Saturday, December 20, 2025
ADVT 
National

City Shares Proposed Design For Granville Bridge Connector, Seeks Public Input In Final Phase Of Engagement

22 Jan, 2020 08:44 PM

    After receiving almost 8,000 survey responses from the public, City staff are recommending the “West Side Plus” design option for the Granville Bridge Connector.

     

    Starting January 24, the public will have the opportunity to share final feedback before a proposed design is presented to City Council for decision.


    “West Side Plus was by far the most popular option with the public during two previous rounds of engagement,” said Paul Storer, Manager of Transportation Design. “People also shared ideas, many of which we’ve been able to incorporate, for improving the design to ensure it offers the best possible experience for users.”


    West Side Plus features


    The proposed design for the West Side Plus option includes wide, accessible sidewalks on both sides of the main span of the bridge, and a two-way bike lane on the west side. It also includes safety improvements at ramp crossings, and improvements at each end of the bridge to link the Connector to the rest of the area’s walking and cycling network. The design leaves the bridge with enough capacity to accommodate transit vehicles and motorists.


    “As the City’s population grows and climate-change concerns intensify, the need to offer sustainable travel options has never been more important,” says Storer. “This project will give people more travel options to and from downtown that don’t contribute to congestion or pollution.”


    In 2016, 18,000 residents and 17,000 jobs were within a five-minute walk of Granville Bridge and 90,000 residents and 125,000 jobs were within a five-minute bike ride. Despite being a direct route to and from downtown, few people bike or use the bridge’s sidewalks because they feel unsafe and uncomfortable or because it’s not accessible.


    As the City grows, even more people will live and work within easy walking and cycling distance of the bridge. Once the Granville Bridge Connector is completed, all three False Creek bridges will offer safe and accessible options for walking, rolling, and biking to and from downtown.


    The proposed design represents a vision for the long-term configuration of the bridge and will cost $30-40 million, excluding means prevention fencing. Like many capital projects, the project would likely be delivered in phases and through partnerships.


    The City’s current capital budget includes $25 million for the Granville Bridge Connector. This spring, staff will present to Council a conceptual, phased budget for the project that will include the first phase of work that falls within the 2019-2022 capital budget.

    MORE National ARTICLES

    Another Record-Setting Year For Coquitlam RCMP’s Cram The Cruiser Fundraiser

    Neither rain, nor cold, nor more rain could stop the donations coming in for the 2019 Cram the Cruiser event.

    Another Record-Setting Year For Coquitlam RCMP’s Cram The Cruiser Fundraiser

    Over 1,500 New Student Seats Coming To Chilliwack

    Over 1,500 New Student Seats Coming To Chilliwack
    Families in Chilliwack can look forward to more than 1,500 new student seats that will provide the learning environments that students deserve.    

    Over 1,500 New Student Seats Coming To Chilliwack

    New Partnership Building Rental Homes For Langley Families

    Construction is underway on Solaro, which will provide 98 rental homes for individuals and families at 22304 - 50th Ave. in Murrayville.

    New Partnership Building Rental Homes For Langley Families

    Buying BC Like Never Before: 2018 Record Year For Food Sales

    B.C. farmers, ranchers, seafood and processing workers contributed to a record-setting year in 2018, with annual revenue from businesses in those sectors reaching $15 billion for the first time.

    Buying BC Like Never Before: 2018 Record Year For Food Sales

    New Rental Homes Open For People In Mission

    Close to 70 new affordable homes are now available for low- to middle-income families and individuals as a new rental apartment building has opened in Mission.

    New Rental Homes Open For People In Mission

    'Road Zipper' To Bring Rush-hour Relief For Alex Fraser Bridge Commuters

    A new lane on the the Alex Fraser Bridge — and the strange vehicle that will switch the lane's direction twice a day — will shave about 20 minutes off the daily commute for motorists travelling over the bridge during rush hour, officials say.  

    'Road Zipper' To Bring Rush-hour Relief For Alex Fraser Bridge Commuters