Sunday, May 24, 2026
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    Explosive Fraser Valley house fire leaves two people with third-degree burns

    Explosive Fraser Valley house fire leaves two people with third-degree burns
    Two people have extensive third-degree burns after a house fire in B.C.'s eastern Fraser Valley

    Explosive Fraser Valley house fire leaves two people with third-degree burns

    TIME Person Of The Year: Modi Wins Poll, Loses Race

    TIME Person Of The Year: Modi Wins Poll, Loses Race
    Indian Prime Minister Narendra Modi is the winner of this year's reader poll for TIME Person of the Year, but his name does not figure in the magazine editors' own list of final eight.

    TIME Person Of The Year: Modi Wins Poll, Loses Race

    Modi Needs To Show Results, Not Hype In Building India-us Ties: Shashi Tharoor

    Modi Needs To Show Results, Not Hype In Building India-us Ties: Shashi Tharoor
     Washington is "not susceptible" to Prime Minister Narendra Modi's "brand of alliterative rhetoric" like the three Ds and five Ts and was looking for "results, not hype", Congress leader Shashi Tharoor said.

    Modi Needs To Show Results, Not Hype In Building India-us Ties: Shashi Tharoor

    Haryana's Headline-Grabbing Sisters: Local Heroes Or Serial Men Beaters?

    Haryana's Headline-Grabbing Sisters: Local Heroes Or Serial Men Beaters?
    Just a week back, they were 'role models' and the darlings of the media and dial-a-quote experts who had dared to take on male tormentors in a patriarchal society in Haryana. 

    Haryana's Headline-Grabbing Sisters: Local Heroes Or Serial Men Beaters?

    Imran Khan Vows To Unleash Countrywide 'Storm'

    Imran Khan Vows To Unleash Countrywide 'Storm'
     Pakistan Tehreek-i-Insaf (PTI) chief Imran Khan Monday vowed that a "storm" would be unleashed to "free the country from its oppressive rulers" after a party activist was killed in Faisalabad ahead of his call for a shutdown of the city, a Pakistani daily reported.

    Imran Khan Vows To Unleash Countrywide 'Storm'

    Turtles vs. turbines: Ontario's top court deciding on nine-turbine project

    Turtles vs. turbines: Ontario's top court deciding on nine-turbine project
    TORONTO — A legal battle pitting turtles against wind turbines is being heard in a packed Ontario courtroom.

    Turtles vs. turbines: Ontario's top court deciding on nine-turbine project