Tuesday, June 16, 2026
ADVT 
International

New Building Code, El Nino Put Off Plans For US Gurdwara

Darpan News Desk The Canadian Press, 19 Nov, 2015 12:09 PM
    The groundbreaking ceremony of a new gurdwara in the US was delayed after a building code modification and concerns over changes in the weather, a media report said.
     
    Sikhs in California's Sutter county will have to wait longer for a gurdwara in South George Washington Boulevard as the authorities have modified the building codes in the county and they fear a possibility of a strong El Nino effect this winter, Appeal-Democrat.com news website reported on Wednesday.
     
    "Concerns over the possibility of a strong El Nino effect this winter and changes in Sutter county building codes since the temple plans were approved in 2010 could delay work until spring," Sukhcharan Singh, a spokesperson for the Guru Nanak Sikh Society, said.
     
    The Guru Nanak Sikh Society is looking after legal and construction issues of the gurdwara.
     
    "Starting a project this time of year, especially with El Nino, could lead to delays which might cost more money," Singh said, adding, "We are talking with contractors about how they will adjust and handle it. If it doesn't cost us any extra money it can happen sooner."
     
    El Nino is the prolonged warming in the Pacific Ocean sea surface temperatures when compared with the average value. This anomaly happens at irregular intervals of two to seven years, and lasts nine months to two years.
     
     
    Due to strong El Nino effect, California witnesses heavy rains in winters.
     
    Initially, the county blocked the gurdwara project because the land for the project was zoned for agriculture. The organisation won a court case in 2006 that allowed the project to continue.
     
    "The plans for the gurdwara were submitted and approved in 2010, but the society needed to raise more funds before work could begin, and problems with contractors going out of business delayed the process," Singh said.
     
    "In the meantime, the county's building code was updated and the temple plans must be brought in line with the changes." 
     
    "The grading process on the build site can begin before the plans are re-approved by the county, but the society could wait until after the rainy season to avoid weather-related work stoppages," Singh added.

    MORE International ARTICLES

    Rush to join class action lawsuit against Facebook

    Rush to join class action lawsuit against Facebook
    Over 11,500 people have joined the class action lawsuit filed by an Austrian law student against Facebook over the company's privacy policies....

    Rush to join class action lawsuit against Facebook

    Modi's Nepal visit: Unfurling vision of an integrated South Asia

    Modi's Nepal visit: Unfurling vision of an integrated South Asia
    Flying in to Kathmandu, Prime Minister Narendra Modi said he wanted to forge a "new relationship" with Nepal that could serve as a model for regional partnership...

    Modi's Nepal visit: Unfurling vision of an integrated South Asia

    72-hour humanitarian truce begins in Gaza

    72-hour humanitarian truce begins in Gaza
    A 72-hour humanitarian truce brokered by Egypt between Israel and Palestine went into effect Tuesday in the Gaza Strip....

    72-hour humanitarian truce begins in Gaza

    Egypt to dig new canal alongside Suez Canal

    Egypt to dig new canal alongside Suez Canal
    The Egyptian government Tuesday launched a project to dig a new 72-km canal alongside the original Suez Canal...

    Egypt to dig new canal alongside Suez Canal

    India, Nepal to review 1950 pact, secure border

    India, Nepal to review 1950 pact, secure border
    India and Nepal Monday agreed to "review, adjust and update" a 1950 bilateral friendship pact and not to let "unscrupulous elements"...

    India, Nepal to review 1950 pact, secure border

    NASA creates space engine like none other

    NASA creates space engine like none other
    In what could be a game changer in space exploration, NASA has successfully tested a "microwave thruster system" that requires no propellant to generate thrust....

    NASA creates space engine like none other