Thursday, January 22, 2026
ADVT 
National

BC Hydro says it should have been more proactive as Site C costs overflowed

Darpan News Desk The Canadian Press, 04 Nov, 2025 10:00 AM
  • BC Hydro says it should have been more proactive as Site C costs overflowed

British Columbia's power utility says it should have been more proactive about ballooning costs on the massive Site C hydroelectric dam project, partly blaming a failure to budget for "low-probability, high-consequence risks."

BC Hydro says in a "lessons learned report" to the British Columbia Utilities Commission that it's on track to complete the project on the Peace River within a $16 billion budget.

But that's almost double the original 2014 budget of about $8.8 billion, which was increased twice, in 2018 and 2021.

BC Hydro blames the huge overrun on the pandemic, as well as a failure to budget for low-probability risks that included substantial geotechnical problems.

The utility says it should have "ramped up its internal project resources more proactively and sooner."

Site C is the third hydro dam on the Peace River in northeastern B.C. and it provides enough electricity to power about 450,000 homes every year. 

The 224-page report, submitted last Thursday, says future projects should better communicate the "breadth" of risks with the potential for significant impacts on budget and scheduling.

An executive summary says that "consistent with industry best practices" the methodology of the project’s cost-risk analysis meant that unlikely risks were excluded from the original budget. 

"Accordingly, the project contingency and project reserve were both insufficient to absorb the full costs when these high-consequence, low-probability risk events materialized."

It says that while the pandemic was "unforeseen," the potential geotechnical challenges were understood.

Enhancing the dam's right bank foundation accounted for $1.1 billion of the overall budget increase, left bank cracks accounted for $600 million, and construction delays caused by the COVID-19 pandemic accounted for $1.6 billion.

Further costs increases were related to contractor claims, redesigns, and other factors, it says. 

However, the report also says the challenges that sent the budget soaring were met with "ingenuity and determination."

"Overall, BC Hydro reflects on the Site C Project with pride and a commitment to learn and improve," the summary says.

Picture Courtesy: THE CANADIAN PRESS/Jonathan Hayward

MORE National ARTICLES

Canada adds surprise 60,000 jobs in September, unemployment rate steady at 7.1%

Canada adds surprise 60,000 jobs in September, unemployment rate steady at 7.1%
Economists had called for a gain of just 5,000 jobs in September, coming off losses of more than 100,000 positions over the previous two months.

Canada adds surprise 60,000 jobs in September, unemployment rate steady at 7.1%

Carney says renegotiating CUSMA likely won't resolve all trade issues with U.S.

Carney says renegotiating CUSMA likely won't resolve all trade issues with U.S.
Prime Minister Mark Carney says it's clear the U.S. will keep targeting certain sectors with tariffs even after the renegotiation of the Canada-U.S.-Mexico Agreement on trade.

Carney says renegotiating CUSMA likely won't resolve all trade issues with U.S.

Eight protesters arrested after allegedly breaking into MP's office: Toronto police

Eight protesters arrested after allegedly breaking into MP's office: Toronto police
Toronto police say eight people have been arrested after they allegedly broke into the office of a member of Parliament and refused to leave as part of a protest Thursday morning.

Eight protesters arrested after allegedly breaking into MP's office: Toronto police

Mail delivery set to resume as Canada Post workers to switch to rotating strikes

Mail delivery set to resume as Canada Post workers to switch to rotating strikes
Mail delivery is set to resume on a limited basis after the union representing Canada Post employees announced it would transition from a countrywide strike to rotating stoppages starting Saturday morning.

Mail delivery set to resume as Canada Post workers to switch to rotating strikes

Woman attacked by bear while walking dog in Squamish, B.C., wildlife area

Woman attacked by bear while walking dog in Squamish, B.C., wildlife area
British Columbia's Conservation Officer Service is warning residents after a bear attack this week in the Squamish area north of Vancouver.

Woman attacked by bear while walking dog in Squamish, B.C., wildlife area

MP warns against further Indian Act changes before proper study in House of Commons

MP warns against further Indian Act changes before proper study in House of Commons
A Liberal MP is warning a Senate committee studying changes to the Indian Act that it might end up doing more harm than good if it pursues changes to the Indian Act that were never endorsed by MPs.

MP warns against further Indian Act changes before proper study in House of Commons