Wednesday, December 31, 2025
ADVT 
National

BC Hydro seeks baseload power boost from stable sources

Darpan News Desk The Canadian Press, 04 Jun, 2025 01:45 PM
  • BC Hydro seeks baseload power boost from stable sources

British Columbia's power utility has begun the process to boost the province's baseload electricity generation capacity in a bid to meet the province's growing demand from residents and industries.

Baseload capacity refers to constant and stable power sources and Energy Minister Adrian Dix said Wednesday that BC Hydro is requesting expressions of interest from companies to provide geothermal or hydroelectric projects to expand long-term power capacity and meet peak demand.

BC Hydro has also launched a second request seeking partners who can deliver "market-ready technologies" for boosting power conservation in homes and buildings across the province.

Dix said both requests are aimed at matching B.C.'s growth potential with stable and affordable electricity supply.

"It is so important to our system," Dix said at a news conference alongside BC Hydro chief executive Chris O'Riley. 

"(It is) important because it allows us to take on relatively low-cost, intermittent energy such as wind and solar, important because it's going to power our economy at a time we have never seen so much demand for electricity and so much potential for growth."

Dix said BC Hydro may explore as part of the request several types of projects including "pumped storage" hydro power generation, a system where water is pumped to an elevated reservoir during times of low electricity demand then released to generate power during peak periods.

The province did not specify how much baseload power generation it wants to add in the new request, and Dix said that was a specific decision because BC Hydro wanted to cast a wide net in terms of possible solutions it might adopt.

"There isn't a number," Dix said about the amount of electricity B.C. is looking for. "The reason for (the) expression of interest, the reason we have a short turnaround, is we want to see what's out there. 

"We believe that BC Hydro needs more firm power. That could be hydro power. That could things such as geothermal power." 

O'Riley said the conservation technology being sought in the second request is also crucial to B.C.'s overall energy picture. 

"We're also focused on energy efficiency because … the cleanest and most cost-effective energy … is power that we don't use," he said. "As part of our expanded $700 million energy efficiency plan, we're looking for partners who can bring market-ready technologies that significantly improve energy efficiency in homes and businesses across B.C. and that will help our customers save energy and money."

The province said it will accept applications on both the baseload power generation and conservation technologies until September.

BC Hydro has been dealing with a long-term drought that forced the province to import electricity last fiscal year.

The Crown utility said 13,600 gigawatt hours of power was imported in 2024 — about 22 per cent of all B.C's power — but that the province has been a net electricity exporter for eight of the last 15 years.

The utility last year issued a call for power from renewable sources, later selecting nine wind and one solar project — but these are distinct from baseload projects because they rely on what BC Hydro calls "uncontrollable conditions."

Dix dismissed the notion that recent drought conditions and B.C. having to import power were factors in the process to look for more baseload power generation capacity, noting that this year's conditions are "looking better than last year" while "still facing the impact" of droughts.

"This call for power … is about the growth of our economy, about the opportunities in mining, about the requests for power that are at an extremely high level," he said. "We've got to build out clean electricity, which is one of our significant economic advantages in B.C.

"We have a lot more people in B.C. than we did … (and) we want to be in a position to build B.C. in the way that we did in the 1960s, which advanced a period of exceptional growth in our economy."

Picture Courtesy: THE CANADIAN PRESS/Darryl Dyck

MORE National ARTICLES

Federal minister asks labour board to intervene in Canada Post strike

Federal minister asks labour board to intervene in Canada Post strike
Labour Minister Steven MacKinnon said he's referred the dispute to the Canada Industrial Relations Board, with the aim of ordering the nearly 55,000 workers back to work and extending the current collective agreement until May 22, 2025 — if the board determines a deal isn't within immediate reach.

Federal minister asks labour board to intervene in Canada Post strike

Nine-vehicle crash in Surrey, shuts Highway 99, disrupting commuter traffic

Nine-vehicle crash in Surrey, shuts Highway 99, disrupting commuter traffic
Police in Surrey say a section of Highway 99 remains closed the day after a nine-vehicle crash that sent six people to hospital. The Surrey Police Service says a transport vehicle was involved in collisions in the northbound lanes before crossing the median into oncoming southbound traffic near the Highway 91 interchange around 5:30 p.m. Thursday.

Nine-vehicle crash in Surrey, shuts Highway 99, disrupting commuter traffic

Meta gives in to CRTC disclosure order on Online News Act compliance

Meta gives in to CRTC disclosure order on Online News Act compliance
The CRTC asked Meta what measures it’s taking to comply with the Online News Act, and if news is being made available on its platforms — which would require the company to compensate media outlets for displaying their content. Meta blocked news from Facebook and Instagram in response to that legislation.

Meta gives in to CRTC disclosure order on Online News Act compliance

Some epilepsy patients worry their seizures will return amid medication shortage

Some epilepsy patients worry their seizures will return amid medication shortage
The Canadian Epilepsy Alliance says an ongoing shortage of an epilepsy medication is leaving some patients worried they'll start to have seizures again if they switch to an alternative.  The shortage of Teva-clobazam, which began last May, is expected to last until April next year, according to Health Canada's drug shortages website. 

Some epilepsy patients worry their seizures will return amid medication shortage

Canada not a significant source of fentanyl flowing into U.S., CBSA says

Canada not a significant source of fentanyl flowing into U.S., CBSA says
As Canada looks to beef up its border security after president-elect Donald Trump threatened tariffs while raising concerns about illicit fentanyl pouring into his country, border officials pointed out there's barely any coming from Canada. Though, none of them wanted to say the name Trump when they said so.

Canada not a significant source of fentanyl flowing into U.S., CBSA says

Rescue crews, aerial searchers on the lookout for missing skier at B.C. resort

Rescue crews, aerial searchers on the lookout for missing skier at B.C. resort
A skier has gone missing at a resort in the British Columbia Interior, and ground- and air-based search crews are canvassing the area for any sign of him. Sun Peaks Resort says in a statement that 68-year-old Tomasz Jaholkowski was last seen on Tuesday at its West Bowl chairlift on Tod Mountain, northeast of Kamloops. 

Rescue crews, aerial searchers on the lookout for missing skier at B.C. resort