Sunday, December 28, 2025
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    Stuckless guilty of 2 counts of gross indecency;acquitted on 2 counts of buggery

    Stuckless guilty of 2 counts of gross indecency;acquitted on 2 counts of buggery
    TORONTO — Months after pleading guilty to 100 charges related to the sexual abuse of 18 boys, the man at the centre of the Maple Leaf Gardens sex scandal has been convicted in two more charges linked to two of those victims.  

    Stuckless guilty of 2 counts of gross indecency;acquitted on 2 counts of buggery

    Even Canadian oil could be affected: A look at wide-ranging U.S. midterm results

    Even Canadian oil could be affected: A look at wide-ranging U.S. midterm results
    WASHINGTON — It didn't take the Canadian government long to note the far-reaching policy implications of the Republican wave in Tuesday's midterm U.S. elections.

    Even Canadian oil could be affected: A look at wide-ranging U.S. midterm results

    Conservatives shutting door to immigrants in polygamous, forced marriages

    Conservatives shutting door to immigrants in polygamous, forced marriages
    OTTAWA — Citizenship and Immigration Minister Chris Alexander will introduce legislation later today to ban people in polygamous and forced marriages from immigrating to Canada.

    Conservatives shutting door to immigrants in polygamous, forced marriages

    Two Liberal MPs kicked out of caucus amid allegations of misconduct

    Two Liberal MPs kicked out of caucus amid allegations of misconduct
    OTTAWA — Two Liberal MPs have been kicked out of their party's caucus amid accusations of personal misconduct made by two female members of the NDP.

    Two Liberal MPs kicked out of caucus amid allegations of misconduct

    BC Hydro and LNG Canada Sign Power Deal But Project Decision Still Not Final

    BC Hydro and LNG Canada Sign Power Deal But Project Decision Still Not Final
    VICTORIA — B.C.'s minister of natural gas development says a liquefied natural gas plant developer has committed to powering part of its proposed operations with electricity.

    BC Hydro and LNG Canada Sign Power Deal But Project Decision Still Not Final

    Aboriginal Past Irrelevant In Sex Assault Case: BC Court

    Aboriginal Past Irrelevant In Sex Assault Case: BC Court
    KAMLOOPS, B.C. — British Columbia's top court has dismissed the appeal of a man who tried to rape a sleeping 18-year-old woman, saying his difficult aboriginal past is irrelevant.

    Aboriginal Past Irrelevant In Sex Assault Case: BC Court