Wednesday, December 31, 2025
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    Ebola vaccines not a magic bullet, but could be part of solution: WHO

    Ebola vaccines not a magic bullet, but could be part of solution: WHO
    TORONTO - A senior official of the World Health Organization says experimental Ebola vaccines are not a magic bullet that will resolve the crisis in West Africa.

    Ebola vaccines not a magic bullet, but could be part of solution: WHO

    Enbridge stands ground, tells National Energy Board that Line 9 design is safe

    Enbridge stands ground, tells National Energy Board that Line 9 design is safe
    CALGARY - Enbridge Inc. (TSX:ENB) insists in a regulatory filing that its design for the Line 9 pipeline through southern Ontario has the right shut-off valve configuration to minimize the risk to waterways and reservoirs in the event of a rupture.

    Enbridge stands ground, tells National Energy Board that Line 9 design is safe

    Slain soldier expected to be returned home to Hamilton today, reports say

    Slain soldier expected to be returned home to Hamilton today, reports say
    TORONTO - Several reports say the body of Cpl. Nathan Cirillo, gunned down in Ottawa this week, will be returned to his hometown of Hamilton via the Highway of Heroes today.

    Slain soldier expected to be returned home to Hamilton today, reports say

    Gunman angry about not getting passport, had drug problems, say shelter mates

    Gunman angry about not getting passport, had drug problems, say shelter mates
    OTTAWA - The man who killed a soldier at the National War Memorial was angry about failing to get a passport and struggled with drug addiction, say those who knew him at the downtown Ottawa men's shelter where he spent the last two weeks.

    Gunman angry about not getting passport, had drug problems, say shelter mates

    Thanksgiving gravy train: Edmonton couple wins $30M on harvest holiday weekend

    Thanksgiving gravy train: Edmonton couple wins $30M on harvest holiday weekend
    ST. ALBERT, Alta. - An Edmonton couple had plenty to be thankful for on the Thanksgiving weekend after winning a lottery jackpot worth almost $31 million.

    Thanksgiving gravy train: Edmonton couple wins $30M on harvest holiday weekend

    Magnotta murder trial hears police experts analyzed accused's laptops

    Magnotta murder trial hears police experts analyzed accused's laptops
    MONTREAL - Luka Rocco Magnotta's first-degree murder trial heard today that a search of his laptop contained no evidence that a video of the slaying of a Chinese engineering student was uploaded from it.

    Magnotta murder trial hears police experts analyzed accused's laptops