Friday, July 3, 2026
ADVT 
National

B.C. LNG Industry Will Increase Fracking-Caused Earthquakes: Expert

Darpan News Desk The Canadian Press, 31 Aug, 2015 11:17 AM
  • B.C. LNG Industry Will Increase Fracking-Caused Earthquakes: Expert
VANCOUVER — If the liquefied natural gas industry proceeds as the British Columbia government hopes, there could be five times as many fracking-caused earthquakes, warns one expert.
 
But the company that would provide gas to a major LNG terminal — the same company found responsible for a 4.4 magnitude tremor last year — claims it won't ramp up drilling.
 
Progress Energy said it doesn't need to increase the number of wells it drills each year to supply Pacific NorthWest LNG's planned liquefaction and export terminal near Prince Rupert.
 
"Our upstream drilling activity will remain relatively consistent with current levels over the life of the LNG project or may even decline and therefore pose no incremental risk," said spokeswoman Stacie Dley in an email.
 
The company paused its operations after a 4.6 magnitude quake in northeast B.C. on Aug. 17. The B.C. Oil and Gas Commission is investigating and has not established its cause.
 
The commission has, however, confirmed that Progress Energy triggered a 4.4 magnitude tremor last August — among the largest caused by the industry in Canada.
 
The $36-billion Pacific NorthWest LNG project is a cornerstone of the B.C. Liberals' efforts to build a new natural gas export industry to Asia. It has been approved by the province but remains under federal review. 
 
David Hughes, a geoscientist who worked for the Geological Survey of Canada for 32 years, recently analyzed B.C.'s LNG plans for the Canadian Centre for Policy Alternatives.
 
In order to meet the province's highest estimate of five terminals delivering 82 million tonnes of LNG a year, drilling would have to increase five-fold by 2020 — up to 2,100 wells per year, he said.
 
"If five terminals get built, get ready for some unavoidable seismic activity. I don't think there's any way you can stop it," he said. "It's just the cost of doing business."
 
Hydraulic fracturing, or fracking, involves injecting high-pressure fluid into wells to crack rock and release natural gas. The process can trigger seismic events but most are not felt above ground.
 
Progress Energy said it doesn't need to drill greater numbers of wells each year because they can last decades. But Hughes said the structures decline quickly, with production falling up to 70 per cent after three years, and 288 new wells must be built each year to maintain current output.
 
The Oil and Gas Commission recorded 193 fracking-caused quakes between August 2013 and October 2014 in the Montney Trend, a siltstone formation stretching from near Dawson Creek to the Rocky Mountain foothills.
 
Of about 7,500 fracking operations, only 11 triggered events felt at the surface. None caused injuries or damage.
 
Asked how B.C. would reduce the quake risk caused by LNG, Natural Gas Development Minister Rich Coleman said it has brought in regulations, monitoring and prevention measures.
 
Operators must immediately stop drilling if seismic activity exceeds 4.0 magnitude. They can only resume once the commission has approved a mitigation plan that could include reducing drilling volumes or pressure.
 
"These regulations are reviewed regularly to ensure that B.C. has a safe, long-term future in natural gas supply and export," Coleman said in a statement.
 
However, the regulations aren't as strict as in Alberta, where companies must report all tremors greater than 2.0 magnitude and invoke a response plan.
 
John Clague, a Simon Fraser University earthquake expert, said 5.0 or 6.0 magnitude quakes have been linked to fracking in the U.S. and Asia, but it's unlikely the industry would cause anything larger.
 
"This is not a significant enough perturbation of rocks over a large enough area to trigger an earthquake of that size," he said.
 
But the quake risk, combined with other concerns including water use, has prompted some to call for a halt on fracking.
 
"It's a mess," said Eoin Madden of the Wilderness Committee.
 
"We really need to press pause, take a step back, and say, 'Do we want to fragment the whole of northeastern B.C. so we can extract gas out of it this way, or is there a different way for us?'"

MORE National ARTICLES

Indian Home Minister Rajnath Singh Holds Pakistan Responsible For Dinanagar Attack

  Holding Pakistan responsible for the July 27 Dinanagar terror attack, union Home Minister Rajnath Singh on Thursday said any attack by enemies will meet an effective and forceful response from the Indian security forces.

Indian Home Minister Rajnath Singh Holds Pakistan Responsible For Dinanagar Attack

Dutch Police Release Edmonton Murder Suspect Omar. J. Elkadry From Caribbean Island Jail

Dutch Police Release Edmonton Murder Suspect Omar. J. Elkadry From Caribbean Island Jail
In early June, Dutch authorities on the island of Saba arrested the man as a suspect in the death of the woman, whose body was found in April.

Dutch Police Release Edmonton Murder Suspect Omar. J. Elkadry From Caribbean Island Jail

Trial Off Until Next May For Man Charged In 2012 Quebec Election-night Shooting

Trial Off Until Next May For Man Charged In 2012 Quebec Election-night Shooting
MONTREAL — There has been yet another delay in the trial for the man charged in Quebec's 2012 election-night shooting.

Trial Off Until Next May For Man Charged In 2012 Quebec Election-night Shooting

Kinder Morgan Pipeline Opponents Furious About 'Chaotic' Review Process

VANCOUVER — Opponents of Kinder Morgan's plan to boost capacity of its Trans Mountain pipeline across southern B.C., accuse the National Energy Board of once again changing key dates in the review process.

Kinder Morgan Pipeline Opponents Furious About 'Chaotic' Review Process

Pipeline Critics Await High Court's Green Light To Challenge Energy Board

VANCOUVER — Opponents of Canada's big energy projects will soon learn if the country's highest court will consider an appeal that could drastically alter public participation in National Energy Board reviews.

Pipeline Critics Await High Court's Green Light To Challenge Energy Board

On A Scale Of Zero To Five, Manitoba Twister Bad But It Could Have Been Worse

On A Scale Of Zero To Five, Manitoba Twister Bad But It Could Have Been Worse
A massive tornado that struck western Manitoba this week has been given an preliminary rating which puts it in the category of large and violent, but not the worst that nature can serve up.

On A Scale Of Zero To Five, Manitoba Twister Bad But It Could Have Been Worse