Sunday, May 24, 2026
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    Woman Killed By Tractor Trailer In New Westminster; Police Seek Driver

    Woman Killed By Tractor Trailer In New Westminster; Police Seek Driver
    NEW WESTMINSTER, B.C. — A 52-year-old female pedestrian is dead after being struck by a tractor trailer Wednesday evening in New Westminster, B.C.

    Woman Killed By Tractor Trailer In New Westminster; Police Seek Driver

    Avian Flu Detected At Two More Farms In B.C. As Outbreak Continues To Spread

    Avian Flu Detected At Two More Farms In B.C. As Outbreak Continues To Spread
    VANCOUVER — Birds at two more farms in southwestern British Columbia have tested positive for avian influenza, the Canadian Food Inspection Agency said Wednesday — underscoring the difficulty facing officials attempting to contain the virus.

    Avian Flu Detected At Two More Farms In B.C. As Outbreak Continues To Spread

    Pilot Hospitalized After Cessna Crashes At Airport In B.C.'s Fraser Valley

    Pilot Hospitalized After Cessna Crashes At Airport In B.C.'s Fraser Valley
    PITT MEADOWS, B.C. — Emergency responders say the crash of a Cessna airplane at an airport in British Columbia's Fraser Valley has sent the pilot to hospital.

    Pilot Hospitalized After Cessna Crashes At Airport In B.C.'s Fraser Valley

    Man Accused Of Attacking B.C. Doctor Faces Psychiatric Assessment

    Man Accused Of Attacking B.C. Doctor Faces Psychiatric Assessment
    The man accused of attacking a doctor in the psychiatric ward at the hospital in Penticton, B.C., will undergo a mental-health assessment to determine if he can be held criminally responsible for his alleged actions.

    Man Accused Of Attacking B.C. Doctor Faces Psychiatric Assessment

    Firefighters Free Vancouver Island Man Trapped In Home Destroyed By Mudslide

    Firefighters Free Vancouver Island Man Trapped In Home Destroyed By Mudslide
    NANAIMO, B.C. — Firefighters on central Vancouver Island had to use chainsaws to free a man trapped inside his home that was partially buried by a mudslide.

    Firefighters Free Vancouver Island Man Trapped In Home Destroyed By Mudslide

    Lululemon Q3 Profit Falls Less Than Expected But Guidance Short Of Estimate

    Lululemon Q3 Profit Falls Less Than Expected But Guidance Short Of Estimate
    The Vancouver-based clothing company's net income was 42 cents US per share, down from 46 cents per share a year earlier.

    Lululemon Q3 Profit Falls Less Than Expected But Guidance Short Of Estimate