Wednesday, May 27, 2026
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    Digital divide: More doctors now keeping patient records electronically: survey

    Digital divide: More doctors now keeping patient records electronically: survey
    TORONTO — Long reliant on paper-based patient files, the majority of Canadian doctors have now moved firmly into the 21st century, using electronic medical records and other forms of information technology to run their practices, a survey has found.

    Digital divide: More doctors now keeping patient records electronically: survey

    Woman kept dead husband's body because she thought he would be resurrected: Crown

    Woman kept dead husband's body because she thought he would be resurrected: Crown
    HAMILTON — A devoutly religious Hamilton woman who kept her husband's decomposing corpse in a bedroom for six months because she was convinced he would come back to life has pleaded guilty to failing to notify authorities of his death from an illness he was not getting treatment for.

    Woman kept dead husband's body because she thought he would be resurrected: Crown

    Mall shooting trial hears jury choice is between mental disorder and revenge

    Mall shooting trial hears jury choice is between mental disorder and revenge
    TORONTO — A forensic psychiatrist has conceded under cross-examination by the Crown that the man who shot up Toronto's Eaton Centre may have been motivated by revenge.

    Mall shooting trial hears jury choice is between mental disorder and revenge

    Canadian teacher goes on trial accused of child abuse at Indonesian school

    Canadian teacher goes on trial accused of child abuse at Indonesian school
    JAKARTA, Indonesia — A Canadian teacher and a teaching assistant went on trial Tuesday in Indonesia accused of sexually abusing a kindergarten student at an international school.

    Canadian teacher goes on trial accused of child abuse at Indonesian school

    Concerns about E. coli prompt ground beef recall in Western Canada

    Concerns about E. coli prompt ground beef recall in Western Canada
    OTTAWA — Federal health officials are recalling packages of ground beef produced by food giant Cargill due to concerns about E. coli.

    Concerns about E. coli prompt ground beef recall in Western Canada

    Fake pregnancy belly used in Barrie, Ont., electronics store theft: police

    Fake pregnancy belly used in Barrie, Ont., electronics store theft: police
    BARRIE, Ont. — Police say a pair of thieves used a fake pregnancy belly to steal numerous items from an electronics store in central Ontario.

    Fake pregnancy belly used in Barrie, Ont., electronics store theft: police