Saturday, December 20, 2025
ADVT 
India

Mumbai Monorail, India's First Monorail Network, Now Fully Operational

Darpan News Desk IANS, 04 Mar, 2019 08:52 PM

    Maharashtra Chief Minister Devendra Fadnavis Sunday flagged off the much-delayed 11.28 kilometre second phase of the Chembur-Wadala-Jacob Circle monorail network.

     

    With this, the entire 19.54 kilometre route of the country's first monorail system, being implemented by the Mumbai Metropolitan Region Development Authority (MMRDA), is now functional.

     

    The 8.26 kilometre first phase, built and operated by a consortium of Larsen & Toubro and Malaysian firm Scomi Engineering, was commissioned in February 2014.

     

    Speaking at the event, Mr Fadnavis said the country's first ever monorail had faced many hurdles and delays in the past but was now finally seeing the light of day.

     
     

    "The first 8 km route which got commissioned in 2014 was used as a mere joyride because there was no last mile connectivity. But now, with the commissioning of the second phase, it will no longer remain a joyride but passengers can now use it for a hassle-free commute," he said.

     

    The Chief Minister said the monorail's annual ridership will now increase from the current 4.5 lakh to 30 lakh.

     

    "In the process of urbanisation, the most important element that needs to be addressed is mobility. It is necessary to develop an efficient and sustainable public transport system. In Mumbai we have a strong suburban railway system, and with the projects like monorail and metro network, we will be able to develop sustainable mobility," he said.

     
     

    The chief minister further said there was a need to integrate transport systems including railways, monorail, metro, BEST and the proposed waterways.

     

    Maharashtra Chief Minister Devendra Fadnavis Sunday flagged off the much-delayed 11.28 kilometre second phase of the Chembur-Wadala-Jacob Circle monorail network.

     

    With this, the entire 19.54 kilometre route of the country's first monorail system, being implemented by the Mumbai Metropolitan Region Development Authority (MMRDA), is now functional.

     

    The 8.26 kilometre first phase, built and operated by a consortium of Larsen & Toubro and Malaysian firm Scomi Engineering, was commissioned in February 2014.

     

    Speaking at the event, Mr Fadnavis said the country's first ever monorail had faced many hurdles and delays in the past but was now finally seeing the light of day.

     
     

    "The first 8 km route which got commissioned in 2014 was used as a mere joyride because there was no last mile connectivity. But now, with the commissioning of the second phase, it will no longer remain a joyride but passengers can now use it for a hassle-free commute," he said.

     

    The Chief Minister said the monorail's annual ridership will now increase from the current 4.5 lakh to 30 lakh.

     

    "In the process of urbanisation, the most important element that needs to be addressed is mobility. It is necessary to develop an efficient and sustainable public transport system. In Mumbai we have a strong suburban railway system, and with the projects like monorail and metro network, we will be able to develop sustainable mobility," he said.

     

    The chief minister further said there was a need to integrate transport systems including railways, monorail, metro, BEST and the proposed waterways.

     

    Further, a fire in an empty monorail coach in November, 2017 had led to the network being shut till August last year.

     

    Since taking over the monorail's operations, MMRDA has said it has reduced daily losses from Rs. 1.8 crore to Rs. 1 crore.

     

    It plans to operate 120 services with a fleet of seven 4-coach trains between 6 am and 10 pm daily.

     

    The fare for the entire 17-station route, which has been built at a cost of Rs. 3000 crore, has been fixed at Rs. 10, Rs. 20, Rs. 30 and Rs. 40.

    MORE India ARTICLES

    Katarpur Corridor: BJP Scuttling Sikhs’ Dreams, Says Captain Amarinder Singh

    Katarpur Corridor: BJP Scuttling Sikhs’ Dreams, Says Captain Amarinder Singh
    Punjab Chief Minister Captain Amarinder Singh on Thursday accused Union Minister Vijay Sampla of putting “unnecessary” roadblocks in the Kartarpur Sahib pilgrimage. 

    Katarpur Corridor: BJP Scuttling Sikhs’ Dreams, Says Captain Amarinder Singh

    After Quitting AAP, Jaitu MLA Baldev Singh Now Joins Sukhpal Khaira’s Party

    Jaitu Member of Legislative Assembly Baldev Singh joined Punjabi Ekta Party on Thursday, a day after he quit the Aam Aadmi Party (AAP) over national convener Arvind Kejriwal “dictatorial tendencies”. 

    After Quitting AAP, Jaitu MLA Baldev Singh Now Joins Sukhpal Khaira’s Party

    Days Of Khichdi Politics Over, India Needs Another 10 Years Of Modi: Hardeep Singh Puri

    Asserting that the days of "khichdi politics" are over, Union Minister Hardeep Singh Puri, says that the proposed mahagathbandhan is an "alliance of opportunists".

    Days Of Khichdi Politics Over, India Needs Another 10 Years Of Modi: Hardeep Singh Puri

    Dera Chief Gurmeet Ram Rahim Singh, 3 Others Awarded Life Imprisonment In Chhatrapati Murder Case

    Dera Chief Gurmeet Ram Rahim Singh, 3 Others Awarded Life Imprisonment In Chhatrapati Murder Case
    The sect chief is also linked to the murder of former Dera manager Ranjit Singh (in July 2002). The matter is being heard by the CBI court.

    Dera Chief Gurmeet Ram Rahim Singh, 3 Others Awarded Life Imprisonment In Chhatrapati Murder Case

    Over 3 Lakh Drug Addicts Treated In Punjab In 2018: Police

    Over 3 Lakh Drug Addicts Treated In Punjab In 2018: Police
    Over three lakh drug addicts were treated in Punjab in 2018 and more than 63,000 people are currently being treated, out of which 25,000 are heroin addicts, a top police official said on Tuesday.

    Over 3 Lakh Drug Addicts Treated In Punjab In 2018: Police

    Punjab's New Challenge: Getting Hooked Off De-Addiction Drug

    Punjab's New Challenge: Getting Hooked Off De-Addiction Drug
    Six crore tablets of buprenorphine (combined with naloxone) were consumed in the state in 2017. A report by Punjab’s Food and Drug Administration (FDA) indicates that the medicine has emerged as an addiction.

    Punjab's New Challenge: Getting Hooked Off De-Addiction Drug