Tuesday, June 16, 2026
ADVT 
India

Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Darpan News Desk IANS, 17 Apr, 2025 12:03 PM
  • Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Mumbai, April 17 (IANS) The breakthrough of the 1.65-kilometre underground tunnel on Mumbai Metro Line 7A, from Chhatrapati Shivaji Maharaj International Airport (T2) to Andheri East, was successfully completed on Thursday in the presence of Chief Minister Devendra Fadnavis.

The tunnel is being constructed by the Mumbai Metropolitan Region Development Authority (MMRDA).

The Chief Minister reviewed detailed information about the project from officials and initiated the breakthrough by pressing the button. He later inspected the work on-site. This particular tunnel is located on the downline of Metro Line 7A, between the Chhatrapati Shivaji Maharaj International Airport station and the Airport Colony station.

This metro link is a crucial segment of the Mumbai metropolitan area's expanding metro network. With this line, Mira-Bhayander and further up to Vasai-Virar will be connected to the international airport. Eventually, the Thane and Navi Mumbai International Airports will also be linked via metro. Currently, 59 per cent of the total work on Metro Line 7A has been completed.

According to the MMRDA, Metro Line 7A stretches over 3.4 kilometres, 0.94 km is elevated, and 2.5 km is underground. The line will have two stations: one elevated at Airport Colony and the other underground at the Chhatrapati Shivaji Maharaj International Airport. Out of the total length, 0.57 km is elevated, while the twin tunnels are 2.035 km long.

The first tunnel drive for the downline began on September 1, 2023. The 1.65-km tunnel includes 1,180 pre-cast rings used for lining, each ring specially designed and divided into six parts, with a tunnel diameter of 6.35 meters.

In September 2023, the Tunnel Boring Machine (TBM) was lowered 30 meters underground.

Despite multiple engineering challenges, passing under Metro Line 3, the Sahar Elevated Road, major sewer and water pipelines, the breakthrough was completed successfully. This new line will allow passengers to travel comfortably from Colaba to Vasai-Virar and Mira-Bhayander. It will also provide seamless integration with other metro lines in the city, including Metro Line 3 (Colaba-Bandra-SEEPZ), which connects to the underground airport station.

The blend of elevated and underground alignments ensures minimal land usage in densely populated airport zones, enabling a smoother metro construction process.

MORE India ARTICLES

Court finds jailed underworld don guilty in BJP leader's murder case

Court finds jailed underworld don guilty in BJP leader's murder case
Rajendra Shetty a.k.a Bannanje Raja is involved in 44 serious criminal offences including murder, extortion and kidnapping. Authorities had issued an Interpol red corner notice against Bannanje Raja, and he was nabbed in Casablanca in Morocco. Later, he was extradited to Karnataka from there.

Court finds jailed underworld don guilty in BJP leader's murder case

NIA conducts searches in Khanna in Ludhiana bomb blast case

NIA conducts searches in Khanna in Ludhiana bomb blast case
The case pertains to a blast that occurred in District Court Complex, Ludhiana on December 23, 2021 in which one person died and six persons were injured. Initially, a case was lodged by Lidhiana Police in 2021 and later the probe was taken over by the NIA in 2022.

NIA conducts searches in Khanna in Ludhiana bomb blast case

'The Kashmir files' row: 70 detained for creating ruckus outside Delhi CM's house

'The Kashmir files' row: 70 detained for creating ruckus outside Delhi CM's house
The protest, which was led by BJP Yuva Morcha's national secretary Tajinder Pal Singh Bagga and its national president Tejasvi Surya, started around 10.30 a.m. from the IP College to the Chief Minister's residence.

'The Kashmir files' row: 70 detained for creating ruckus outside Delhi CM's house

AAP urges govt not to override rights of Punjab govt in Chandigarh admin

AAP urges govt not to override rights of Punjab govt in Chandigarh admin
Union Home Minister Amit Shah on March 27 had announced that Central Civil Service Rules will be implemented for all employees under Chandigarh Administration. This decision has evoked sharp criticism from Punjab leaders who, cutting across party lines, termed it "an encroachment on Punjab's rights".

AAP urges govt not to override rights of Punjab govt in Chandigarh admin

Thief drinks alcohol, dozes off and lands in jail

Thief drinks alcohol, dozes off and lands in jail
When the house owner woke up to see a stranger sleeping in the couch, he called the police and the drunk thief landed in the lock up on Wednesday.

Thief drinks alcohol, dozes off and lands in jail

Punjab revenue employees call off strike

Punjab revenue employees call off strike
At a meeting with the Punjab Revenue Officers Association here, the minister assured representatives of the association that all their demands will be considered sympathetically, while asking them to immediately join their offices in larger public interest.

Punjab revenue employees call off strike