Tuesday, July 7, 2026
ADVT 
National

BC Hydro seeks baseload power boost from stable sources

Darpan News Desk The Canadian Press, 04 Jun, 2025 01:45 PM
  • BC Hydro seeks baseload power boost from stable sources

British Columbia's power utility has begun the process to boost the province's baseload electricity generation capacity in a bid to meet the province's growing demand from residents and industries.

Baseload capacity refers to constant and stable power sources and Energy Minister Adrian Dix said Wednesday that BC Hydro is requesting expressions of interest from companies to provide geothermal or hydroelectric projects to expand long-term power capacity and meet peak demand.

BC Hydro has also launched a second request seeking partners who can deliver "market-ready technologies" for boosting power conservation in homes and buildings across the province.

Dix said both requests are aimed at matching B.C.'s growth potential with stable and affordable electricity supply.

"It is so important to our system," Dix said at a news conference alongside BC Hydro chief executive Chris O'Riley. 

"(It is) important because it allows us to take on relatively low-cost, intermittent energy such as wind and solar, important because it's going to power our economy at a time we have never seen so much demand for electricity and so much potential for growth."

Dix said BC Hydro may explore as part of the request several types of projects including "pumped storage" hydro power generation, a system where water is pumped to an elevated reservoir during times of low electricity demand then released to generate power during peak periods.

The province did not specify how much baseload power generation it wants to add in the new request, and Dix said that was a specific decision because BC Hydro wanted to cast a wide net in terms of possible solutions it might adopt.

"There isn't a number," Dix said about the amount of electricity B.C. is looking for. "The reason for (the) expression of interest, the reason we have a short turnaround, is we want to see what's out there. 

"We believe that BC Hydro needs more firm power. That could be hydro power. That could things such as geothermal power." 

O'Riley said the conservation technology being sought in the second request is also crucial to B.C.'s overall energy picture. 

"We're also focused on energy efficiency because … the cleanest and most cost-effective energy … is power that we don't use," he said. "As part of our expanded $700 million energy efficiency plan, we're looking for partners who can bring market-ready technologies that significantly improve energy efficiency in homes and businesses across B.C. and that will help our customers save energy and money."

The province said it will accept applications on both the baseload power generation and conservation technologies until September.

BC Hydro has been dealing with a long-term drought that forced the province to import electricity last fiscal year.

The Crown utility said 13,600 gigawatt hours of power was imported in 2024 — about 22 per cent of all B.C's power — but that the province has been a net electricity exporter for eight of the last 15 years.

The utility last year issued a call for power from renewable sources, later selecting nine wind and one solar project — but these are distinct from baseload projects because they rely on what BC Hydro calls "uncontrollable conditions."

Dix dismissed the notion that recent drought conditions and B.C. having to import power were factors in the process to look for more baseload power generation capacity, noting that this year's conditions are "looking better than last year" while "still facing the impact" of droughts.

"This call for power … is about the growth of our economy, about the opportunities in mining, about the requests for power that are at an extremely high level," he said. "We've got to build out clean electricity, which is one of our significant economic advantages in B.C.

"We have a lot more people in B.C. than we did … (and) we want to be in a position to build B.C. in the way that we did in the 1960s, which advanced a period of exceptional growth in our economy."

Picture Courtesy: THE CANADIAN PRESS/Darryl Dyck

MORE National ARTICLES

Trudeau says Poilievre "not able" to unite to defend Canada against Trump threats

Trudeau says Poilievre
Trudeau said there's a long-standing tradition that when the nation comes under threat in some way, Canadians pull together to defend their country.  But it's "increasingly clear" Poilievre is unable to do that.

Trudeau says Poilievre "not able" to unite to defend Canada against Trump threats

Early-rising Taylor Swift fans wait for hours in Vancouver for concert gear

Early-rising Taylor Swift fans wait for hours in Vancouver for concert gear
Taylor Swift fans were up before the sun in Vancouver to snag some coveted shirts, bags and sweaters to mark her record-breaking Eras Tour. A line of hundreds of fans snaked around Vancouver's downtown pier waiting for the first major in-person sale of official Swift merchandise ahead of three concerts in the city this week.

Early-rising Taylor Swift fans wait for hours in Vancouver for concert gear

Taiwan firm halts plan for $1B battery plant in B.C. that had federal support

Taiwan firm halts plan for $1B battery plant in B.C. that had federal support
A $1-billion lithium-ion battery cell production plant that was planned for Maple Ridge, B.C., has been shelved.  The parent company, Taiwan Cement Corp., announced construction of the Canadian plant with much fanfare last year, with Prime Minister Justin Trudeau and Premier David Eby attending and promising a combined $284.5 million in government funding. 

Taiwan firm halts plan for $1B battery plant in B.C. that had federal support

Contracts announced for Alaska Highway

Contracts announced for Alaska Highway
The federal government has awarded two contracts totalling more than 103-million dollars for maintenance work on he Alaska Highway in northern B-C. Public Services and Procurement Canada says the contracts cover work on two sections of the highway, from kilometres 133 to 968.

Contracts announced for Alaska Highway

Avian flu detected at another farm

Avian flu detected at another farm
It's the fifth flock where the virus has been detected in as many days, all in Abbotsford. It brings the total number of infected facilities in B-C to 63.

Avian flu detected at another farm

Senior dead in fatal crash

Senior dead in fatal crash
A 78-year-old woman is dead after ahead-on crash in the Fraser Valley last night. R-C-M-P say initial evidence suggests the woman was driving south on Wilson Street, outside Mission, when her car crossed the centre line.

Senior dead in fatal crash