Saturday, December 27, 2025
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    No Sign Of Two Viruses In Some B.C. Salmon: Canadian Food Inspection Agency

    No Sign Of Two Viruses In Some B.C. Salmon: Canadian Food Inspection Agency
    VANCOUVER — Two viruses that can be fatal to some B.C. salmon species have failed to turn up in tests conducted by the Canadian Food Inspection Agency.

    No Sign Of Two Viruses In Some B.C. Salmon: Canadian Food Inspection Agency

    RCMP Announce Charges In Two Separate Cold-case Murders In Surrey

    RCMP Announce Charges In Two Separate Cold-case Murders In Surrey
    Homicide investigators in the Vancouver area have announced arrests in two separate cold cases. Both involve murders in Surrey, B.C. — the first in 2006 and the second in 2009.

    RCMP Announce Charges In Two Separate Cold-case Murders In Surrey

    Man Charged With Murder Of Woman In Vancouver Home Makes Court Appearance

    Man Charged With Murder Of Woman In Vancouver Home Makes Court Appearance
    SURREY, B.C. — A 28-year-old man accused of killing a woman in a Vancouver home has made his first court appearance.

    Man Charged With Murder Of Woman In Vancouver Home Makes Court Appearance

    Ceremony Honours 4 Airmen Whose Bodies Found Decades After Takeoff Near Victoria

    Ceremony Honours 4 Airmen Whose Bodies Found Decades After Takeoff Near Victoria
    VICTORIA — Four airmen have been laid to rest at a military service in Victoria — more than 70 years after they disappeared in their aircraft.

    Ceremony Honours 4 Airmen Whose Bodies Found Decades After Takeoff Near Victoria

    Brampton, Ontario, Has Most Unaffordable Daycare

    Brampton, Ontario, Has Most Unaffordable Daycare
    A city west of Toronto has been named the least affordable place in Canada for regulated daycare. The study, titled The Parent Trap and released by the Canadian Centre for Policy Alternatives, says childcare rates in Brampton, Ont., are the most disproportionate in the country.

    Brampton, Ontario, Has Most Unaffordable Daycare

    Pipeline Issues Are Scabs On People's Lives: Rocker Neil Young In Vancouver

    Pipeline Issues Are Scabs On People's Lives: Rocker Neil Young In Vancouver
    VANCOUVER — Music icon Neil Young says Canadians need to stand up for clean air, land and water by taking on big oil companies in particular.

    Pipeline Issues Are Scabs On People's Lives: Rocker Neil Young In Vancouver