Thursday, April 9, 2026
ADVT 
India

Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Darpan News Desk IANS, 17 Apr, 2025 12:03 PM
  • Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Mumbai, April 17 (IANS) The breakthrough of the 1.65-kilometre underground tunnel on Mumbai Metro Line 7A, from Chhatrapati Shivaji Maharaj International Airport (T2) to Andheri East, was successfully completed on Thursday in the presence of Chief Minister Devendra Fadnavis.

The tunnel is being constructed by the Mumbai Metropolitan Region Development Authority (MMRDA).

The Chief Minister reviewed detailed information about the project from officials and initiated the breakthrough by pressing the button. He later inspected the work on-site. This particular tunnel is located on the downline of Metro Line 7A, between the Chhatrapati Shivaji Maharaj International Airport station and the Airport Colony station.

This metro link is a crucial segment of the Mumbai metropolitan area's expanding metro network. With this line, Mira-Bhayander and further up to Vasai-Virar will be connected to the international airport. Eventually, the Thane and Navi Mumbai International Airports will also be linked via metro. Currently, 59 per cent of the total work on Metro Line 7A has been completed.

According to the MMRDA, Metro Line 7A stretches over 3.4 kilometres, 0.94 km is elevated, and 2.5 km is underground. The line will have two stations: one elevated at Airport Colony and the other underground at the Chhatrapati Shivaji Maharaj International Airport. Out of the total length, 0.57 km is elevated, while the twin tunnels are 2.035 km long.

The first tunnel drive for the downline began on September 1, 2023. The 1.65-km tunnel includes 1,180 pre-cast rings used for lining, each ring specially designed and divided into six parts, with a tunnel diameter of 6.35 meters.

In September 2023, the Tunnel Boring Machine (TBM) was lowered 30 meters underground.

Despite multiple engineering challenges, passing under Metro Line 3, the Sahar Elevated Road, major sewer and water pipelines, the breakthrough was completed successfully. This new line will allow passengers to travel comfortably from Colaba to Vasai-Virar and Mira-Bhayander. It will also provide seamless integration with other metro lines in the city, including Metro Line 3 (Colaba-Bandra-SEEPZ), which connects to the underground airport station.

The blend of elevated and underground alignments ensures minimal land usage in densely populated airport zones, enabling a smoother metro construction process.

MORE India ARTICLES

Adani Group vehemently denies fake press releases related to its presence in Kenya

Adani Group vehemently denies fake press releases related to its presence in Kenya
A spokesperson from the Group said in a statement that certain “vested interests with malicious intent” are circulating multiple fraudulent press releases, including one titled “Adani Group Denounces Baseless Accusations and Threats”, related to the company’s presence in Kenya.

Adani Group vehemently denies fake press releases related to its presence in Kenya

PM Modi inaugurates, lays foundation for key projects worth Rs 8,000 cr in Gujarat IANS

PM Modi inaugurates, lays foundation for key projects worth Rs 8,000 cr in Gujarat IANS
The PM is on a two-day visit to the State. The projects include the quadrupling of the Samakhiali-Gandhidham and Gandhidham-Adipur railway lines, the development of iconic roads within the Ahmedabad Municipal Corporation (AMC) area, and the construction of flyovers at major junctions including Bakrol, Hathijan, Ramol, and Panjarpol.

PM Modi inaugurates, lays foundation for key projects worth Rs 8,000 cr in Gujarat IANS

RG Kar protests: Will withdraw agitation only after Bengal CM's promises are fulfilled, claim junior doctors' group

RG Kar protests: Will withdraw agitation only after Bengal CM's promises are fulfilled, claim junior doctors' group
Chief Minister Banerjee announced that the Kolkata Police Commissioner Vineet Kumar Goyal, the Deputy Commissioner (North Division) of Kolkata Police Abhishek Gupta, besides the state director of health services and director of medical education, will be replaced honouring the demand of the protesting junior doctors.

RG Kar protests: Will withdraw agitation only after Bengal CM's promises are fulfilled, claim junior doctors' group

PM Modi to speak at UN Summit of the Future on Sep 23, but not at annual high-level meeting

PM Modi to speak at UN Summit of the Future on Sep 23, but not at annual high-level meeting
Earlier, PM Modi was listed earlier as a speaker at the September 26 session of the Assembly high-level meeting, but it would appear he will not remain all through the high-level meeting that follows the Summit of the Future and runs from September 24 to 30.

PM Modi to speak at UN Summit of the Future on Sep 23, but not at annual high-level meeting

CBI to probe multi-crore online trading scam: Assam CM

CBI to probe multi-crore online trading scam: Assam CM
Assam Chief Minister Himanta Biswa Sarma on Friday announced that the CBI would be investigating cases pertaining to the multi-crore online trading scam. The process of handing over cases to the CBI will take almost a month, according to the Chief Minister.

CBI to probe multi-crore online trading scam: Assam CM

SC issues notice on plea seeking directions to raise awareness of anti-rape laws

SC issues notice on plea seeking directions to raise awareness of  anti-rape laws
The Supreme Court on Friday issued notice on a plea seeking directions to raise awareness of the stringent provisions providing punishment for sexual offences, particularly rape, to prevent the commission of such heinous offences. A bench, headed by CJI D.Y. Chandrachud, sought the response of the Centre, the Ministry of Education, the Ministry of Information and Broadcasting, and the Central Bureau Of Film Certification (CBFC) in the matter.

SC issues notice on plea seeking directions to raise awareness of anti-rape laws