Wednesday, May 20, 2026
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    Lower gas prices help slow inflation rate to 2.0 per cent: Statistics Canada

    Lower gas prices help slow inflation rate to 2.0 per cent: Statistics Canada
    OTTAWA — A big drop in pump prices helped slow Canada's annual inflation rate last month to 2.0 per cent as it offset rising costs of other goods, says Statistics Canada.

    Lower gas prices help slow inflation rate to 2.0 per cent: Statistics Canada

    In Cuba, prisoner swap overshadows historic restoration of relations with U.S.

    In Cuba, prisoner swap overshadows historic restoration of relations with U.S.
    Amazingly, the restoration of diplomatic relations with the United States and the sea of potential consequences that opens up appeared not to be the biggest news story in Cuba.

    In Cuba, prisoner swap overshadows historic restoration of relations with U.S.

    Alberta's political earthquake has Tories, NDP considering federal fallout

    Alberta's political earthquake has Tories, NDP considering federal fallout
    OTTAWA — Federal Conservatives say they're gobsmacked over the political tectonic shifts in Alberta this week, but they don't have to reach too far into their own history to see parallels with the political pragmatism that's at play.

    Alberta's political earthquake has Tories, NDP considering federal fallout

    Computer Virus Infects B.C. Government Email Servers

    Computer Virus Infects B.C. Government Email Servers
    VICTORIA — A computer virus has forced the British Columbia government to shut down its email system, cutting off the information flow for much of the day.

    Computer Virus Infects B.C. Government Email Servers

    Kenneth Knutson Accused Of Shooting Mountie In Kamloops Now Faces Six Charges

    Kenneth Knutson Accused Of Shooting Mountie In Kamloops Now Faces Six Charges
    KAMLOOPS, B.C. — Two new charges have been laid against a man accused of shooting a Mountie in Kamloops, B.C., during a traffic stop.

    Kenneth Knutson Accused Of Shooting Mountie In Kamloops Now Faces Six Charges

    Stolen Suitcase Found In B.C. But Missing Most Of Dead Sister's Belongings

    Stolen Suitcase Found In B.C. But Missing Most Of Dead Sister's Belongings
    NANAIMO, B.C. — Police have recovered a stolen suitcase that contained the prized belongings of a dead B.C. woman, but most of items her sister had saved are still missing.

    Stolen Suitcase Found In B.C. But Missing Most Of Dead Sister's Belongings