Sunday, December 28, 2025
ADVT 
National

BC Hydro seeks baseload power boost from stable sources

Darpan News Desk The Canadian Press, 04 Jun, 2025 01:45 PM
  • BC Hydro seeks baseload power boost from stable sources

British Columbia's power utility has begun the process to boost the province's baseload electricity generation capacity in a bid to meet the province's growing demand from residents and industries.

Baseload capacity refers to constant and stable power sources and Energy Minister Adrian Dix said Wednesday that BC Hydro is requesting expressions of interest from companies to provide geothermal or hydroelectric projects to expand long-term power capacity and meet peak demand.

BC Hydro has also launched a second request seeking partners who can deliver "market-ready technologies" for boosting power conservation in homes and buildings across the province.

Dix said both requests are aimed at matching B.C.'s growth potential with stable and affordable electricity supply.

"It is so important to our system," Dix said at a news conference alongside BC Hydro chief executive Chris O'Riley. 

"(It is) important because it allows us to take on relatively low-cost, intermittent energy such as wind and solar, important because it's going to power our economy at a time we have never seen so much demand for electricity and so much potential for growth."

Dix said BC Hydro may explore as part of the request several types of projects including "pumped storage" hydro power generation, a system where water is pumped to an elevated reservoir during times of low electricity demand then released to generate power during peak periods.

The province did not specify how much baseload power generation it wants to add in the new request, and Dix said that was a specific decision because BC Hydro wanted to cast a wide net in terms of possible solutions it might adopt.

"There isn't a number," Dix said about the amount of electricity B.C. is looking for. "The reason for (the) expression of interest, the reason we have a short turnaround, is we want to see what's out there. 

"We believe that BC Hydro needs more firm power. That could be hydro power. That could things such as geothermal power." 

O'Riley said the conservation technology being sought in the second request is also crucial to B.C.'s overall energy picture. 

"We're also focused on energy efficiency because … the cleanest and most cost-effective energy … is power that we don't use," he said. "As part of our expanded $700 million energy efficiency plan, we're looking for partners who can bring market-ready technologies that significantly improve energy efficiency in homes and businesses across B.C. and that will help our customers save energy and money."

The province said it will accept applications on both the baseload power generation and conservation technologies until September.

BC Hydro has been dealing with a long-term drought that forced the province to import electricity last fiscal year.

The Crown utility said 13,600 gigawatt hours of power was imported in 2024 — about 22 per cent of all B.C's power — but that the province has been a net electricity exporter for eight of the last 15 years.

The utility last year issued a call for power from renewable sources, later selecting nine wind and one solar project — but these are distinct from baseload projects because they rely on what BC Hydro calls "uncontrollable conditions."

Dix dismissed the notion that recent drought conditions and B.C. having to import power were factors in the process to look for more baseload power generation capacity, noting that this year's conditions are "looking better than last year" while "still facing the impact" of droughts.

"This call for power … is about the growth of our economy, about the opportunities in mining, about the requests for power that are at an extremely high level," he said. "We've got to build out clean electricity, which is one of our significant economic advantages in B.C.

"We have a lot more people in B.C. than we did … (and) we want to be in a position to build B.C. in the way that we did in the 1960s, which advanced a period of exceptional growth in our economy."

Picture Courtesy: THE CANADIAN PRESS/Darryl Dyck

MORE National ARTICLES

Police in B.C. suspect homicide after body found in fire at Surrey abandoned house

Police in B.C. suspect homicide after body found in fire at Surrey abandoned house
Police in Surrey say homicide investigators have taken over the case of a body found after a fire was put out at an abandoned house over the weekend. Police say the death of man whose body was found inside the house in the 9800 block 138th Street is being treated as suspicious and the homicide investigation team has taken over the investigation.

Police in B.C. suspect homicide after body found in fire at Surrey abandoned house

Crackdown on retail theft in Richmond with a 22% increase in arrests for the crime

Crackdown on retail theft in Richmond with a 22% increase in arrests for the crime
Mounties in Richmond say a crackdown on retail theft in the city has been successful with a 22 per cent increase in arrests for the crime. RCMP officers responded to more than 17-hundred shoplifting reports in the city last year -- an increase of 25 per cent compared with 2023.

Crackdown on retail theft in Richmond with a 22% increase in arrests for the crime

Overnight shooting in Newton

Overnight shooting in Newton
Police in Surrey are investigating an overnight shooting at a home in the Newton neighbourhood. They say that shortly after one this morning, a resident on the 71-hundred block of 128th street reported coming home to find several gunshot holes in the side of their house.

Overnight shooting in Newton

With the House of Commons prorogued, some key Liberal legislation may not pass

With the House of Commons prorogued, some key Liberal legislation may not pass
Gov. Gen. Mary Simon granted Justin Trudeau's request Monday to prorogue Parliament until Mar. 24, suspending activities of the House of Commons while the Liberals move to replace him as both Liberal Leader and prime minister. The move means the legislative agenda will be reset once the House of Commons reconvenes in March and some key pieces of legislation for the government may die on the order paper. 

With the House of Commons prorogued, some key Liberal legislation may not pass

Trump responds to Trudeau's resignation with dig about 51st state

Trump responds to Trudeau's resignation with dig about 51st state
Trump reiterated his rhetoric about Canada joining the United States in a post on Truth Social after Trudeau’s announcement that he will resign as Liberal leader and prime minister as soon as a new leader is chosen.

Trump responds to Trudeau's resignation with dig about 51st state

WestJet flight attendants launch lawsuit

WestJet flight attendants launch lawsuit
The B-C Supreme Court says WestJet must turn over harassment complaint files spanning years covered by a long-running class-action lawsuit launched by flight attendants over alleged sexual harassment by company pilots. The court ruling says WestJet has been slow to hand over documents in the case, which was filed in 2016 by lead plaintiff Mandalena Lewis.

WestJet flight attendants launch lawsuit