Wednesday, December 17, 2025
ADVT 
National

City Shares Proposed Design For Granville Bridge Connector, Seeks Public Input In Final Phase Of Engagement

22 Jan, 2020 08:44 PM

    After receiving almost 8,000 survey responses from the public, City staff are recommending the “West Side Plus” design option for the Granville Bridge Connector.

     

    Starting January 24, the public will have the opportunity to share final feedback before a proposed design is presented to City Council for decision.


    “West Side Plus was by far the most popular option with the public during two previous rounds of engagement,” said Paul Storer, Manager of Transportation Design. “People also shared ideas, many of which we’ve been able to incorporate, for improving the design to ensure it offers the best possible experience for users.”


    West Side Plus features


    The proposed design for the West Side Plus option includes wide, accessible sidewalks on both sides of the main span of the bridge, and a two-way bike lane on the west side. It also includes safety improvements at ramp crossings, and improvements at each end of the bridge to link the Connector to the rest of the area’s walking and cycling network. The design leaves the bridge with enough capacity to accommodate transit vehicles and motorists.


    “As the City’s population grows and climate-change concerns intensify, the need to offer sustainable travel options has never been more important,” says Storer. “This project will give people more travel options to and from downtown that don’t contribute to congestion or pollution.”


    In 2016, 18,000 residents and 17,000 jobs were within a five-minute walk of Granville Bridge and 90,000 residents and 125,000 jobs were within a five-minute bike ride. Despite being a direct route to and from downtown, few people bike or use the bridge’s sidewalks because they feel unsafe and uncomfortable or because it’s not accessible.


    As the City grows, even more people will live and work within easy walking and cycling distance of the bridge. Once the Granville Bridge Connector is completed, all three False Creek bridges will offer safe and accessible options for walking, rolling, and biking to and from downtown.


    The proposed design represents a vision for the long-term configuration of the bridge and will cost $30-40 million, excluding means prevention fencing. Like many capital projects, the project would likely be delivered in phases and through partnerships.


    The City’s current capital budget includes $25 million for the Granville Bridge Connector. This spring, staff will present to Council a conceptual, phased budget for the project that will include the first phase of work that falls within the 2019-2022 capital budget.

    MORE National ARTICLES

    Man Faces Two Dozen Charges After Crime Wave In Penticton, B.C.

    PENTICTON, B.C. - A man who police say was responsible for a car-jacking crime spree in Penticton, B.C., faces more than a dozen new charges to go with 11 additional allegations laid after his arrest in September.

    Man Faces Two Dozen Charges After Crime Wave In Penticton, B.C.

    Latest Winter Storm To Lash B.C. With High Winds, Heavy Rain And Snow

    Environment Canada has posted warnings or special weather statements for much of central and southern B.C., while BC Hydro says it is bracing for electrical outages caused by high winds.

    Latest Winter Storm To Lash B.C. With High Winds, Heavy Rain And Snow

    Three Day Search For Skier In Southeastern B.C. Ends With Man Found Alive, Well

    TRAIL, B.C. - Members of a southeastern British Columbia search team are celebrating 2020 with what they call an "incredible" day.

    Three Day Search For Skier In Southeastern B.C. Ends With Man Found Alive, Well

    More Than 30K Without Power In BC's Central And Southern Interior, Utility Says

    VANCOUVER - BC Hydro says around 34,000 customers in the central and southern Interior woke up to greet the new year without power on Wednesday morning.    

    More Than 30K Without Power In BC's Central And Southern Interior, Utility Says

    Top CEOs Made As Much As Average Worker Earns In A Year By Mid-Morning Today

    Top CEOs Made As Much As Average Worker Earns In A Year By Mid-Morning Today
    OTTAWA - A new report says Canada's 100 highest-paid chief executives were paid record amounts in 2018 in comparison to the employees beneath them.

    Top CEOs Made As Much As Average Worker Earns In A Year By Mid-Morning Today

    Iconic Gander Airport Lounge Aims To Reopen As Hub For Community, Tourists

    Iconic Gander Airport Lounge Aims To Reopen As Hub For Community, Tourists
    Reg Wright, president and CEO of the airport, says the "glamour of aviation really coloured what the community was."

    Iconic Gander Airport Lounge Aims To Reopen As Hub For Community, Tourists