Saturday, June 20, 2026
ADVT 
India

Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Darpan News Desk IANS, 17 Apr, 2025 12:03 PM
  • Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Mumbai, April 17 (IANS) The breakthrough of the 1.65-kilometre underground tunnel on Mumbai Metro Line 7A, from Chhatrapati Shivaji Maharaj International Airport (T2) to Andheri East, was successfully completed on Thursday in the presence of Chief Minister Devendra Fadnavis.

The tunnel is being constructed by the Mumbai Metropolitan Region Development Authority (MMRDA).

The Chief Minister reviewed detailed information about the project from officials and initiated the breakthrough by pressing the button. He later inspected the work on-site. This particular tunnel is located on the downline of Metro Line 7A, between the Chhatrapati Shivaji Maharaj International Airport station and the Airport Colony station.

This metro link is a crucial segment of the Mumbai metropolitan area's expanding metro network. With this line, Mira-Bhayander and further up to Vasai-Virar will be connected to the international airport. Eventually, the Thane and Navi Mumbai International Airports will also be linked via metro. Currently, 59 per cent of the total work on Metro Line 7A has been completed.

According to the MMRDA, Metro Line 7A stretches over 3.4 kilometres, 0.94 km is elevated, and 2.5 km is underground. The line will have two stations: one elevated at Airport Colony and the other underground at the Chhatrapati Shivaji Maharaj International Airport. Out of the total length, 0.57 km is elevated, while the twin tunnels are 2.035 km long.

The first tunnel drive for the downline began on September 1, 2023. The 1.65-km tunnel includes 1,180 pre-cast rings used for lining, each ring specially designed and divided into six parts, with a tunnel diameter of 6.35 meters.

In September 2023, the Tunnel Boring Machine (TBM) was lowered 30 meters underground.

Despite multiple engineering challenges, passing under Metro Line 3, the Sahar Elevated Road, major sewer and water pipelines, the breakthrough was completed successfully. This new line will allow passengers to travel comfortably from Colaba to Vasai-Virar and Mira-Bhayander. It will also provide seamless integration with other metro lines in the city, including Metro Line 3 (Colaba-Bandra-SEEPZ), which connects to the underground airport station.

The blend of elevated and underground alignments ensures minimal land usage in densely populated airport zones, enabling a smoother metro construction process.

MORE India ARTICLES

Railways cancels 68 trains in view of farmers agitation in Punjab

Railways cancels 68 trains in view of farmers agitation in Punjab
A Northern Railway spokesperson said that due to farmers agitation in Ferozpur division of Punjab, it has cancelled 68 train including two Vande Bharat and Rajdhani each, four Shatabdi Express, one Duranto, and two Janshatabdi Express trains.

Railways cancels 68 trains in view of farmers agitation in Punjab

Robbers loot jewellery shop in Mysuru, shoot passerby dead

Robbers loot jewellery shop in Mysuru, shoot passerby dead
According to police, the robbers, coming out of the Amruth Gold and Silver shop after the crime, saw Chandru approach and opened fire at him, fearing he may try to apprehend them or alert the public. One of the bullets hit Chandru on the head and he died on the spot.

Robbers loot jewellery shop in Mysuru, shoot passerby dead

Release ex-Punjab DGP Saini: High Court

Release ex-Punjab DGP Saini: High Court
The Vigilance Bureau arrested Saini, who retired in June 2018, for cheating, forgery and other offences under provisions of the Prevention of Corruption Act on Wednesday.

Release ex-Punjab DGP Saini: High Court

Punjab CM meets Sidhu, sets up panel for coordination ahead of polls

Punjab CM meets Sidhu, sets up panel for coordination ahead of polls
To be headed by the Chief Minister, the group will have Local Government Minister Brahm Mohindra, Finance Minister Manpreet Singh Badal and Social Security Minister Aruna Chaudhary as members, along with Sidhu, the four party working presidents -- Kuljit Singh Nagra, Sukhwinder Singh Danny, Sangat Singh Gilzian and Pawan Goel, besides Pargat Singh.

Punjab CM meets Sidhu, sets up panel for coordination ahead of polls

Rajiv Gandhi 77th birth anniversary: Modi, Sonia pay tributes

Rajiv Gandhi 77th birth anniversary: Modi, Sonia pay tributes
After paying floral tributes to the former Prime Minister at Central Hall of Parliament, Defence Minister Singh tweeted, "Paid tributes to former Prime Minister of India, Rajiv Gandhi ji on his birth anniversary at Parliament House today."

Rajiv Gandhi 77th birth anniversary: Modi, Sonia pay tributes

Three US giants to invest in UP

Three US giants to invest in UP
Microsoft and MAQ Software will set up their units in Noida whereas PepsiCo has started construction of its factory in Mathura, said an Industrial Department official.

Three US giants to invest in UP