Friday, April 3, 2026
ADVT 
India

Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Darpan News Desk IANS, 17 Apr, 2025 12:03 PM
  • Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Mumbai, April 17 (IANS) The breakthrough of the 1.65-kilometre underground tunnel on Mumbai Metro Line 7A, from Chhatrapati Shivaji Maharaj International Airport (T2) to Andheri East, was successfully completed on Thursday in the presence of Chief Minister Devendra Fadnavis.

The tunnel is being constructed by the Mumbai Metropolitan Region Development Authority (MMRDA).

The Chief Minister reviewed detailed information about the project from officials and initiated the breakthrough by pressing the button. He later inspected the work on-site. This particular tunnel is located on the downline of Metro Line 7A, between the Chhatrapati Shivaji Maharaj International Airport station and the Airport Colony station.

This metro link is a crucial segment of the Mumbai metropolitan area's expanding metro network. With this line, Mira-Bhayander and further up to Vasai-Virar will be connected to the international airport. Eventually, the Thane and Navi Mumbai International Airports will also be linked via metro. Currently, 59 per cent of the total work on Metro Line 7A has been completed.

According to the MMRDA, Metro Line 7A stretches over 3.4 kilometres, 0.94 km is elevated, and 2.5 km is underground. The line will have two stations: one elevated at Airport Colony and the other underground at the Chhatrapati Shivaji Maharaj International Airport. Out of the total length, 0.57 km is elevated, while the twin tunnels are 2.035 km long.

The first tunnel drive for the downline began on September 1, 2023. The 1.65-km tunnel includes 1,180 pre-cast rings used for lining, each ring specially designed and divided into six parts, with a tunnel diameter of 6.35 meters.

In September 2023, the Tunnel Boring Machine (TBM) was lowered 30 meters underground.

Despite multiple engineering challenges, passing under Metro Line 3, the Sahar Elevated Road, major sewer and water pipelines, the breakthrough was completed successfully. This new line will allow passengers to travel comfortably from Colaba to Vasai-Virar and Mira-Bhayander. It will also provide seamless integration with other metro lines in the city, including Metro Line 3 (Colaba-Bandra-SEEPZ), which connects to the underground airport station.

The blend of elevated and underground alignments ensures minimal land usage in densely populated airport zones, enabling a smoother metro construction process.

MORE India ARTICLES

Air pollution: Gurugram admin issues work from home advisory

Air pollution: Gurugram admin issues work from home advisory
In view of worsening air quality in Gurugram, the District Administration on Tuesday issued an advisory urging private institutions and corporate offices to adopt work-from-home measures. The move aims to curb air pollution and improve air quality in compliance with guidelines from the Commission for Air Quality Management (CAQM).

Air pollution: Gurugram admin issues work from home advisory

Jharkhand polls: All eyes on these high-profile leaders & hot contests in final phase of elections

Jharkhand polls: All eyes on these high-profile leaders & hot contests in final phase of elections
As Jharkhand gears up for the second and final phase of assembly elections on Wednesday, all eyes are on 10 out of 38 constituencies where prominent leaders, including Chief Minister Hemant Soren and BJP State President Babulal Marandi, are in the fray. Barhait in Sahibganj District is one hot seat from where Chief Minister Hemant Soren (JMM) seeks a third consecutive term. He faces Gamliyel Hembrom, a former AJSU member now with the BJP.

Jharkhand polls: All eyes on these high-profile leaders & hot contests in final phase of elections

Punjab records increase of 1.4 quintals in average paddy yield per hectare: Minister

Punjab records increase of 1.4 quintals in average paddy yield per hectare: Minister
A total of 2174 CCEs to be conducted, the results of 1,863 CCEs have reported yield stands at 6,878 kg per hectare, up from 6,740 kg per hectare during the kharif season of last year. This figure includes both non-Basmati and Basmati varieties of paddy.

Punjab records increase of 1.4 quintals in average paddy yield per hectare: Minister

PM Modi visits Guyana to grow economic & cultural ties

PM Modi visits Guyana to grow economic & cultural ties
Prime Minister Narendra Modi starts a two-day visit on Tuesday to Guyana, the energy-rich nation with strong historic cultural links with India through a large diaspora. He will co-chair the India-CARICOM summit with 14 nations participating, underscoring India’s role as the voice of the Global South that supports the political and economic aspirations of those countries.

PM Modi visits Guyana to grow economic & cultural ties

Punjab farmer unions to march towards Delhi on Dec 6, seeking MSP as legal law

Punjab farmer unions to march towards Delhi on Dec 6, seeking MSP as legal law
The announcement to start the march towards the national capital came after two attempts to reach Delhi by farmer groups on February 13 and February 21 were stopped by police.

Punjab farmer unions to march towards Delhi on Dec 6, seeking MSP as legal law

Bihar: Seven police personnel arrested in liquor case

Bihar: Seven police personnel arrested in liquor case
The arrested officers, who were part of the Anti-Liquor Task Force (ALTF), are now facing legal proceedings, as a case has been registered against them. The arrests were made after a joint raid led by Mahua SDPO Saurabh Suman and Mahua police, acting on SP Rai's instructions.

Bihar: Seven police personnel arrested in liquor case