Friday, December 19, 2025
ADVT 
National

City Shares Proposed Design For Granville Bridge Connector, Seeks Public Input In Final Phase Of Engagement

22 Jan, 2020 08:44 PM

    After receiving almost 8,000 survey responses from the public, City staff are recommending the “West Side Plus” design option for the Granville Bridge Connector.

     

    Starting January 24, the public will have the opportunity to share final feedback before a proposed design is presented to City Council for decision.


    “West Side Plus was by far the most popular option with the public during two previous rounds of engagement,” said Paul Storer, Manager of Transportation Design. “People also shared ideas, many of which we’ve been able to incorporate, for improving the design to ensure it offers the best possible experience for users.”


    West Side Plus features


    The proposed design for the West Side Plus option includes wide, accessible sidewalks on both sides of the main span of the bridge, and a two-way bike lane on the west side. It also includes safety improvements at ramp crossings, and improvements at each end of the bridge to link the Connector to the rest of the area’s walking and cycling network. The design leaves the bridge with enough capacity to accommodate transit vehicles and motorists.


    “As the City’s population grows and climate-change concerns intensify, the need to offer sustainable travel options has never been more important,” says Storer. “This project will give people more travel options to and from downtown that don’t contribute to congestion or pollution.”


    In 2016, 18,000 residents and 17,000 jobs were within a five-minute walk of Granville Bridge and 90,000 residents and 125,000 jobs were within a five-minute bike ride. Despite being a direct route to and from downtown, few people bike or use the bridge’s sidewalks because they feel unsafe and uncomfortable or because it’s not accessible.


    As the City grows, even more people will live and work within easy walking and cycling distance of the bridge. Once the Granville Bridge Connector is completed, all three False Creek bridges will offer safe and accessible options for walking, rolling, and biking to and from downtown.


    The proposed design represents a vision for the long-term configuration of the bridge and will cost $30-40 million, excluding means prevention fencing. Like many capital projects, the project would likely be delivered in phases and through partnerships.


    The City’s current capital budget includes $25 million for the Granville Bridge Connector. This spring, staff will present to Council a conceptual, phased budget for the project that will include the first phase of work that falls within the 2019-2022 capital budget.

    MORE National ARTICLES

    Community Gaming Grants Support Environmental Youth Programs

    In a small plant nursery tucked away in Vancouver’s Downtown Eastside, Marika Van Reeuwyk assists a dozen youth with planting the last of their big leaf lupine and springbank clover.

    Community Gaming Grants Support Environmental Youth Programs

    BC Liberal MLAs Raise Questions About Government Security And Accountability In The Wake Of The Lifelabs Cyberattack

    BC Liberal MLAs Raise Questions About Government Security And Accountability In The Wake Of The Lifelabs Cyberattack
    The BC Liberal MLAs are demanding that John Horgan and the NDP outline what measures they will take to ensure the government is not vulnerable to future data breaches and extortion attempts.

    BC Liberal MLAs Raise Questions About Government Security And Accountability In The Wake Of The Lifelabs Cyberattack

    Ontario Making it Easier for Businesses to Find Skilled Workers

    Regional Immigration Pilot to Fill Labour Gaps, Attract Top Talent in Rural Ontario

    Ontario Making it Easier for Businesses to Find Skilled Workers

    Vancouver Working Hard To Manage Traffic Impacts During 2020 Water Main Work On Georgia St

    The City is asking commuters to plan ahead and to expect delays as it manages traffic impacts from water main and third-party construction work on West Georgia St early next year.

    Vancouver Working Hard To Manage Traffic Impacts During 2020 Water Main Work On Georgia St

    Vancouver Council Approves West Side Moderate Income Rental Housing Project

    Vancouver Council Approves West Side Moderate Income Rental Housing Project
    The project, located at 1805 Larch Street, will deliver 63 new rental homes on the west side of Vancouver, with 13 secured at below market rents, and over 40% of these homes will be suitable for families.

    Vancouver Council Approves West Side Moderate Income Rental Housing Project

    3 Minute Film Festival Contest In Delta

    Get ready for a brand new film festival happening in Delta as a part of Heritage Week 2020.

    3 Minute Film Festival Contest In Delta