Sunday, June 14, 2026
ADVT 
International

New Building Code, El Nino Put Off Plans For US Gurdwara

Darpan News Desk The Canadian Press, 19 Nov, 2015 12:09 PM
    The groundbreaking ceremony of a new gurdwara in the US was delayed after a building code modification and concerns over changes in the weather, a media report said.
     
    Sikhs in California's Sutter county will have to wait longer for a gurdwara in South George Washington Boulevard as the authorities have modified the building codes in the county and they fear a possibility of a strong El Nino effect this winter, Appeal-Democrat.com news website reported on Wednesday.
     
    "Concerns over the possibility of a strong El Nino effect this winter and changes in Sutter county building codes since the temple plans were approved in 2010 could delay work until spring," Sukhcharan Singh, a spokesperson for the Guru Nanak Sikh Society, said.
     
    The Guru Nanak Sikh Society is looking after legal and construction issues of the gurdwara.
     
    "Starting a project this time of year, especially with El Nino, could lead to delays which might cost more money," Singh said, adding, "We are talking with contractors about how they will adjust and handle it. If it doesn't cost us any extra money it can happen sooner."
     
    El Nino is the prolonged warming in the Pacific Ocean sea surface temperatures when compared with the average value. This anomaly happens at irregular intervals of two to seven years, and lasts nine months to two years.
     
     
    Due to strong El Nino effect, California witnesses heavy rains in winters.
     
    Initially, the county blocked the gurdwara project because the land for the project was zoned for agriculture. The organisation won a court case in 2006 that allowed the project to continue.
     
    "The plans for the gurdwara were submitted and approved in 2010, but the society needed to raise more funds before work could begin, and problems with contractors going out of business delayed the process," Singh said.
     
    "In the meantime, the county's building code was updated and the temple plans must be brought in line with the changes." 
     
    "The grading process on the build site can begin before the plans are re-approved by the county, but the society could wait until after the rainy season to avoid weather-related work stoppages," Singh added.

    MORE International ARTICLES

    OSCE monitors come under fire at MH17 crash site

    OSCE monitors come under fire at MH17 crash site
    Monitors from the Organisation for Security and Cooperation in Europe (OSCE) came under artillery fire at the MH17 crash site in eastern Ukraine Sep...

    OSCE monitors come under fire at MH17 crash site

    Punjab To Upload Property Details Of Officers

    Punjab To Upload Property Details Of Officers
    Property details of all civil and police officers in Punjab will be put up on the official websites of their respective departments.

    Punjab To Upload Property Details Of Officers

    Indian-origin Girl Killed In Australia Road Crash

    Indian-origin Girl Killed In Australia Road Crash
    An Indian-origin schoolgirl was killed in a tragic car accident in Australia Monday. Aneri Patel, 16, from Kogarah High School, was believed to be waiting at the bus stop when she was hit by a Mitsubishi Challenger, a mid-size SUV, around 11.30 a.m. 

    Indian-origin Girl Killed In Australia Road Crash

    Sikh Free School Opens Its Doors In Britain

    Sikh Free School Opens Its Doors In Britain
    After facing a lot of disappointment in Britain's Coventry schools, members of the Indian-origin Sikh community have set up their own school for their new generation.

    Sikh Free School Opens Its Doors In Britain

    Kerry arrives in Paris for IS talks

    Kerry arrives in Paris for IS talks
    US Secretary of State John Kerry Sunday arrived in Paris after a four-day tour of the Middle East trying to build a coalition to defeat the Islamic State (IS)...

    Kerry arrives in Paris for IS talks

    29 missing as ship capsizes in Philippines

    29 missing as ship capsizes in Philippines
    At least 29 people were missing after a roll-on and roll-off vessel with 84 people on board capsized off central Philippine province of Leyte Saturday night...

    29 missing as ship capsizes in Philippines