Thursday, January 1, 2026
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    Coalition for Quebec's Future retains riding near Quebec City

    Coalition for Quebec's Future retains riding near Quebec City
    LEVIS, Que. - Quebec's third-placed party retained a stronghold in a provincial byelection on Monday that was called after one of its most prominent members stepped down.

    Coalition for Quebec's Future retains riding near Quebec City

    Federal Conservatives under fire after 'blind luck' keeps drifting ship afloat

    Federal Conservatives under fire after 'blind luck' keeps drifting ship afloat
    OTTAWA - B.C.'s northern coast dodged a bullet this week when a disabled cargo ship drifted dangerously close to the shores of Haida Gwaii, opposition critics charged Monday in the House of Commons.

    Federal Conservatives under fire after 'blind luck' keeps drifting ship afloat

    Randall Litman of Calgary wins Lays chip contest with his Mac ‘N Cheese flavour

    Randall Litman of Calgary wins Lays chip contest with his Mac ‘N Cheese flavour
    MISSISSAUGA, Ont. - Jalapeno Mac N' Cheese beat the competition to become Canadians' preferred flavour in a potato chip contest.

    Randall Litman of Calgary wins Lays chip contest with his Mac ‘N Cheese flavour

    N.B.'s new premier to oilpatch: support for Energy East has not wavered

    N.B.'s new premier to oilpatch: support for Energy East has not wavered
    CALGARY - New Brunswick's new premier said Monday he's looking to assure Alberta's oilpatch that even though the government has changed, its support for the Energy East pipeline has not.

    N.B.'s new premier to oilpatch: support for Energy East has not wavered

    Magnotta murder trial hears from British reporter who interviewed accused in 2011

    Magnotta murder trial hears from British reporter who interviewed accused in 2011
    MONTREAL - A journalist from England is testifying today at Luka Rocco Magnotta's first-degree murder trial.

    Magnotta murder trial hears from British reporter who interviewed accused in 2011

    Left-leaning think tank raises new questions about bias in tax agency audits

    Left-leaning think tank raises new questions about bias in tax agency audits
    OTTAWA - A left-leaning think tank is raising new questions about the possibility of political interference in audits of charities.

    Left-leaning think tank raises new questions about bias in tax agency audits