Sunday, December 21, 2025
ADVT 
National

Archeological Survey Says No Indigenous Artifacts At Montreal Office Tower Sitec

Darpan News Desk The Canadian Press, 23 Mar, 2015 11:16 AM

    MONTREAL — Construction has resumed at the site of a Montreal office tower after an archeological survey put to rest any concerns there were indigenous artifacts in the ground below.

    Ivanhoe Cambridge stopped excavation work in mid-February after citizen concerns the site might contain artifacts linked to the Dawson archeological site, remnants of an ancient Iroquois village discovered in 1859.

    The real-estate arm of Quebec's pension fund manager, the Caisse de depot et placement, said in a statement Monday a survey has given it the all-clear to continue building the 27-storey Maison Manuvie office tower.

    Ivanhoe commissioned the study despite having proper permits that said the project was outside any designated archeological zones.

    The Dawson excavation site is considered a potential site of the Iroquois village of Hochelaga as described by Jacques Cartier during his second trip in 1535. The village near Mount Royal was located in present-day Montreal, although its exact location remains unknown.

    The Dawson site has historical resonance for many, said Andre Costopoulos, a McGill University anthropology professor.

    "It (the Dawson site) was clearly an important residential site, a large village site that was probably occupied for a long period of time," Costopoulos said. "The finds that were made there are still quite important in understanding what happened in the St-Lawrence Valley in late pre-history."

    The chances of finding Hochelaga are fairly remote.

    "The more development on the island, the fewer candidate sites remain undisturbed," Costopoulos said.

    The survey, conducted by the firm Archeotec, said the soils were stripped during road and infrastructure construction in the 19th and 20th, leaving little to unearth.

    "In particular, the surface soils that could conceal archaeological elements connected to site are clearly not there," the firm said. 

    Robert Galbraith, a freelance photographer who sounded the alarm, said he's not surprised by the results, but believes better care should be taken given the increase in construction.

    "If we took for granted every time we built in a sensitive area of heritage concern, we would never have anything left," Galbraith said.

    The office tower will house Manulife (TSX: MFC) employees following that company's $4-billion acquisition of Standard Life Canada last September.

    MORE National ARTICLES

    Kinder Morgan Says B.C. Spill Plan Not Required To Be Public, Unlike Washington

    Kinder Morgan Says B.C. Spill Plan Not Required To Be Public, Unlike Washington
    VANCOUVER — An emergency response plan for the proposed $5.4-billion Trans Mountain pipeline expansion will remain secret in British Columbia — even though a similar plan was recently made public in Washington state.

    Kinder Morgan Says B.C. Spill Plan Not Required To Be Public, Unlike Washington

    'I Can't Wait To See What You're Up To Next,' Justin Trudeau Tells Robert Ghiz

    'I Can't Wait To See What You're Up To Next,' Justin Trudeau Tells Robert Ghiz
    CHARLOTTETOWN — Premier Robert Ghiz of Prince Edward Island was wooed Friday evening with appeals to run federally, calls he hasn't dismissed as he exits the political stage this weekend.

    'I Can't Wait To See What You're Up To Next,' Justin Trudeau Tells Robert Ghiz

    Toronto Mother Arrested After Boy, 4, Found Wandering Naked On Cold Street Outside

    Toronto Mother Arrested After Boy, 4, Found Wandering Naked On Cold Street Outside
    TORONTO — While the family of a Toronto toddler who died after spending hours in the frigid cold was making funeral arrangements, police charged the mother of another boy after the child was found wandering naked outside in the city's west end.

    Toronto Mother Arrested After Boy, 4, Found Wandering Naked On Cold Street Outside

    Kinder Morgan President Says B.C. Spill Plan Doesn't Need To Be Public

    Kinder Morgan President Says B.C. Spill Plan Doesn't Need To Be Public
    VANCOUVER — The head of Kinder Morgan says a full emergency response plan for the proposed $5.4-billion Trans Mountain pipeline expansion in British Columbia will remain hidden though a similar scheme has been made public in neighbouring Washington.

    Kinder Morgan President Says B.C. Spill Plan Doesn't Need To Be Public

    British Columbia Mountain Resort To Open Via Ferrata Climbing Attraction

    British Columbia Mountain Resort To Open Via Ferrata Climbing Attraction
    GOLDEN, B.C. — The number of via ferratas in Canada is growing. Kicking Horse Mountain Resort says it plans to open one of the climbing attractions this summer.

    British Columbia Mountain Resort To Open Via Ferrata Climbing Attraction

    Mom of autistic boy who was handcuffed says school system failing kids like hers

    Mom of autistic boy who was handcuffed says school system failing kids like hers
    OTTAWA — The mother of a nine-year-old autistic boy who was handcuffed by a police officer during a "difficult day" at school says children like hers are being failed by the education system.

    Mom of autistic boy who was handcuffed says school system failing kids like hers