BC Hydro says it should have been more proactive as Site C costs overflowed

Darpan News Desk The Canadian Press, 04 Nov, 2025 10:00 AM
  • BC Hydro says it should have been more proactive as Site C costs overflowed

British Columbia's power utility says it should have been more proactive about ballooning costs on the massive Site C hydroelectric dam project, partly blaming a failure to budget for "low-probability, high-consequence risks."

BC Hydro says in a "lessons learned report" to the British Columbia Utilities Commission that it's on track to complete the project on the Peace River within a $16 billion budget.

But that's almost double the original 2014 budget of about $8.8 billion, which was increased twice, in 2018 and 2021.

BC Hydro blames the huge overrun on the pandemic, as well as a failure to budget for low-probability risks that included substantial geotechnical problems.

The utility says it should have "ramped up its internal project resources more proactively and sooner."

Site C is the third hydro dam on the Peace River in northeastern B.C. and it provides enough electricity to power about 450,000 homes every year. 

The 224-page report, submitted last Thursday, says future projects should better communicate the "breadth" of risks with the potential for significant impacts on budget and scheduling.

An executive summary says that "consistent with industry best practices" the methodology of the project’s cost-risk analysis meant that unlikely risks were excluded from the original budget. 

"Accordingly, the project contingency and project reserve were both insufficient to absorb the full costs when these high-consequence, low-probability risk events materialized."

It says that while the pandemic was "unforeseen," the potential geotechnical challenges were understood.

Enhancing the dam's right bank foundation accounted for $1.1 billion of the overall budget increase, left bank cracks accounted for $600 million, and construction delays caused by the COVID-19 pandemic accounted for $1.6 billion.

Further costs increases were related to contractor claims, redesigns, and other factors, it says. 

However, the report also says the challenges that sent the budget soaring were met with "ingenuity and determination."

"Overall, BC Hydro reflects on the Site C Project with pride and a commitment to learn and improve," the summary says.

Picture Courtesy: THE CANADIAN PRESS/Jonathan Hayward

MORE National ARTICLES

Carney: 'We stand ready' for Trump to resume trade talks

Carney: 'We stand ready' for Trump to resume trade talks
Canadian negotiators "stand ready" for the Americans to resume trade negotiations, Prime Minister Mark Carney said Friday after U.S. President Donald Trump abruptly ended those talks late Thursday night.

Carney: 'We stand ready' for Trump to resume trade talks

Anand says Canada is in a 'strategic partnership' with China

Anand says Canada is in a 'strategic partnership' with China
Just three years after Canada called China a "disruptive global power," Foreign Affairs Minister Anita Anand says Canada now views Beijing as a strategic partner in a dangerous world.

Anand says Canada is in a 'strategic partnership' with China

CIRB rules against Canada Post union's challenge to back-to-work order

CIRB rules against Canada Post union's challenge to back-to-work order
The Canada Industrial Relations Board has ruled against the union at Canada Post in its challenge to Ottawa's move last year to force the postal employees back to work.

CIRB rules against Canada Post union's challenge to back-to-work order

Federal, Ontario governments contributing $3B to small nuclear reactor project

Federal, Ontario governments contributing $3B to small nuclear reactor project
The federal and Ontario governments are putting a total of $3 billion toward a project to build four small nuclear reactors in the Greater Toronto Area.

Federal, Ontario governments contributing $3B to small nuclear reactor project

Carney says ports, minerals key to his plan to double non-U.S. exports

Carney says ports, minerals key to his plan to double non-U.S. exports
Prime Minister Mark Carney says building up port infrastructure and exporting more resources, such as critical minerals from Ontario's Ring of Fire, are the keys to his plan to boost Canada's non-U.S. exports.

Carney says ports, minerals key to his plan to double non-U.S. exports

Alberta legislature set to resume fall sitting amid provincewide teachers strike

Alberta legislature set to resume fall sitting amid provincewide teachers strike
Alberta politicians return to work in the legislature today in a fall sitting that is already overshadowed by a provincewide teachers strike.

Alberta legislature set to resume fall sitting amid provincewide teachers strike