Wednesday, May 27, 2026
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    CBC, NHL websites briefly affected by Syrian Electronic Army hack

    CBC, NHL websites briefly affected by Syrian Electronic Army hack
    TORONTO — A group of politically motivated hackers operating under the name the Syrian Electronic Army briefly defaced the websites of the CBC, the NHL and a number of other prominent news outlets on Thursday.

    CBC, NHL websites briefly affected by Syrian Electronic Army hack

    Liberals Use Legislature To Set Stage For LNG, But Still No Deals

    Liberals Use Legislature To Set Stage For LNG, But Still No Deals
    VICTORIA — The stage has been set for the development of a liquefied natural gas industry by British Columbia's Liberal government, even though the first of what it says are 18 potential deals has yet to come to fruition.

    Liberals Use Legislature To Set Stage For LNG, But Still No Deals

    Advocates for sexual assault victims encouraged by Ghomeshi charges

    Advocates for sexual assault victims encouraged by Ghomeshi charges
    TORONTO — The sexual assault charges filed against former CBC Radio host Jian Ghomeshi offer tentative hope to those who fear their claims will be dismissed by an indifferent law enforcement system, victims' advocates said Wednesday.

    Advocates for sexual assault victims encouraged by Ghomeshi charges

    U.S. Ebola vaccine looks protective but may require high dose: study

    U.S. Ebola vaccine looks protective but may require high dose: study
    TORONTO — A single dose of a U.S.-designed Ebola vaccine may be protective against the disease, a new study suggests. But the research also appears to indicate that dose will have to be relatively large, which may present problems for the vaccine.

    U.S. Ebola vaccine looks protective but may require high dose: study

    1 In 3 Canadians Relying Strictly On Online Shopping For Holiday Gifts

    1 In 3 Canadians Relying Strictly On Online Shopping For Holiday Gifts
    TORONTO — A growing number of Canadians plan to do all of their holiday shopping online this year to avoid stepping foot in maddening malls, suggests a new survey commissioned by Google.

    1 In 3 Canadians Relying Strictly On Online Shopping For Holiday Gifts

    Mall shooter lied about fears to justify cold-blooded killing, prosecutor says

    Mall shooter lied about fears to justify cold-blooded killing, prosecutor says
    TORONTO — The man accused of a terrifying, deadly attack in a crowded downtown mall concocted a story about living in terror as a way to justify what was a cold-blooded killing, his first-degree murder trial heard Wednesday.

    Mall shooter lied about fears to justify cold-blooded killing, prosecutor says