Thursday, June 18, 2026
ADVT 
India

Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Darpan News Desk IANS, 17 Apr, 2025 12:03 PM
  • Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Mumbai, April 17 (IANS) The breakthrough of the 1.65-kilometre underground tunnel on Mumbai Metro Line 7A, from Chhatrapati Shivaji Maharaj International Airport (T2) to Andheri East, was successfully completed on Thursday in the presence of Chief Minister Devendra Fadnavis.

The tunnel is being constructed by the Mumbai Metropolitan Region Development Authority (MMRDA).

The Chief Minister reviewed detailed information about the project from officials and initiated the breakthrough by pressing the button. He later inspected the work on-site. This particular tunnel is located on the downline of Metro Line 7A, between the Chhatrapati Shivaji Maharaj International Airport station and the Airport Colony station.

This metro link is a crucial segment of the Mumbai metropolitan area's expanding metro network. With this line, Mira-Bhayander and further up to Vasai-Virar will be connected to the international airport. Eventually, the Thane and Navi Mumbai International Airports will also be linked via metro. Currently, 59 per cent of the total work on Metro Line 7A has been completed.

According to the MMRDA, Metro Line 7A stretches over 3.4 kilometres, 0.94 km is elevated, and 2.5 km is underground. The line will have two stations: one elevated at Airport Colony and the other underground at the Chhatrapati Shivaji Maharaj International Airport. Out of the total length, 0.57 km is elevated, while the twin tunnels are 2.035 km long.

The first tunnel drive for the downline began on September 1, 2023. The 1.65-km tunnel includes 1,180 pre-cast rings used for lining, each ring specially designed and divided into six parts, with a tunnel diameter of 6.35 meters.

In September 2023, the Tunnel Boring Machine (TBM) was lowered 30 meters underground.

Despite multiple engineering challenges, passing under Metro Line 3, the Sahar Elevated Road, major sewer and water pipelines, the breakthrough was completed successfully. This new line will allow passengers to travel comfortably from Colaba to Vasai-Virar and Mira-Bhayander. It will also provide seamless integration with other metro lines in the city, including Metro Line 3 (Colaba-Bandra-SEEPZ), which connects to the underground airport station.

The blend of elevated and underground alignments ensures minimal land usage in densely populated airport zones, enabling a smoother metro construction process.

MORE India ARTICLES

'Farmers have right to protest but none can take law into hands'

'Farmers have right to protest but none can take law into hands'
Notably, Prime Minister Narendra Modi had recently announced the repeal of three controversial farm laws after a year of protests. Thousands of farmers are still camping at Delhi's borders and several died from heat, cold and Covid.

'Farmers have right to protest but none can take law into hands'

Will bring lakh farmers to Delhi in support of reforms: SC panel member

Will bring lakh farmers to Delhi in support of reforms: SC panel member
Member of the Supreme Court appointed committee on farm laws, Anil Ghanwat, on Tuesday wrote to the apex court to release their committee's report and also said he will mobilise a lakh farmers, who support farm reforms, to Delhi.

Will bring lakh farmers to Delhi in support of reforms: SC panel member

Punjab to have bio-fuel projects to prevent stubble burning

Punjab to have bio-fuel projects to prevent stubble burning
Invest Punjab has signed a memorandum of understanding with the Punjab State Office-Renewable Gas Association of India for setting up bio-fuel projects and compressed bio-gas plants (Bio-CNG) that will help in reducing the greenhouse gas emissions generated by stubble burning.

Punjab to have bio-fuel projects to prevent stubble burning

Plight of Punjab schools, teachers a misfortune: Kejriwal

Plight of Punjab schools, teachers a misfortune: Kejriwal
Kejriwal gave eight guarantees to teachers for comprehensive education reforms in Punjab and promised that these guarantees would be implemented on priority if the AAP government is formed in 2022.

Plight of Punjab schools, teachers a misfortune: Kejriwal

Punjab CM had connived with Badals: Amarinder

Punjab CM had connived with Badals: Amarinder
Former Punjab Chief Minister Amarinder Singh on Tuesday ridiculed present Chief Minister Charanjit Singh Channi for his frequent accusations that he had "connived with the Badals" and harmed Punjab's interests.

Punjab CM had connived with Badals: Amarinder

Bill to ban all cryptocurrencies to be tabled in Winter Session of Parliament

Bill to ban all cryptocurrencies to be tabled in Winter Session of Parliament
The Bill has been listed for introduction, consideration and passing in the Lok Sabha. It is among 26 new Bills, which are to be introduced in the Parliament session beginning November 29.

Bill to ban all cryptocurrencies to be tabled in Winter Session of Parliament