Tuesday, December 23, 2025
ADVT 
India

Mumbai Monorail, India's First Monorail Network, Now Fully Operational

Darpan News Desk IANS, 04 Mar, 2019 08:52 PM

    Maharashtra Chief Minister Devendra Fadnavis Sunday flagged off the much-delayed 11.28 kilometre second phase of the Chembur-Wadala-Jacob Circle monorail network.

     

    With this, the entire 19.54 kilometre route of the country's first monorail system, being implemented by the Mumbai Metropolitan Region Development Authority (MMRDA), is now functional.

     

    The 8.26 kilometre first phase, built and operated by a consortium of Larsen & Toubro and Malaysian firm Scomi Engineering, was commissioned in February 2014.

     

    Speaking at the event, Mr Fadnavis said the country's first ever monorail had faced many hurdles and delays in the past but was now finally seeing the light of day.

     
     

    "The first 8 km route which got commissioned in 2014 was used as a mere joyride because there was no last mile connectivity. But now, with the commissioning of the second phase, it will no longer remain a joyride but passengers can now use it for a hassle-free commute," he said.

     

    The Chief Minister said the monorail's annual ridership will now increase from the current 4.5 lakh to 30 lakh.

     

    "In the process of urbanisation, the most important element that needs to be addressed is mobility. It is necessary to develop an efficient and sustainable public transport system. In Mumbai we have a strong suburban railway system, and with the projects like monorail and metro network, we will be able to develop sustainable mobility," he said.

     
     

    The chief minister further said there was a need to integrate transport systems including railways, monorail, metro, BEST and the proposed waterways.

     

    Maharashtra Chief Minister Devendra Fadnavis Sunday flagged off the much-delayed 11.28 kilometre second phase of the Chembur-Wadala-Jacob Circle monorail network.

     

    With this, the entire 19.54 kilometre route of the country's first monorail system, being implemented by the Mumbai Metropolitan Region Development Authority (MMRDA), is now functional.

     

    The 8.26 kilometre first phase, built and operated by a consortium of Larsen & Toubro and Malaysian firm Scomi Engineering, was commissioned in February 2014.

     

    Speaking at the event, Mr Fadnavis said the country's first ever monorail had faced many hurdles and delays in the past but was now finally seeing the light of day.

     
     

    "The first 8 km route which got commissioned in 2014 was used as a mere joyride because there was no last mile connectivity. But now, with the commissioning of the second phase, it will no longer remain a joyride but passengers can now use it for a hassle-free commute," he said.

     

    The Chief Minister said the monorail's annual ridership will now increase from the current 4.5 lakh to 30 lakh.

     

    "In the process of urbanisation, the most important element that needs to be addressed is mobility. It is necessary to develop an efficient and sustainable public transport system. In Mumbai we have a strong suburban railway system, and with the projects like monorail and metro network, we will be able to develop sustainable mobility," he said.

     

    The chief minister further said there was a need to integrate transport systems including railways, monorail, metro, BEST and the proposed waterways.

     

    Further, a fire in an empty monorail coach in November, 2017 had led to the network being shut till August last year.

     

    Since taking over the monorail's operations, MMRDA has said it has reduced daily losses from Rs. 1.8 crore to Rs. 1 crore.

     

    It plans to operate 120 services with a fleet of seven 4-coach trains between 6 am and 10 pm daily.

     

    The fare for the entire 17-station route, which has been built at a cost of Rs. 3000 crore, has been fixed at Rs. 10, Rs. 20, Rs. 30 and Rs. 40.

    MORE India ARTICLES

    Punjab Assembly Passes Resolution Urging Centre For Women's Reservation

    Punjab Assembly Passes Resolution Urging Centre For Women's Reservation
    Punjab Chief Minister Amarinder Singh moved a resolution during the Winter Session of the Assembly here.

    Punjab Assembly Passes Resolution Urging Centre For Women's Reservation

    Woman, Mother Assaulted By 'Women Bouncers' In Delhi

    A 27-year-old woman was allegedly assaulted by "over 20 women bouncers" and her mother in-law in the national capital, police said on Friday.

    Woman, Mother Assaulted By 'Women Bouncers' In Delhi

    Delta Man Taranjot Singh Grewal Charged For Allegedly Stealing A Parcel From The Doorstep

    He is charged with three counts of theft of mail, from three addresses on 116th Street, 118th Street and Carver Crescent.

    Delta Man Taranjot Singh Grewal Charged For Allegedly Stealing A Parcel From The Doorstep

    60,000 Doses Of Meth, 227 Kilos Of Cocaine-Cutting Agent Seized In Surrey: RCMP

    Surrey RCMP is pleased to share with the public that a significant drug seizure was made in the Newton area of Surrey.

    60,000 Doses Of Meth, 227 Kilos Of Cocaine-Cutting Agent Seized In Surrey: RCMP

    It's Unfair To Call Vijay Mallya Thief For One Loan Default: Nitin Gadkari

    It's Unfair To Call Vijay Mallya Thief For One Loan Default: Nitin Gadkari
    Nitin Gadkari, however, clarified that he has no business dealing with Vijay Mallya, who faces extradition from the UK for alleged bank fraud and money laundering amounting to an estimated Rs. 9,000 crore.  

    It's Unfair To Call Vijay Mallya Thief For One Loan Default: Nitin Gadkari

    Patience And Time: Rahul Gandhi Tweets Quote By Leo Tolstoy

    Patience And Time: Rahul Gandhi Tweets Quote By Leo Tolstoy
    Jyotiraditya Scindia also tweeted the same picture in the eveningsaying there is no race for chief minister in Madhya Pradesh  

    Patience And Time: Rahul Gandhi Tweets Quote By Leo Tolstoy