Friday, December 26, 2025
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    Royal Bank pulls out of the Caribbean, prepares for slower growth: analyst

    Royal Bank pulls out of the Caribbean, prepares for slower growth: analyst
    TORONTO — The latest decision by Royal Bank (TSX:RY) to exit its international business in the Caribbean is another sign that Canadian banks are cutting their losses in the region and cleaning house, an analyst said Friday after RBC confirmed its making changes at its wealth management division.

    Royal Bank pulls out of the Caribbean, prepares for slower growth: analyst

    Mother of Woman Killed In Kamloops Crash Is 'Utterly And Completely Shattered'

    Mother of Woman Killed In Kamloops Crash Is 'Utterly And Completely Shattered'
    The mother of one of two people killed by a driver who crossed into the other lane on the Trans-Canada Highway near Spences Bridge says she is "utterly and completely shattered."

    Mother of Woman Killed In Kamloops Crash Is 'Utterly And Completely Shattered'

    Coquitlam Man Charged For Keying Over 100 Vehicles In The Lower Mainland

    Coquitlam Man Charged For Keying Over 100 Vehicles In The Lower Mainland
    NEW WESTMINSTER, B.C. — Charges have been approved for a man accused of keying over 100 Vancouver-area vehicles this month.

    Coquitlam Man Charged For Keying Over 100 Vehicles In The Lower Mainland

    Passport Fees A Cash Cow For Federal Government

    Passport Fees A Cash Cow For Federal Government
    The cost for a five-year passport increased to $120 from $87 last year, while a new 10-year passport was introduced at a cost of $160.

    Passport Fees A Cash Cow For Federal Government

    Nisga'a Sign Pipeline Benefits Deal With B.C., Back LNG Projects

    Nisga'a Sign Pipeline Benefits Deal With B.C., Back LNG Projects
    VICTORIA — The Nisga'a Nation has signed an agreement with the B.C. government to receive benefits from proposed liquefied natural gas projects.

    Nisga'a Sign Pipeline Benefits Deal With B.C., Back LNG Projects

    Yukon man tells court he can legally shoot wolves because of aboriginal rights

    Yukon man tells court he can legally shoot wolves because of aboriginal rights
    WHITEHORSE — A First Nations' man who claims to have an aboriginal right to shoot wolves has pleaded not guilty to three charges under the Yukon Wildlife Act.

    Yukon man tells court he can legally shoot wolves because of aboriginal rights