Monday, June 15, 2026
ADVT 
India

Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Darpan News Desk IANS, 17 Apr, 2025 12:03 PM
  • Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Mumbai, April 17 (IANS) The breakthrough of the 1.65-kilometre underground tunnel on Mumbai Metro Line 7A, from Chhatrapati Shivaji Maharaj International Airport (T2) to Andheri East, was successfully completed on Thursday in the presence of Chief Minister Devendra Fadnavis.

The tunnel is being constructed by the Mumbai Metropolitan Region Development Authority (MMRDA).

The Chief Minister reviewed detailed information about the project from officials and initiated the breakthrough by pressing the button. He later inspected the work on-site. This particular tunnel is located on the downline of Metro Line 7A, between the Chhatrapati Shivaji Maharaj International Airport station and the Airport Colony station.

This metro link is a crucial segment of the Mumbai metropolitan area's expanding metro network. With this line, Mira-Bhayander and further up to Vasai-Virar will be connected to the international airport. Eventually, the Thane and Navi Mumbai International Airports will also be linked via metro. Currently, 59 per cent of the total work on Metro Line 7A has been completed.

According to the MMRDA, Metro Line 7A stretches over 3.4 kilometres, 0.94 km is elevated, and 2.5 km is underground. The line will have two stations: one elevated at Airport Colony and the other underground at the Chhatrapati Shivaji Maharaj International Airport. Out of the total length, 0.57 km is elevated, while the twin tunnels are 2.035 km long.

The first tunnel drive for the downline began on September 1, 2023. The 1.65-km tunnel includes 1,180 pre-cast rings used for lining, each ring specially designed and divided into six parts, with a tunnel diameter of 6.35 meters.

In September 2023, the Tunnel Boring Machine (TBM) was lowered 30 meters underground.

Despite multiple engineering challenges, passing under Metro Line 3, the Sahar Elevated Road, major sewer and water pipelines, the breakthrough was completed successfully. This new line will allow passengers to travel comfortably from Colaba to Vasai-Virar and Mira-Bhayander. It will also provide seamless integration with other metro lines in the city, including Metro Line 3 (Colaba-Bandra-SEEPZ), which connects to the underground airport station.

The blend of elevated and underground alignments ensures minimal land usage in densely populated airport zones, enabling a smoother metro construction process.

MORE India ARTICLES

Allahabad HC denies bail to 34 cops accused of killing 10 Sikhs in 1991

Allahabad HC denies bail to 34 cops accused of killing 10 Sikhs in 1991
The bench of Justices Ramesh Sinha and Brij Raj Singh observed that the accused cops had indulged in a barbaric and inhuman killing of innocent persons by calling them terrorists.

Allahabad HC denies bail to 34 cops accused of killing 10 Sikhs in 1991

Yasin Malik won't be given any work in Tihar, will be alone in his cell

Yasin Malik won't be given any work in Tihar, will be alone in his cell
During the previous hearing, Malik told the Court that he was not contesting the charges levelled against him. He may not even challenge the sentencing in higher courts as he has himself pleaded guilty which means by all means, Malik will spend the rest of his life in Jail.

Yasin Malik won't be given any work in Tihar, will be alone in his cell

AAP trying to enforce Delhi's 'failed' education model: Akali Dal

AAP trying to enforce Delhi's 'failed' education model: Akali Dal
Cheema said school children from Punjab had fared better than their counterparts in Delhi when compared class wise right from class three, class five, class eight and class 10. He said Punjab students has stood first as far as comprehending mathematics was concerned, second in case of social sciences and third in case of English.

AAP trying to enforce Delhi's 'failed' education model: Akali Dal

Punjab CM launches portal for direct seeding of rice

Punjab CM launches portal for direct seeding of rice
Lauding this farmer-friendly initiative, Mann said it would be instrumental to compile the entire data about each and every farmer, who has opted for DSR technique besides ensuring payment of Rs 1,500 per acre after proper verification through this portal to the genuine beneficiaries in a fair and transparent manner.

Punjab CM launches portal for direct seeding of rice

Yasin Malik sentenced to life imprisonment

Yasin Malik sentenced to life imprisonment
In the arguments before the sentencing, Malik told the court that he will accept hanging if the intelligence agencies prove any terror-related activities involving him.

Yasin Malik sentenced to life imprisonment

Delhi CM flags off 150 electric buses, announces 3-day free ride

Delhi CM flags off 150 electric buses, announces 3-day free ride
Kejriwal along with Transport Minister Kailash Gahlot also took a ride on board an electric bus from the Indraprastha Depot to Rajghat after flagging off the fleet.

Delhi CM flags off 150 electric buses, announces 3-day free ride