells SC
Senior advocate Kapil Sibal, appearing for the Punjab government, submitted before a bench headed by Justice Surya Kant that the meeting was fixed for 3 p.,m today, where a “breakthrough” is likely to take place.

Protesting farmers have agreed to hold talks with court-appointed panel: Punjab govt tells SC

Will increase opportunities: Pathankot locals count benefits as PM inaugurates Jammu railway division

Will increase opportunities: Pathankot locals count benefits as PM inaugurates Jammu railway division
The inauguration was hailed by PM Modi as a "historic milestone" that would play a significant role in integrating Jammu and Kashmir (J&K) into the national railway network, while fostering infrastructural development across the region.

Will increase opportunities: Pathankot locals count benefits as PM inaugurates Jammu railway division

Prashant Kishor vows to continue hunger strike after being released from jail

Prashant Kishor vows to continue hunger strike after being released from jail
Prashant Kishor, the chief of the Jan Suraj Party, pledged to continue his hunger strike in support of Bihar Public Service Commission (BPSC) candidates after being released from the Beur Central Jail on Monday night. He declared that the movement, initiated in Patna’s historic Gandhi Maidan, would also reach its resolution there, with further plans to be disclosed the following day (Tuesday).

Prashant Kishor vows to continue hunger strike after being released from jail

EAM Jaishankar arrives in Bhubaneswar to attend Pravasi Bharatiya Divas

EAM Jaishankar arrives in Bhubaneswar to attend Pravasi Bharatiya Divas
EAM Jaishankar was welcomed by Chief Minister Mohan Charan Majhi, Deputy CM Pravati Parida, former Union minister and Balasore MP Pratap Chandra Sarangi at the Bhubaneswar airport on Monday evening.

EAM Jaishankar arrives in Bhubaneswar to attend Pravasi Bharatiya Divas