Thursday, January 1, 2026
ADVT 
India

Mumbai Monorail, India's First Monorail Network, Now Fully Operational

Darpan News Desk IANS, 04 Mar, 2019 08:52 PM

    Maharashtra Chief Minister Devendra Fadnavis Sunday flagged off the much-delayed 11.28 kilometre second phase of the Chembur-Wadala-Jacob Circle monorail network.

     

    With this, the entire 19.54 kilometre route of the country's first monorail system, being implemented by the Mumbai Metropolitan Region Development Authority (MMRDA), is now functional.

     

    The 8.26 kilometre first phase, built and operated by a consortium of Larsen & Toubro and Malaysian firm Scomi Engineering, was commissioned in February 2014.

     

    Speaking at the event, Mr Fadnavis said the country's first ever monorail had faced many hurdles and delays in the past but was now finally seeing the light of day.

     
     

    "The first 8 km route which got commissioned in 2014 was used as a mere joyride because there was no last mile connectivity. But now, with the commissioning of the second phase, it will no longer remain a joyride but passengers can now use it for a hassle-free commute," he said.

     

    The Chief Minister said the monorail's annual ridership will now increase from the current 4.5 lakh to 30 lakh.

     

    "In the process of urbanisation, the most important element that needs to be addressed is mobility. It is necessary to develop an efficient and sustainable public transport system. In Mumbai we have a strong suburban railway system, and with the projects like monorail and metro network, we will be able to develop sustainable mobility," he said.

     
     

    The chief minister further said there was a need to integrate transport systems including railways, monorail, metro, BEST and the proposed waterways.

     

    Maharashtra Chief Minister Devendra Fadnavis Sunday flagged off the much-delayed 11.28 kilometre second phase of the Chembur-Wadala-Jacob Circle monorail network.

     

    With this, the entire 19.54 kilometre route of the country's first monorail system, being implemented by the Mumbai Metropolitan Region Development Authority (MMRDA), is now functional.

     

    The 8.26 kilometre first phase, built and operated by a consortium of Larsen & Toubro and Malaysian firm Scomi Engineering, was commissioned in February 2014.

     

    Speaking at the event, Mr Fadnavis said the country's first ever monorail had faced many hurdles and delays in the past but was now finally seeing the light of day.

     
     

    "The first 8 km route which got commissioned in 2014 was used as a mere joyride because there was no last mile connectivity. But now, with the commissioning of the second phase, it will no longer remain a joyride but passengers can now use it for a hassle-free commute," he said.

     

    The Chief Minister said the monorail's annual ridership will now increase from the current 4.5 lakh to 30 lakh.

     

    "In the process of urbanisation, the most important element that needs to be addressed is mobility. It is necessary to develop an efficient and sustainable public transport system. In Mumbai we have a strong suburban railway system, and with the projects like monorail and metro network, we will be able to develop sustainable mobility," he said.

     

    The chief minister further said there was a need to integrate transport systems including railways, monorail, metro, BEST and the proposed waterways.

     

    Further, a fire in an empty monorail coach in November, 2017 had led to the network being shut till August last year.

     

    Since taking over the monorail's operations, MMRDA has said it has reduced daily losses from Rs. 1.8 crore to Rs. 1 crore.

     

    It plans to operate 120 services with a fleet of seven 4-coach trains between 6 am and 10 pm daily.

     

    The fare for the entire 17-station route, which has been built at a cost of Rs. 3000 crore, has been fixed at Rs. 10, Rs. 20, Rs. 30 and Rs. 40.

    MORE India ARTICLES

    It Is High Time 1984 Anti-Sikh Riot Cases Are Decided At Earliest: SC

    It Is High Time 1984 Anti-Sikh Riot Cases Are Decided At Earliest: SC
    As 1984 anti-Sikh riot cases in Delhi continue to hang fire even after 34 years, the Supreme Court on Wednesday said it was high time that these cases were decided.

    It Is High Time 1984 Anti-Sikh Riot Cases Are Decided At Earliest: SC

    Pune School Issues Diktat On Girl Students' Innerwear Colour

    Pune School Issues Diktat On Girl Students' Innerwear Colour
    Parents and student of Pune's Maeer's MIT School on Wednesday staged a protest against the school's diktat asking the girls student to wear specific colour innerwear.

    Pune School Issues Diktat On Girl Students' Innerwear Colour

    5 Foreigners Among 15 Held From Spa Centre In Gurugram For Sex Trade

    5 Foreigners Among 15 Held From Spa Centre In Gurugram For Sex Trade
    The city police on Thursday arrested 15 people, including five foreigners, from a spa centre at Sector 29 market here for their alleged involvement in sex trade.

    5 Foreigners Among 15 Held From Spa Centre In Gurugram For Sex Trade

    Anti-Sikh Riots: Top Court Seeks Sajjan Kumar's Response On Plea Against Bail

    Sajjan Kumar was granted anticipatory bail by the trial court on December 21, 2016 in two cases of killing of three Sikhs during the riots.

    Anti-Sikh Riots: Top Court Seeks Sajjan Kumar's Response On Plea Against Bail

    Inter-Faith Couple Row: Lucknow Passport Office Okays Tanvi Seth and Anas Siddiqui's Passport

    Inter-Faith Couple Row: Lucknow Passport Office Okays Tanvi Seth and Anas Siddiqui's Passport
    Days after a row erupted over issuance of passport to an interfaith couple in Lucknow, sources insist that Ministry of External Affairs followed due protocol in the case.

    Inter-Faith Couple Row: Lucknow Passport Office Okays Tanvi Seth and Anas Siddiqui's Passport

    CM Amarinder Singh Orders Mandatory Dope Test For All Punjab Government Employees

    Taking its war on drugs forward, Punjab Chief Minister Capt Amarinder Singh on Wednesday ordered a mandatory dope test on all government employees, including police personnel, from the time of their recruitment through every stage of their service.

    CM Amarinder Singh Orders Mandatory Dope Test For All Punjab Government Employees