Saturday, December 27, 2025
ADVT 
National

BC Hydro seeks baseload power boost from stable sources

Darpan News Desk The Canadian Press, 04 Jun, 2025 01:45 PM
  • BC Hydro seeks baseload power boost from stable sources

British Columbia's power utility has begun the process to boost the province's baseload electricity generation capacity in a bid to meet the province's growing demand from residents and industries.

Baseload capacity refers to constant and stable power sources and Energy Minister Adrian Dix said Wednesday that BC Hydro is requesting expressions of interest from companies to provide geothermal or hydroelectric projects to expand long-term power capacity and meet peak demand.

BC Hydro has also launched a second request seeking partners who can deliver "market-ready technologies" for boosting power conservation in homes and buildings across the province.

Dix said both requests are aimed at matching B.C.'s growth potential with stable and affordable electricity supply.

"It is so important to our system," Dix said at a news conference alongside BC Hydro chief executive Chris O'Riley. 

"(It is) important because it allows us to take on relatively low-cost, intermittent energy such as wind and solar, important because it's going to power our economy at a time we have never seen so much demand for electricity and so much potential for growth."

Dix said BC Hydro may explore as part of the request several types of projects including "pumped storage" hydro power generation, a system where water is pumped to an elevated reservoir during times of low electricity demand then released to generate power during peak periods.

The province did not specify how much baseload power generation it wants to add in the new request, and Dix said that was a specific decision because BC Hydro wanted to cast a wide net in terms of possible solutions it might adopt.

"There isn't a number," Dix said about the amount of electricity B.C. is looking for. "The reason for (the) expression of interest, the reason we have a short turnaround, is we want to see what's out there. 

"We believe that BC Hydro needs more firm power. That could be hydro power. That could things such as geothermal power." 

O'Riley said the conservation technology being sought in the second request is also crucial to B.C.'s overall energy picture. 

"We're also focused on energy efficiency because … the cleanest and most cost-effective energy … is power that we don't use," he said. "As part of our expanded $700 million energy efficiency plan, we're looking for partners who can bring market-ready technologies that significantly improve energy efficiency in homes and businesses across B.C. and that will help our customers save energy and money."

The province said it will accept applications on both the baseload power generation and conservation technologies until September.

BC Hydro has been dealing with a long-term drought that forced the province to import electricity last fiscal year.

The Crown utility said 13,600 gigawatt hours of power was imported in 2024 — about 22 per cent of all B.C's power — but that the province has been a net electricity exporter for eight of the last 15 years.

The utility last year issued a call for power from renewable sources, later selecting nine wind and one solar project — but these are distinct from baseload projects because they rely on what BC Hydro calls "uncontrollable conditions."

Dix dismissed the notion that recent drought conditions and B.C. having to import power were factors in the process to look for more baseload power generation capacity, noting that this year's conditions are "looking better than last year" while "still facing the impact" of droughts.

"This call for power … is about the growth of our economy, about the opportunities in mining, about the requests for power that are at an extremely high level," he said. "We've got to build out clean electricity, which is one of our significant economic advantages in B.C.

"We have a lot more people in B.C. than we did … (and) we want to be in a position to build B.C. in the way that we did in the 1960s, which advanced a period of exceptional growth in our economy."

Picture Courtesy: THE CANADIAN PRESS/Darryl Dyck

MORE National ARTICLES

Jump in number of respiratory cases at B.C. Children's Hospital emergency room

Jump in number of respiratory cases at B.C. Children's Hospital emergency room
British Columbia's Children's Hospital says it's seen a steady rise in the number of children coming in with respiratory symptoms. The hospital says in a statement that about 44 per cent of total visits from children to the emergency department involve respiratory illness. 

Jump in number of respiratory cases at B.C. Children's Hospital emergency room

Vancouver heritage building being demolished over risk of collapse

Vancouver heritage building being demolished over risk of collapse
The building at 500 Dunsmuir St., commonly known as Dunsmuir House, was built in 1909 initially as a hotel. It has also served as barracks for sailors in the Second World War, a Salvation Army home for veterans and later social housing, but has been empty since 2013.

Vancouver heritage building being demolished over risk of collapse

Killer on parole is arrested in B.C. over threats made when his points card failed

Killer on parole is arrested in B.C. over threats made when his points card failed
Police in Vancouver say they've arrested a 66-year-old man for uttering threats against a gas station clerk and only later learned the suspect was a convicted murderer out on parole from a life sentence. They say the alleged threat was made to the attendant on Saturday when the man's points card wouldn't work. 

Killer on parole is arrested in B.C. over threats made when his points card failed

Three children sent to hospital after being hit by vehicle in southern Alberta

Three children sent to hospital after being hit by vehicle in southern Alberta
Police in southern Alberta are investigating after three children were struck by a vehicle. Officers responded to a call after the children — ages 14, seven and five — were hit in a marked crosswalk in Lethbridge, Alta.

Three children sent to hospital after being hit by vehicle in southern Alberta

Finnish developer pitches 250-room floating hotel for Vancouver harbour

Finnish developer pitches 250-room floating hotel for Vancouver harbour
A Finnish developer wants to bring a 250-room floating hotel into Vancouver's harbour. A statement from Sunborn International Holding says the proposed hotel would be 136 metres long and 19.5 metres high, spread out over six floors and connected to the Vancouver Convention Centre by a ramp from the seawall walkway.

Finnish developer pitches 250-room floating hotel for Vancouver harbour

B.C. launches short-term rental registry with annual fees to rein in 'speculators'

B.C. launches short-term rental registry with annual fees to rein in 'speculators'
Housing Minister Ravi Kahlon says B.C. is launching a registry for short-term rentals to further crack down on "speculators" operating illegally. Kahlon says all short-term rental operators on platforms such as Airbnb and Vrbo must apply for a registration number to be displayed on all online listings by May 1, and hosts who fail to comply will have their listings taken down from June 1. 

B.C. launches short-term rental registry with annual fees to rein in 'speculators'