Tuesday, June 16, 2026
ADVT 
International

New Building Code, El Nino Put Off Plans For US Gurdwara

Darpan News Desk The Canadian Press, 19 Nov, 2015 12:09 PM
    The groundbreaking ceremony of a new gurdwara in the US was delayed after a building code modification and concerns over changes in the weather, a media report said.
     
    Sikhs in California's Sutter county will have to wait longer for a gurdwara in South George Washington Boulevard as the authorities have modified the building codes in the county and they fear a possibility of a strong El Nino effect this winter, Appeal-Democrat.com news website reported on Wednesday.
     
    "Concerns over the possibility of a strong El Nino effect this winter and changes in Sutter county building codes since the temple plans were approved in 2010 could delay work until spring," Sukhcharan Singh, a spokesperson for the Guru Nanak Sikh Society, said.
     
    The Guru Nanak Sikh Society is looking after legal and construction issues of the gurdwara.
     
    "Starting a project this time of year, especially with El Nino, could lead to delays which might cost more money," Singh said, adding, "We are talking with contractors about how they will adjust and handle it. If it doesn't cost us any extra money it can happen sooner."
     
    El Nino is the prolonged warming in the Pacific Ocean sea surface temperatures when compared with the average value. This anomaly happens at irregular intervals of two to seven years, and lasts nine months to two years.
     
     
    Due to strong El Nino effect, California witnesses heavy rains in winters.
     
    Initially, the county blocked the gurdwara project because the land for the project was zoned for agriculture. The organisation won a court case in 2006 that allowed the project to continue.
     
    "The plans for the gurdwara were submitted and approved in 2010, but the society needed to raise more funds before work could begin, and problems with contractors going out of business delayed the process," Singh said.
     
    "In the meantime, the county's building code was updated and the temple plans must be brought in line with the changes." 
     
    "The grading process on the build site can begin before the plans are re-approved by the county, but the society could wait until after the rainy season to avoid weather-related work stoppages," Singh added.

    MORE International ARTICLES

    EU to impose more restrictive measures against Russia

    EU to impose more restrictive measures against Russia
    The European Union (EU) has agreed a package of "significant" additional restrictive measures targeting sectoral cooperation and exchanges with Russia...

    EU to impose more restrictive measures against Russia

    Obama writes to Putin over missile treaty violation

    Obama writes to Putin over missile treaty violation
    US President Barack Obama has written to his Russian counterpart Vladimir Putin over Moscow's breach of a 1987 missile treaty, the White House said Tuesday....

    Obama writes to Putin over missile treaty violation

    Drinking water shortage to hit world by 2040

    Drinking water shortage to hit world by 2040
    If we continue doing what we are doing today to meet our energy demands, there will not be enough water in the world to quench the thirst of the world population by 2040...

    Drinking water shortage to hit world by 2040

    Young US troops facing more sexual problems?

    Young US troops facing more sexual problems?
    According to an alarming study, young troops in the US suffer from erectile dysfunction (ED) at nearly three times the rate of civilians their own age...

    Young US troops facing more sexual problems?

    US keen to support Modi government's vision: Kerry

    US keen to support Modi government's vision: Kerry
    Stressing that the US and India have the potential to become indispensable partners in the 21st century, Secretary of State John Kerry said Washington wants...

    US keen to support Modi government's vision: Kerry

    MH17 investigators fail to reach crash site

    MH17 investigators fail to reach crash site
    Australian and Dutch investigators have failed for a third consecutive day to reach the MH17 crash site because of fierce fighting between...

    MH17 investigators fail to reach crash site