Friday, December 19, 2025
ADVT 
India

Mumbai Monorail, India's First Monorail Network, Now Fully Operational

Darpan News Desk IANS, 04 Mar, 2019 08:52 PM

    Maharashtra Chief Minister Devendra Fadnavis Sunday flagged off the much-delayed 11.28 kilometre second phase of the Chembur-Wadala-Jacob Circle monorail network.

     

    With this, the entire 19.54 kilometre route of the country's first monorail system, being implemented by the Mumbai Metropolitan Region Development Authority (MMRDA), is now functional.

     

    The 8.26 kilometre first phase, built and operated by a consortium of Larsen & Toubro and Malaysian firm Scomi Engineering, was commissioned in February 2014.

     

    Speaking at the event, Mr Fadnavis said the country's first ever monorail had faced many hurdles and delays in the past but was now finally seeing the light of day.

     
     

    "The first 8 km route which got commissioned in 2014 was used as a mere joyride because there was no last mile connectivity. But now, with the commissioning of the second phase, it will no longer remain a joyride but passengers can now use it for a hassle-free commute," he said.

     

    The Chief Minister said the monorail's annual ridership will now increase from the current 4.5 lakh to 30 lakh.

     

    "In the process of urbanisation, the most important element that needs to be addressed is mobility. It is necessary to develop an efficient and sustainable public transport system. In Mumbai we have a strong suburban railway system, and with the projects like monorail and metro network, we will be able to develop sustainable mobility," he said.

     
     

    The chief minister further said there was a need to integrate transport systems including railways, monorail, metro, BEST and the proposed waterways.

     

    Maharashtra Chief Minister Devendra Fadnavis Sunday flagged off the much-delayed 11.28 kilometre second phase of the Chembur-Wadala-Jacob Circle monorail network.

     

    With this, the entire 19.54 kilometre route of the country's first monorail system, being implemented by the Mumbai Metropolitan Region Development Authority (MMRDA), is now functional.

     

    The 8.26 kilometre first phase, built and operated by a consortium of Larsen & Toubro and Malaysian firm Scomi Engineering, was commissioned in February 2014.

     

    Speaking at the event, Mr Fadnavis said the country's first ever monorail had faced many hurdles and delays in the past but was now finally seeing the light of day.

     
     

    "The first 8 km route which got commissioned in 2014 was used as a mere joyride because there was no last mile connectivity. But now, with the commissioning of the second phase, it will no longer remain a joyride but passengers can now use it for a hassle-free commute," he said.

     

    The Chief Minister said the monorail's annual ridership will now increase from the current 4.5 lakh to 30 lakh.

     

    "In the process of urbanisation, the most important element that needs to be addressed is mobility. It is necessary to develop an efficient and sustainable public transport system. In Mumbai we have a strong suburban railway system, and with the projects like monorail and metro network, we will be able to develop sustainable mobility," he said.

     

    The chief minister further said there was a need to integrate transport systems including railways, monorail, metro, BEST and the proposed waterways.

     

    Further, a fire in an empty monorail coach in November, 2017 had led to the network being shut till August last year.

     

    Since taking over the monorail's operations, MMRDA has said it has reduced daily losses from Rs. 1.8 crore to Rs. 1 crore.

     

    It plans to operate 120 services with a fleet of seven 4-coach trains between 6 am and 10 pm daily.

     

    The fare for the entire 17-station route, which has been built at a cost of Rs. 3000 crore, has been fixed at Rs. 10, Rs. 20, Rs. 30 and Rs. 40.

    MORE India ARTICLES

    Walmart, Amazon Seek Extension Of Jan 31 Deadline On E-Commerce Compliance, Panic As Government Silent

    Walmart, Amazon Seek Extension Of Jan 31 Deadline On E-Commerce Compliance, Panic As Government Silent
    There is trouble in paradise. The government's drastic intervention in e-commerce at the behest of vested domestic interests and the powerful traders

    Walmart, Amazon Seek Extension Of Jan 31 Deadline On E-Commerce Compliance, Panic As Government Silent

    Priyanka Vadra: A Potent Campaigner Who Can Make A Difference To The Congress

    Priyanka Vadra: A Potent Campaigner Who Can Make A Difference To The Congress
    Shortly after the Congress party announced that Priyanka Vadra would be the new general secretary of the Grand Old Party holding charge of eastern Uttar Pradesh, it put out a photograph of Indira Gandhi playing with a young Priyanka.

    Priyanka Vadra: A Potent Campaigner Who Can Make A Difference To The Congress

    Pakistan Captain Sarfraz Ahmed Apologises For His Racial Comments

    The Pakistan Cricket Board has expressed regret over the alleged racist remarks made by national team captain Sarfraz Ahmed against South African pacer Andile Phehlukwayo during the second ODI in Durban.

    Pakistan Captain Sarfraz Ahmed Apologises For His Racial Comments

    Guiding Light: Lance Naik Nazir Ahmad Wani, A Former Militant Now An Ashoka Chakra Awardee

    Nearly one-and-half months after Lance Naik Nazir Ahmad Wani's death in an anti-terror operation in Shopian, Mahajabeen, a teacher and mother of two, says his immense love for her and fearless persona are a source of motivation for her to encourage youngsters to become good citizens.

    Guiding Light: Lance Naik Nazir Ahmad Wani, A Former Militant Now An Ashoka Chakra Awardee

    Apology After Sikh Issued Challan For Not Wearing Helmet In Peshawar

    A traffic warden had on Tuesday issued the challan to the Sikh youth riding the motorcycle for not using the helmet.

    Apology After Sikh Issued Challan For Not Wearing Helmet In Peshawar

    Indian Rocket Lifts Off With DRDO's 'Microsat R' And 'Kalamsat'

    Indian Rocket Lifts Off With DRDO's 'Microsat R' And 'Kalamsat'
    About 14 minutes into the flight, the rocket would eject Microsat R at an altitude of about 277 km.

    Indian Rocket Lifts Off With DRDO's 'Microsat R' And 'Kalamsat'