Wednesday, May 20, 2026
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    Long-planned federal measures aim to reduce rail-crossing crashes

    Long-planned federal measures aim to reduce rail-crossing crashes
    OTTAWA — The federal government has introduced long-awaited regulations aimed at reducing deadly train collisions at level crossings.

    Long-planned federal measures aim to reduce rail-crossing crashes

    Ottawa poised to buy additional C-17 cargo jet as Boeing closes assembly line

    Ottawa poised to buy additional C-17 cargo jet as Boeing closes assembly line
    OTTAWA — The Harper government has signed off on a proposal to buy an additional C-17 Globemaster, bringing to five the number of heavy-lift transport planes in the air force's arsenal.

    Ottawa poised to buy additional C-17 cargo jet as Boeing closes assembly line

    BC Man Serving Life Sentence For Killing Armstrong Teen Attacked Two Other Women

    BC Man Serving Life Sentence For Killing Armstrong Teen Attacked Two Other Women
    KELOWNA, B.C. — A 28-year-old B.C. man serving a life sentence for killing an Armstrong teen has pleaded guilty to two earlier attacks on women.

    BC Man Serving Life Sentence For Killing Armstrong Teen Attacked Two Other Women

    White House thanks Canada for hosting key meetings between U.S., Cuba

    White House thanks Canada for hosting key meetings between U.S., Cuba
    OTTAWA — The White House is extending its thanks to Canada for hosting the meetings that let to the United States and Cuba agreeing to re-establish diplomatic relations and open economic and travel ties.

    White House thanks Canada for hosting key meetings between U.S., Cuba

    Judge finds man guilty of killing, burning Saskatoon woman's body

    Judge finds man guilty of killing, burning Saskatoon woman's body
    SASKATOON — A Saskatoon judge says a man's admission to undercover police about killing and burning the body of a woman met the test set out by the Supreme Court of Canada.

    Judge finds man guilty of killing, burning Saskatoon woman's body

    Canadian oilsands exporters narrowly survive vote in European Parliament

    Canadian oilsands exporters narrowly survive vote in European Parliament
    OTTAWA — Canadian oilsands exporters narrowly survived a vote in the European Parliament on Wednesday that could have once again penalized Alberta bitumen as dirty oil.

    Canadian oilsands exporters narrowly survive vote in European Parliament