Friday, December 26, 2025
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    Narendra Modi's Sydney Show Host Denies Claiming To Be Miss India Australia

    Narendra Modi's Sydney Show Host Denies Claiming To Be Miss India Australia
    In the light of a controversy over the alleged claim that she was Miss India Australia, the host of Prime Minister Narendra Modi's Sydney show has clarified she never claimed to be the title-holder for grabbing the event's anchoring.

    Narendra Modi's Sydney Show Host Denies Claiming To Be Miss India Australia

    CFB Petawawa Soldier Working On Coyote Patrol Vehicle At Time Of Deadly Incident

    CFB Petawawa Soldier Working On Coyote Patrol Vehicle At Time Of Deadly Incident
    CFB PETAWAWA, Ont. — The military says a Canadian soldier who died at CFB Petawawa in eastern Ontario was doing mechanic work on an armoured vehicle when the incident that killed him occurred.

    CFB Petawawa Soldier Working On Coyote Patrol Vehicle At Time Of Deadly Incident

    'Nude Judge' Misconduct Case To Start Anew With Sex Photos Off-limits For Now

    'Nude Judge' Misconduct Case To Start Anew With Sex Photos Off-limits For Now
    TORONTO — A second hearing into whether a senior Manitoba judge should be kicked off the bench is finally set to start in Winnipeg on Monday but sex photos central to the allegations against her will be off-limits — at least for the time being.

    'Nude Judge' Misconduct Case To Start Anew With Sex Photos Off-limits For Now

    City Of Ottawa Says Confident No Sensitive Details Leaked After Website Hacked

    City Of Ottawa Says Confident No Sensitive Details Leaked After Website Hacked
    OTTAWA — The City of Ottawa says it doesn't believe any sensitive information has been compromised after its website was hacked.

    City Of Ottawa Says Confident No Sensitive Details Leaked After Website Hacked

    More Arrests At B.C. Pipeline Protest; 11-year-old Girl Taken Into Custody

    More Arrests At B.C. Pipeline Protest; 11-year-old Girl Taken Into Custody
    The protesters were taken away Saturday after crossing a police line on Burnaby Mountain, where crews have been conducting survey work for the proposed Trans Mountain pipeline expansion.

    More Arrests At B.C. Pipeline Protest; 11-year-old Girl Taken Into Custody

    No Road Work, But Road Signs In Manitoba

    No Road Work, But Road Signs In Manitoba
    WINNIPEG - The Manitoba government has a policy that allows signs touting its economic agenda to be erected at construction sites long before work begins and to be left up over the winter lull, The Canadian Press has learned.

    No Road Work, But Road Signs In Manitoba