Saturday, December 20, 2025
ADVT 
National

7 Injured In Structure Collapse Of Framework At Muskrat Falls

Darpan News Desk The Canadian Press, 30 May, 2016 11:52 AM
    MUSKRAT FALLS, N.L. — Seven workers were injured in the collapse of a structure used in the pouring of concrete at a building at the Muskrat Falls hydroelectric project in Labrador, the contractor said Monday.
     
    Matthew Pike, spokesman for Astaldi Canada, said in an email that the framework supporting concrete that was being poured collapsed at about midnight. He said the accident occurred in the draft tube No. 2 area of the powerhouse during the night shift.
     
    "Seven employees received first aid treatment at the site, with one employee sent to the Labrador Health Centre in Happy Valley-Goose Bay for a further assessment," he said. "None of the injuries at this time are classified as serious."
     
    He offered no reason for the cause of the collapse, which spilled wet concrete on the workers.
     
    Pike said work in the draft tube area of the powerhouse has been suspended while an investigation is underway by the company, Nalcor Energy and Occupational Health and Safety officials.
     
    Nalcor Energy spokeswoman Karen O'Neill said in an email that company officials were gathering information at the site of the hydroelectric project.
     
    Gilbert Bennett, vice-president of the Lower Churchill Project, issued a statement saying any recommendations stemming from the probe into the accident will be followed.
     
    "We will ensure a full safety investigation is completed and that the contractor and its workers implement all safety recommendations that might be identified following this incident," he said.
     
    The accident comes amid cost overruns, delays and the sudden departure of former Nalcor Energy president and CEO Ed Martin, along with questions over his departure package.
     
     
    Newfoundland and Labrador Premier Dwight Ball asked the province's auditor general on Sunday to review a $1.4-million severance payment made to Martin.
     
    Dwight Ball said he is referring the issue of Martin's severance package to "an independent outside agency" at the recommendation of the provincial justice department.
     
    Martin abruptly resigned from the provincial Crown corporation behind the Muskrat Falls hydroelectric project in a cloud of controversy that has enveloped the house of assembly for more than a month.
     
    The province has spent almost $4.8 billion building the dam and powerhouse on the Lower Churchill River, the largest publicly funded project in its history.
     
    Stan Marshall, the new head of Nalcor, said recently there's little chance the troubled hydro project will be cancelled despite the soaring costs and delays.
     
    He is assessing cost and schedule overruns for a full status update he hopes to deliver in late June, and could include replacing the major construction contractor, Astaldi.

    MORE National ARTICLES

    Ruth Ellen Brosseau Fires Back After Personal Attacks Online Over Elbowing Incident

    Ruth Ellen Brosseau Fires Back After Personal Attacks Online Over Elbowing Incident
    She's also retweeted and challenged a number of Twitter users who have blamed her for being elbowed, saying she shouldn't have been standing in Trudeau's path.

    Ruth Ellen Brosseau Fires Back After Personal Attacks Online Over Elbowing Incident

    Halifax Gas Station Owner Watches Big Bear Stroll Through Lot After Getting Into Garbage

    Halifax Gas Station Owner Watches Big Bear Stroll Through Lot After Getting Into Garbage
    HALIFAX — Gennadiy Shcherbin says he will look over his shoulder a little more carefully after seeing a "huge" bear casually wander through the parking lot at his Halifax-area gas station.

    Halifax Gas Station Owner Watches Big Bear Stroll Through Lot After Getting Into Garbage

    Alberta Bringing In Extra Firefighters To Gain Upper Hand On Fort McMurray Fire

    Alberta Bringing In Extra Firefighters To Gain Upper Hand On Fort McMurray Fire
    EDMONTON — A massive wildfire that destroyed parts of Fort McMurray hasn't grown in size in the forest around the city and officials are planning a surge of firefighters in the coming days to try to gain the upper hand.

    Alberta Bringing In Extra Firefighters To Gain Upper Hand On Fort McMurray Fire

    Three-Metre Boa Constrictor Missing From Newfoundland Pet Shop May Be Dangerous Says Manager

    Jenette Blanchard of the Wild World store on Humber Street in Corner Brook says the female red-tail boa constrictor was taken out of her enclosure by intruders who broke into the shop between 10 p.m. on Thursday and 8 a.m. Friday.

    Three-Metre Boa Constrictor Missing From Newfoundland Pet Shop May Be Dangerous Says Manager

    How Social Licence Came To Dominate The Pipeline Debate In Canada

    How Social Licence Came To Dominate The Pipeline Debate In Canada
    VANCOUVER — When Canadian mining executive Jim Cooney coined the term social licence in 1997, he was talking about building support for mines in developing countries, not resource projects at home.

    How Social Licence Came To Dominate The Pipeline Debate In Canada

    Abbotsford Police Respond To Gunshot At Hotel, No Evidence Of Injuries

    Police say the caller said they believed the shot came from an adjacent suite at the hotel (in the 1800-block of Sumas Way).

    Abbotsford Police Respond To Gunshot At Hotel, No Evidence Of Injuries