Sunday, May 17, 2026
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    'We walked through fire': Canadian-born woman, her family conquer flames to survive Greek fire

    'We walked through fire': Canadian-born woman, her family conquer flames to survive Greek fire
    BARI, Italy — Rain and wind lashed the deck of the burning ferry tossing in the Adriatic Sea, and passengers were fighting for the last places on the only lifeboat. Canadian-born Natasha Tsonas and her husband Nassos stood with their two sons amid the chaos, and the only thing left seemed to say goodbye.

    'We walked through fire': Canadian-born woman, her family conquer flames to survive Greek fire

    Looming election, loss of party subsidy spurs year-end fundraising frenzy

    Looming election, loss of party subsidy spurs year-end fundraising frenzy
    OTTAWA — The spectre of a looming election, combined with the imminent end of a generous public subsidy, has added a heightened sense of urgency to federal political parties' annual year-end fundraising frenzy.

    Looming election, loss of party subsidy spurs year-end fundraising frenzy

    'The Interview' to open in 27 Canadian theatres on Friday, Sony says

    'The Interview' to open in 27 Canadian theatres on Friday, Sony says
    TORONTO — After Americans had a chance to see "The Interview" in theatres, Canadians in some locations will also be able to watch the controversial movie on the big screen starting Friday.

    'The Interview' to open in 27 Canadian theatres on Friday, Sony says

    Google Canada aims to be 'appropriate,' not creepy, with mobile ad push in 2015

    Google Canada aims to be 'appropriate,' not creepy, with mobile ad push in 2015
    TORONTO — 2014 was the year Google saw Canadians really flock to mobile devices.

    Google Canada aims to be 'appropriate,' not creepy, with mobile ad push in 2015

    Terror attacks, Mountie killings, Ghomeshi scandal among top news events in 2014

    Terror attacks, Mountie killings, Ghomeshi scandal among top news events in 2014
    An in-brief look at some of the most significant news events of the last 12 months, in chronological order:

    Terror attacks, Mountie killings, Ghomeshi scandal among top news events in 2014

    Modernized Canadian frigate departs for Mediterranean Sea over Ukraine crisis

    Modernized Canadian frigate departs for Mediterranean Sea over Ukraine crisis
    HALIFAX — A Canadian frigate departed Halifax Tuesday to replace a sister ship that is part of a NATO maritime force aiming to reassure eastern European allies that are worried about the crisis in Ukraine.

    Modernized Canadian frigate departs for Mediterranean Sea over Ukraine crisis