Wednesday, May 27, 2026
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    Today on the Hill: Melnyk patches things up with Alfie by hiring him

    Today on the Hill: Melnyk patches things up with Alfie by hiring him
    Ottawa Senators owner Eugene Melnyk and Daniel Alfredsson are expected to sit down to a news conference — together — along with Sens general manager Bryan Murray.

    Today on the Hill: Melnyk patches things up with Alfie by hiring him

    Evidence completed at Luka Rocco Magnotta's first-degree murder trial

    Evidence completed at Luka Rocco Magnotta's first-degree murder trial
    The case has been adjourned until next Wednesday, when the defence and Crown will give their closing arguments, followed by the judge's instructions to the jury.

    Evidence completed at Luka Rocco Magnotta's first-degree murder trial

    2 more possible leaks in Saskatchewan town where natural gas blast levelled home

    2 more possible leaks in Saskatchewan town where natural gas blast levelled home
    REGINA — SaskEnergy says it is investigating two more possible gas leaks in a community north of Regina where a rupture is suspected in an explosion that levelled a home.

    2 more possible leaks in Saskatchewan town where natural gas blast levelled home

    Republican Gov. Chris Christie heads to Calgary to talk energy, Keystone

    Republican Gov. Chris Christie heads to Calgary to talk energy, Keystone
    New Jersey Gov. Chris Christie is scheduled to meet with Alberta Premier Jim Prentice and give a speech to the Calgary Chamber of Commerce.

    Republican Gov. Chris Christie heads to Calgary to talk energy, Keystone

    B.C. Government Awards $200,000 Contract To Study Gabriola Bridge That Could Replace BC Ferries Serv

    B.C. Government Awards $200,000 Contract To Study Gabriola Bridge That Could Replace BC Ferries Serv
    VICTORIA — A $200,000 contract has been awarded to a Colorado-based company to study the feasibility of linking Gabriola Island and Vancouver Island by bridge.

    B.C. Government Awards $200,000 Contract To Study Gabriola Bridge That Could Replace BC Ferries Serv

    BC Ferries plans off-peak travel discounts

    BC Ferries plans off-peak travel discounts
    BC Ferries says its customers should have the opportunity to access an airline-style reservation system to book discounted fares online at off-peak travel times.

    BC Ferries plans off-peak travel discounts