Saturday, June 20, 2026
ADVT 
India

Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Darpan News Desk IANS, 17 Apr, 2025 12:03 PM
  • Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Mumbai, April 17 (IANS) The breakthrough of the 1.65-kilometre underground tunnel on Mumbai Metro Line 7A, from Chhatrapati Shivaji Maharaj International Airport (T2) to Andheri East, was successfully completed on Thursday in the presence of Chief Minister Devendra Fadnavis.

The tunnel is being constructed by the Mumbai Metropolitan Region Development Authority (MMRDA).

The Chief Minister reviewed detailed information about the project from officials and initiated the breakthrough by pressing the button. He later inspected the work on-site. This particular tunnel is located on the downline of Metro Line 7A, between the Chhatrapati Shivaji Maharaj International Airport station and the Airport Colony station.

This metro link is a crucial segment of the Mumbai metropolitan area's expanding metro network. With this line, Mira-Bhayander and further up to Vasai-Virar will be connected to the international airport. Eventually, the Thane and Navi Mumbai International Airports will also be linked via metro. Currently, 59 per cent of the total work on Metro Line 7A has been completed.

According to the MMRDA, Metro Line 7A stretches over 3.4 kilometres, 0.94 km is elevated, and 2.5 km is underground. The line will have two stations: one elevated at Airport Colony and the other underground at the Chhatrapati Shivaji Maharaj International Airport. Out of the total length, 0.57 km is elevated, while the twin tunnels are 2.035 km long.

The first tunnel drive for the downline began on September 1, 2023. The 1.65-km tunnel includes 1,180 pre-cast rings used for lining, each ring specially designed and divided into six parts, with a tunnel diameter of 6.35 meters.

In September 2023, the Tunnel Boring Machine (TBM) was lowered 30 meters underground.

Despite multiple engineering challenges, passing under Metro Line 3, the Sahar Elevated Road, major sewer and water pipelines, the breakthrough was completed successfully. This new line will allow passengers to travel comfortably from Colaba to Vasai-Virar and Mira-Bhayander. It will also provide seamless integration with other metro lines in the city, including Metro Line 3 (Colaba-Bandra-SEEPZ), which connects to the underground airport station.

The blend of elevated and underground alignments ensures minimal land usage in densely populated airport zones, enabling a smoother metro construction process.

MORE India ARTICLES

Goa accounts for 12% of drug manufacturing in India: CM

Goa accounts for 12% of drug manufacturing in India: CM
"Pharmaceutical industry in Goa produces 12 per cent of the total medicine manufactured in India. Around 70 per cent of the product is exported to the most developed countries in the world," Sawant told a government function in Panaji organised to promote industrial trade in the state.

Goa accounts for 12% of drug manufacturing in India: CM

Don't use the word Dalit to identify someone: Punjab SC panel

Don't use the word Dalit to identify someone: Punjab SC panel
Even the Union Ministry of Social Justice and Empowerment has directed all state governments and Union Territory administrations to use the word Scheduled Caste instead of Dalit for persons belonging to SCs.

Don't use the word Dalit to identify someone: Punjab SC panel

India to reciprocate if UK fails to recognize Covishield

India to reciprocate if UK fails to recognize Covishield
The non-recognition of the Covishield vaccine has impacted the Indians, especially students travelling to the UK. This issue was flagged during the meeting between Indian External Affairs Minister Dr Jaishankar and UK Foreign Secretary Liz Truss on Monday in Washington DC.

India to reciprocate if UK fails to recognize Covishield

After settling tussle in Punjab, Sonia heads to Shimla

After settling tussle in Punjab, Sonia heads to Shimla
She reached Chandigarh, the joint capital of Punjab and Haryana, by air in the morning from where she headed straight to her daughter Priyanka Gandhi Vadra's cottage located amid forests of pine and cedar on the suburbs of the Himachal Pradesh capital.

After settling tussle in Punjab, Sonia heads to Shimla

PM Modi greets new Punjab Chief Minister Channi

PM Modi greets new Punjab Chief Minister Channi
Channi took oath of office along with his two deputies -- one a Jat Sikh and another belonging to the Hindu community -- at a simple ceremony here in the Punjab capital that was delayed for 20 minutes owing to the late arrival of party leader Rahul Gandhi.

PM Modi greets new Punjab Chief Minister Channi

Sikh leader underlines need to intensify farmers agitation

Sikh leader underlines need to intensify farmers agitation
Jasbir Singh Virk, president of Bhartiya Sikh Sangthan, has underlined the need to intensify the ongoing farmers' agitation and said that there was a need to shore up strength at the Delhi borders.

Sikh leader underlines need to intensify farmers agitation