Friday, December 26, 2025
ADVT 
National

B.C. Government Says Site C Hydroelectric Project Surpasses 2,000 Workers

Darpan News Desk The Canadian Press, 20 Mar, 2017 12:53 PM
  • B.C. Government Says Site C Hydroelectric Project Surpasses 2,000 Workers
FORT ST. JOHN, B.C. — More than 2,000 people are now working on the Site C hydroelectric project on the Peace River in northeastern British Columbia, reaching what the provincial government says is an employment milestone.
 
Statistics from BC Hydro show 2,124 people worked on the Site C project in January, breaking the 2,000 employee barrier with an increase of 208 workers since December 2016.
 
The Ministry of Energy and Mines says in a news release says 1,719 positions in January were held by workers from B.C., and 41 per cent of those were from the Peace River Regional District.
 
Education Minister Mike Bernier, who represents the Peace River South riding, says the Site C project is making a significant contribution to the region's economy.
 
The latest job numbers reflect increased construction on road realignment around the project, as well as preparatory work for the dam and hydroelectric generating station which will span the river.
 
When the project is complete in 2024, BC Hydro says it will produce enough energy to power the equivalent of about 450,000 homes per year.

MORE National ARTICLES

B.C. Environment Minister Cancels Waste Discharge Permit At Shawnigan Lake

VICTORIA — British Columbia's environment minister cancelled a waste discharge permit for the company operating a dump site for contaminated soil that has been the subject of years of protests and court actions by local residents.

B.C. Environment Minister Cancels Waste Discharge Permit At Shawnigan Lake

Mumps Cases In Toronto Linked To Bars Rises To 17: Public Health Officials

Mumps Cases In Toronto Linked To Bars Rises To 17: Public Health Officials
Public health officials in Toronto say there are now 17 confirmed cases of mumps linked to bars in the city's downtown.

Mumps Cases In Toronto Linked To Bars Rises To 17: Public Health Officials

Verdict Expected In Calgary Murder Trial Of Parents In Diabetic Son's Death

Verdict Expected In Calgary Murder Trial Of Parents In Diabetic Son's Death
CALGARY — A judge is expected to rule today whether the parents of a diabetic boy who died of starvation and lack of treatment are guilty of first-degree murder.

Verdict Expected In Calgary Murder Trial Of Parents In Diabetic Son's Death

Grieving Saskatchewan Family Angry Convicted Drunk Driver Moved To Healing Lodge

SASKATOON — A relative of a Saskatchewan family killed in a drunk-driving crash says the woman convicted of their deaths was transferred to a healing lodge one month after being sentenced to 10 years in prison.

Grieving Saskatchewan Family Angry Convicted Drunk Driver Moved To Healing Lodge

Huge, Hairy Animal Washes Up Ashore In Philippines, Leaves Locals Baffled

Huge, Hairy Animal Washes Up Ashore In Philippines, Leaves Locals Baffled
On the afternoon of February 22, locals began posting pictures of an unidentified, white mass on social media - pictures that have since then been picked up by various news channels. 

Huge, Hairy Animal Washes Up Ashore In Philippines, Leaves Locals Baffled

Geotechnical Experts Called As 400-metre Crack Spotted Near Site C Work Area

Geotechnical Experts Called As 400-metre Crack Spotted Near Site C Work Area
VANCOUVER — BC Hydro has confirmed that a 400-metre crack has appeared in the ground near the Site C hydroelectric project in northeastern British Columbia.

Geotechnical Experts Called As 400-metre Crack Spotted Near Site C Work Area